최근 우리나라 건설산업에서 BTL과 CM이 대두되고 있다. 특히 CM을 적용한 BTL은 BTL과 CM의 조합이라는 점에서 많은 관심을 가지기에 충분하다. OO문화복지종합타운 건립공사는 국내 첫 문화복지시설의 BTL사업이면서 CM을 도입한 사업이다. 현재 BTL사업의 CM은 초기 단계이기에 주무관청의 BTL에 대한 이해 부족으로 인한 행정적 오류, 지원부서와의 의사소통 미흡 등의 실제 사업진행 중 일어날 수 있는 문제점 및 협상, 공정관리, 원가관리 등 CM의 적용효과에 대해 소개함으로써 차후 발주될 BTL사업의 CM이 더 나은 방향으로 나아갈 수 있게 되길 바란다.
Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.
A mathematical model for long-rage water supply planning was formulated as a dynamic plant location problem with network arc capacity expansion, and illustative example was presented. The proposed solution procedure identifies economical construction timings of surface water supply facilities and water conveyence systems and the best water supply operating patterns as well. In this study, we present a heuristic solution procedure using Simulated annealing Method in conjunction with Bertsekas & Tseng's RELAXT-II for the 0-1 integer network problem.
건설 관련 기술 및 시장은 최근 시간과 장소를 떠나 글로벌 시장이라는 하나의 울타리 내에서 이루어지고 있다. 또한, 대기업 중심이었던 해외건설시장에서 중소기업의 비중이 확대되고 있는 시점에서 이들 건설기업의 이윤확대를 위해서는 더욱 효율적이고 생산적인 사업구조 전략이 절실히 요구된다. 이러한 기업의 전략을 위해 건설기업들은 일반적으로 타 기업과의 비교분석을 통해 부족한 점을 인식하고 발전시키기 위한 벤치마킹을 실시하고 있다. 이에 본 논문은 세계 건설업체의 다양한 사업구조전략 및 변화모습을 분석하여 선진 건설업체를 선정하는 한편 이들 기업의 전략 특성을 살펴보고자 한다. 또, 벤치마킹을 위한 선진기업의 선정 방법을 소개하는 또다른 목적을 가질 수 있겠다. 선진 건설업체를 선정하기 위해 시장점유율(매출)변화 분석, 건설 상품별 전문성 분석, 그리고 사업 포트폴리오전략 분석을 방법론으로 이용하였으며 자료는 ENR지에서 발표되는 세계 건설기업의 매출과 상품별 비중을 참고하였다.
전설프로젝트 데이터의 통한적 운용은 건설 프로젝트의 효율적인 관il엔 있어 필수적이다. 최근 데이터 호환성(interoperability)에 기초한 통합방법론으로서 IFC(Industry Foundation Classes)가 제안되었고, IFC에 기초한 시스템 통합의 예가 나타나고 있다. 데이터 호환성(interoperability)의 개념은 각 시스템의 독립성을 보존하면서 시스템의 통합을 전개할 수 있도록, 건설객체를 시스템간의 데이터 공유 프로토콜로써 제시한다. 본 연구에서는 이 데이터 호환성의 기본 개념에 입각하되, 실제 프로세스의 업무범위와 절차를 고려한 단계적인 시스템 개발전략을 제시한다. 이는 실제 업무를 지원하는 정보시스템의 관점보다는 IFC에 의한 시스템 통합에 더 큰 비중을 두고 개발하는 경향에 대한 문제제기이며 그 극복방안이다. 즉, IFC 모델의 데이터 호환성 개념을 응용하여 실제 업무범위와 절차에 적합하게 배치되고 활용되어야 함에도 탁구하고, IFC의 형태에 치중한 결과 실제의 업무를 지원하지 못하는 시스템개발 경향을 극복하고자 한다.
Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.
최근 새로이 대두되고 있는 신 경영혁신 전략인 6시그마 경영은 이미 제조업이나 서비스업 등에서 큰 성과를 보이고 있으며 세계적으로 경영혁신 전략의 표본으로 널리 확산되고 있다. 하지만, 건설산업의 경우 이러한 경영기법을 적용한 사례가 많지 않으며 이미 적용되었던 경영기법조차 그 성과가 미미한 실정이다. 이에 본 연구에서는 6시그마에 대한 이론적인 고찰과 아울러 그 적용요건을 살펴보고 신 품질관리기법으로 건설산업에 접목되었을 때의 문제점을 파악하여 구체적이며 실제적인 6시그마 적용절차 및 방법론을 제시하고자 한다. 본 연구 결과는 건설산업의 6시그마 경영의 도입에 기초적인 연구로서 활용될 것이다.
The 1th International Conference on Construction Engineering and Project Management
/
pp.1231-1236
/
2005
Global construction projects manifest more risks than do other industries. Often, firms doing business in construction markets find these risks intimidating. To secure corresponding profits, many global contractors attempt to forecast the effects of risks and establish risk management strategies. However, one key problem with present-day risk management methods is that they are basically analytical or mathematical-oriented approaches which are not easy to adopt in real business. Based on preliminary investigations and evaluations of current tools, this research elicits more practical algorithms for risk checklist by constructing risk scenarios over the whole period of project execution. For the application of the algorithms, a "SE/RF" (Source-Event/Regular-Floating) checklist is suggested, which sorts out risk sources and their subsequent events, as well as dividing various risk factors into either regular or floating categories. In addition, the "PIS" (Probability-Impact-Significance) method is introduced, in place of traditional "PI" (Probability-Impact) methods, by adding the additional criterion of "risk significance" to determine the degree of risk exposure in a more realistic way. As a result, we draw the significant finding that the "PIS" method presents a closer evaluation regarding degree of risk exposure as compared to the level of expert judgments than those from traditional methods. Finally, we provide an integrated procedure for international project risk management with all of the research achievements being incorporated.
Under the necessity certification of railway supplies, an applicant should check the procedure of urban railway law and the new railway safety law. Currently, the Korean railway standards (KRS), formerly managed by Korea Railroad, have been managed by the Korean Ministry of Construction and Transportation. According to Korean railway safety law and its ordinances, which were committed to Korea Railroad Research Institute. It were established for the guarantee of railway safety, the management of KRS including enactment and revision of technical standards for railway vehicle and components. In this investigation, the detailed management procedure will be introduced for the effective management of Certification of Railway Supplies.
In this paper I discuss a method of constructing the confidence region for the logistic response surface model. The construction involves a, pp.ication of a general fitting procedure because the log odds is linear in its parameters. Estimation of parameters of the logistic response surface model can be accomplished by maximum likelihood, although this requires iterative computational method. Using the asymptotic results, asymptotic covariance of the estimators can be obtained. This can be used in the construction of confidence regions for the parameters and for the logistic response surface model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.