• Title/Summary/Keyword: Construction of airport

Search Result 198, Processing Time 0.025 seconds

Signal Analysis from a Long-Term Bridge Monitoring System in Yongjong Bridge (영종대교 계측시스템의 신호데이터 분석)

  • Kim, Sung-Kon;Koh, Hyun-Moo;Lee, Jung-Whee;Bae, In-Hwan
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.9-18
    • /
    • 2006
  • This paper presents schematically the monitoring system installed in Yongjong Bridge, a self-anchored suspension bridge located in the expressway linking Seoul and Incheon International Airport. Automatic measurement of instrumented civil engineering structures is now widely applied for behavior monitoring during construction in field as well as long-term monitoring for lifetime assessment of bridge structures. A representative example of results that can be acquired through structural health monitoring system is presented by means of data measured during a few years after the opening of the bridge. In order to effectively measure the tension force for hangers that have relatively short length or high tension force, a static tension measurement device has been explored. Newly equipped railway system on the existing bridge results in change of dead load, consequently dynamic characteristics have also been changed. This result can be detected by the monitoring system during and after railway construction.

Ocean Wave Forecasting and Hindercasting Method to Support for Navigational Safety of Ship (선박의 항행안전지원을 위한 파랑추산에 관한 연구)

  • Shin, Seung-Ho;Hashimoto, Noriaki
    • Journal of Navigation and Port Research
    • /
    • v.27 no.2
    • /
    • pp.111-119
    • /
    • 2003
  • In order to improve navigational safety of ships, an ocean wave prediction model of high precision within a short time, dealing with multi-directional random waves from the information of the sea surface winds encountered at the planned ship's course, was introduced for construction of ocean wave forecasting system on the ship. In this paper, we investigated a sea disaster occurred by a stormy weather in the past. We analyzed the sea surface wind first and then carried out ocean wave hindercasting simulations according to the routes the sunken vessel. From the result of this study, we concluded that the sea disaster was caused by rapidly developed iou pressure system Okhotsk Sea and the predicted values by the third generation wave prediction model(WAM) was agreed well with the observed significant wave height, wave period, and directional wave spectrum. It gives a good applicability for construction of a practical on-board calculation system.

A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market (공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구)

  • Kim Min-Kee;Shin Sung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.265-270
    • /
    • 2002
  • Frequent design changes or unnecessary project executions due to illogical practice, lack of feasibility study and, hasty drive have raised problems of budget waste in Korean construction projects. Since the MOCT (Ministry of Construction & Transportation) published Master Plan for budget efficiency for government projects, there have been a lot of policy efforts for budget saving. However, it has been pointed out that cost management at the pre-construction phase, which greatly influences the cost still remains imperfect. The target cost for government clients is not being estimated reasonably, and cost controlling at the pre-construction phase is not yet being carried out properly for keeping the budget. Therefore, improved construction cost management at the pre-construction phase was proposed in this paper. The cost management systems of advanced countries were investigated for it, and the issues were drawn from the cost management systems of these countries. On the basis of the issues, the present conditions and problems of domestic construction cost management at the pre-construction phase were analyzed for suggestion.

  • PDF

Investment Priority and ImProvements in the Northeast Asia Logostics Hub Road Map (한국의 동북아 물류중심로드맵 투자우선순위와 개선방안)

  • Choe, Seok-Beom
    • Journal of Korea Port Economic Association
    • /
    • v.20 no.2
    • /
    • pp.187-216
    • /
    • 2004
  • Northeast Asia logistics hub strategy was undertaken by Korean Government to gain a national competitive advantage in Northeast Asia. Current Government has Northeast Asian Economic Hub Strategy including construction of SOC in Northeast Asia for promoting peace, promotion of formation of Northeast Asia Community, logistics hub, Financial hub and national innovation for R&D Cluster. To realize Northeast Asian logistics hub, the Northeast Asia logistics hub road map has undertaken as follows: expansion of logistics infra in Incheon Airport, Busan Port and Gwangyang Port, systematic improvements such as adjustment of investment distribution, special logistics companies, transparent customs in logistics transactions, logistics manpower, improvement of system supporting global logistics and attraction of international logistics companies to the logistics center, construction of seamless and paperless logistics information network, Northeast Asia railway infra. The purpose of this paper is to study investment priority and improvements in the Northeast Asia Logistics Hub Road Map and to contribute to gain the national competitive advantage as logistics hub in Northeast Asia

  • PDF

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Demonstration of Developed Numerical Procedure to Describe 3-dimensional Long-term Behavior of the Pleistocene Marine Foundations (Pleistocene 해저지반의 3차원 장기거동 해석을 위해 개발한 수치해석 기법의 입증)

