Browse > Article
http://dx.doi.org/10.7734/COSEIK.2013.26.1.89

Applications of Construction Sequence Analyses to Prototype Models of Twisted Tall Buildings  

Choe, Mi-Mi (Department of Architectural Engineering, Graduate School, Kwangwoon Univ.)
Kim, Jae-Yo (Department of Architectural Engineering, Kwangwoon Univ.)
Eom, Tae-Sung (Department of Architecture, Catholic University of Daegu)
Jang, Dong-Woon (Building Construction Technology Department, Ssangyong E&C)
Publication Information
Journal of the Computational Structural Engineering Institute of Korea / v.26, no.1, 2013 , pp. 89-97 More about this Journal
Abstract
With regard to complex-shaped tall buildings whose plans and constructions have been gradually on the increase, this study was aimed to analyze their structural behaviors during construction by applications of construction sequences analyses to prototype models. For twisted tall buildings, total 18 models of with three conditions of a lateral load-resisting system, a twisting angle, and a construction method were selected. A diagrid system and a braced tube system were applied as a lateral load-resisting system. For each lateral load-resisting system, three types of plan with $0^{\circ}$, $1^{\circ}$, and $2^{\circ}$ twisting angles and three construction methods with construction sequences of exterior tube and interior frame were assumed. The structural performances of tall buildings under constructions were analyzed with results of lateral displacements from construction sequence analyses. Also, construction performances of the construction period and the maximum lift weight were compared.
Keywords
tall building; complex-shape; construction sequence analysis; construction; twisted shapes;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Baik, I.H. (2007) Case Study that Achieved by 3-Days Cycle Construction per Floor in Framework through Applying N Method and American Installation Method, Journal of the Architectural Institute of Korea (Structure & Construction), 23(9), pp.231-238.   과학기술학회마을
2 Eom, T.S., Kim, J.Y. (2009), An Application of Construction Sequence Analysis for Checking Structural Stability of High-Rise Building under Construction, COSEIK J. Comput. Struct. Eng., 22(3), pp.211-221.   과학기술학회마을
3 Ha, T.H., Lee, S.H. (2012) Advanced Staged Analysis Program for Precise Construction of RC Tall Buildings, KCI Journal, 24(4), pp.34-38.
4 Kim, W.S. (2001) Case Study for Construction of High-Rise Residential Building of Samsung Dogokdong Tower Palace, 1(1), pp.33-43.
5 Kim, Y.M., Kim, C.K., Choi, H.C. (2012) Selection of Optimal Structural System for Complex-shaped Super-tall Building Structural Systems Using Parametric Design Technique, Journal of the Architectural Institute of Korea (Structure & Construction), 28(1), pp.77-84.   과학기술학회마을
6 MIDAS IT (2004), Design and Construction of High-rise Buildings by Using Construction Sequence Analysis, MIDAS Structural Technical Lecture Series
7 Moon, K.S. (2012a) Diagrid Structures for Complex-Shaped Tall Buildings, Advanced Materials Research , Volumes 405-451, pp.1489-1492.
8 Moon, K.S. (2012b) Braced Tube Structures for Complex-Shaped Tall Buildings, Advanced Materials Research , Volumes 405-451, pp.1584-1587.
9 Vollers, K. (2008) Morphological Scheme of Second-Generation Non-Orthogonal High-Rise, CTBUH 8th World Congress.