• Title/Summary/Keyword: Construction of complex

Search Result 1,951, Processing Time 0.037 seconds

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

Opportunities for Synergistic Collaboration between U.S. and Asia in Construction Business, Research, and Education

  • Liu, LiangY.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.3-8
    • /
    • 2007
  • "The world is flat" as the popular author Thomas L. Friedman declares in his best belling book about the progress of business globalization in the $21^{st}$ century [3]. Construction projects and related businesses have been global since the 1800's, but it has never seen such rapid transformation in both scope and depth as in the past decade. Construction projects today often bring together international design talents, construction management firms, local and international labor forces, and global suppliers. On a visit to Dubai in the United Arab Emirates on the Persian Gulf, a person will experience the complexity of globalization of modern construction projects- with Arab owners, European engineering and design companies, American construction management teams, Korean general contractors, Jordanian subcontractors, and labor forces from Thailand, Indonesia, Turkey, and Sri Lanka. A count of material suppliers reveals over 60 countries involved, covering all continents. Indeed construction projects are getting more and more complex and competitive, as is the project execution. The trend toward globalization poses both challenges and opportunities to construction and engineering companies competing on a global scale. While global competition may be a threat to many companies, there are, however, many opportunities for synergistic collaborations that can create win-win scenarios for construction business, research, and education. This paper presents some of the opportunities between the U.S. and Asia in business integration, research collaboration on technologies, and educational development, which may mutually benefit countries on either side of the Pacific.

  • PDF

A Feasibility Study on Construction of the Youth Complex Center (청소년수련과 건설사업 타당성분석)

  • No, Byeong-Ok;Song, Jin-U;Choe, Sang-Hyeon;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities arc to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is and effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260㎡ come into analysis to the best gross area. The finally, it is to study on economical efficiency. Income Statement estimated was came out ₩1,7billion. in addition, it offer various benefit by public facilities.

  • PDF

A Feasibility Study on Construction of the Youth Complex Center (청소년수련관 건설사업 타당성분석)

  • 노병옥;송진우;최상현;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is an effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260$m^2$ cone into analysis to the best gross area The finally, it is to study on economical efficiency. Income Statement estimated was came out \1.7billion. in addition, it offer various benefit by public facilities.

  • PDF

A Simple Formula for the Number of Lifting Times of Finishing Materials in High-rise Complex Building Construction (마감자재 양중횟수 산정 약산식 제안 - 초고층 주상복합 건물)

  • Mun Min-Sik;Choi Seock-Hyun;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.622-625
    • /
    • 2003
  • The purpose of the study is to propose a simple formula of lifting times of finishing materials on establishing the high-rise complex building, it is expected to help the efficient planning of lifting. The planning of lifting the finishing materials becomes important as the buildings get higher. The efficient level of lifting times has been calculated from 'Packaging' to improve the existing studies on the planning of lifting ; 'Packaging' means 'Making a bundle as one unit' basing on the characteristics of the individual materials. The simple formula has been produced regarding two variables of the typical floor area and the number of rooms per area.

  • PDF

Cost Analysis of Vertical Greenery in Urban Complex

  • Dong, Nannan;Huang, Fang
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.1
    • /
    • pp.29-34
    • /
    • 2021
  • Vertical greenery has become an important technological means to improve the ecological environment condition in urban high-density areas, especially in central areas of Chinese cities. The cost of vertical greenery has significantly increased both in the decision-making process of architectural design and in the assessment of the sustainability potential of urban complexes. The estimation and evaluation of the cost of vertical greenery have become important obstacles to multi-party investment in the construction of vertical greenery. Considering the factors of the building typology and full life-cycle cost, this paper constructs an assessment model of vertical greenery in seven types in urban complex, and suggests an optimized approach to vertical greenery in an urban complex.

The Guideline structure for improving sustainability in building construction projects (건축 프로젝트의 친환경성 제고를 위한 사업관리 가이드라인 구성 체계 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.26-27
    • /
    • 2014
  • Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.

  • PDF

Study on the Connection Node System of Irregular-shaped Curtain wall Facade using 3D Printed Smart Node System (자유형상 커튼월 구현을 위한 3D 프린팅을 활용한 스마트노드 시스템의 연구)

  • Na, SangHo;Yoo, SeungKyu;Park, YoungMi;Park, JungJoon;Kim, SungJin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.8-9
    • /
    • 2018
  • 3D printing has the unique advantage of the ability to customize freeform product even in small quantity. However, we need to select and apply the only necessary parts of it because of the high cost of the manufacturing technology. It is of critical importance in irregular-shaped curtain walls to ensure precision of construction as well as quality fo finish. Complex shape that have structural members at varying angles can have nodes of different shapes making it unfeasible to construct using a general node connection detail. Therefore, this study aims to utilize smart node system using 3D printing as a solution to complex irregular-shaped curtain wall design.

  • PDF

A study on System Requirement Structure of LRT's System on the advanced Systems Engineering (시스템엔지니어링 기법 적용에 따른 경량전철시스템 요구사항체계 구축에 관한 연구)

  • Heo, Jae-Hun;Bae, Joon-Ho;Choi, Won-Chan;Bae, Sung-Hoon;Joo, Ji-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1523-1529
    • /
    • 2011
  • Light Rail Transit is system that offer target Performance and function because various sub-system such as vehicles, power supply, signaling, communication, mechanical, track, civil is consisted as large complex system. Light Rail Transit and the complex system of safety, reliability to be a behavior, and target performance and function properly to system's configuration, design, manufacture, installation and test verification, through operations system requirements to accurately describe what It is more important. With this study, light rail system KSX ISO/IEC 15288 system life cycle process by applying engineering techniques utilizing light rail system in the early stages of construction from the concept, design, production, operation, maintenance and end-use to the disposal stage throughout the entire life cycle, from the beginning of construction until the end of construction of the stakeholder to define requirements, analyze the introduction of the system developers and system requirement of those who wish to be described accurately by selecting the best system and system requirement in order to achieve their purpose.

  • PDF