  • Yun, Seong-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.7
    • /
    • pp.5-14
    • /
    • 2020
  • Kansai International Airport (KIX) was opened in September 1994. Although 26 years have passed since the completion of the first island, long-term settlement is still in progress. This settlement occurs in the Pleistocene layer. For it is not easy to determine the permeability of the Pleistocene sand layer because the thickness and the degree of fine content in the horizontal direction are constantly changing. In addition, it is also a difficult to predict the interactive behavior of the ground due to the construction of the second phase island adjacent to it. In order to solve this problem, a two-dimensional finite element analysis considering elasto-viscoplastic was performed to evaluate the long-term deformation, including the interactive behavior of the alternating Pleistocene foundation due to the construction of two adjacent reclaimed islands. In general, two-dimensional analysis can be used when a section can represent the entire sections. However, Kansai Airport is an artificial reclaimed island so two-dimensional analysis cannot solve the problem such as the stress deformation in the corners of the island. Additionally, the structure of the actual sub-ground through physical exploration is non-homogeneity and its thickness is also not constant. Therefore, there are limitations for the two-dimensional analysis to explain the phenomena. That is, three-dimensional analysis is strongly required. Due to these demands, the author extended the existing two-dimensional program capable of elasto-viscoplastic analysis to three-dimensional and completed the verification of the three-dimensional program developed through one-dimensional consolidation analysis. In order to demonstrate the validity of the developed 3D program that has been verified, an analysis is performed under the same analysis conditions as the existing research using a two-dimensional program. The effectiveness of the developed 3D numerical analysis program was demonstrated by comparing the analysis results with the 2D results and actual measurement data.

Direction toward Economic Development of Southwest Area of Jeonnam Province through Construction of Airport and Port Supporting Complex (공항만배후단지 조성을 통한 전남 서남권 경제발전방향에 관한 연구)

  • Park, Soomyung
    • Journal of Korea Port Economic Association
    • /
    • v.29 no.3
    • /
    • pp.39-72
    • /
    • 2013
  • As a regional development gap between Southwest and Southeast of Jeonnam Province are becoming more serious, it is highly time to come up with measures for the balanced development of the two areas. This paper suggests construction of the Airport and Port Supporting Complex in apparent efforts to reduce the gap between the two areas and facilitate the Southwest economy. The Supporting Complex aims to constitute a triangle industrial cluster which is classified into the following three categories; 1. Traditional competitive industries 2. New growth engine industries 3. Attraction of companies u-turning from abroad such as China etc. To provide one-stop service through set-up of R&D Business Center is the heart of this triangle core. This paper had LQ and Shift&Share Analysis in an attempt to search for competitive industries among the traditional industries in Mokpo-si(city) and Muan-gun(county) of Jeonnam Province. As a result of the analysis, metal manufacturing industry and metal-working process products industry have been found competitive in the two areas. Among the new growth engine industries, this paper suggests precision instruments industry and advanced parts industry for utmost strengths of airport and port while u-turning industries from abroad include higher value-added textile industry and fashion industry. It is expected that all of above-mentioned industries for the triangle industrial cluster will contribute to laying the groundwork to develop regional economy further and create more jobs in the Southwest area of Jeonnam Province.

Development of a PMIS Emphasizing On-Site Management Functions (현장 중심의 건설사업 관리시스템의 개발)

  • Shin Seung-Sik;Chun Jin-Yong;Kim Dae-Jin;Woo Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.545-548
    • /
    • 2003
  • In the past, there were problems in managing construction due to the lack of effective communication and sharing information between a constructor and an owner during construction works. To solve those problems, several major construction companies made great efforts to get a higher productivity through the systematic management, cumulating construction know-how. As a result of the endeavor, some of those companies developed the foundation of PMIS(Project Management Information System). However, it is thought that PMIS on the construction site was not effectively used in performing construction. Therefore, through the case of contractor's management system which is being used in 1-4 out field construction site in Incheon International Airport Rail of P construction company, this paper deals with the development of system supporting to the practical work of construction site and it'll provide to be the foundation of making effective PMIS.

  • PDF

Aggregate Distribution and Wind Erosion in Grass Land of the New Incheon International Airport (인천 신공항 잔디밭 조성지 토양의 입단분포 및 풍식 예측량 산정)

  • Jung, Yeong-Sang;Yoo, Sun-Ho;Choi, Byung-Kwon;Joo, Young-Kyoo;Bang, Jeong-Ho;Park, Chol-Soo
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.31 no.4
    • /
    • pp.315-323
    • /
    • 1998
  • Soil aggregate distribution and its relation to wind erosion were examined for the surface soil of the experimental plots for grasses in the New Incheon International Airport, of which soil was reclaimed with sea sands in the Youngjong Island. The soil aggregate with the size between 0.10 and 0.84mm was 74 percents. The 6 percents of the soil aggregates were non-erodible. With this aggregate distribution the wind erodiblity of the soil, I. was $380Mg\;ha^{-1}\;yr^{-1}$ with I value and climatic factor calculated for the dry period from November to May, $45.2Mg\;ha^{-1}\;yr^{-1}$ of the surface soil were estimated to be eroded. The erodible particles with 0.37mm diameter could fly to 17.8, 29.9 and 49.8 meters by saltation at wind speed of 7, 9 and $15m\;s^{-1}$, respectively. The wind erosion could be reduced by increasing vegetation coverage and applying hydrophyllic soil conditioner.

  • PDF