• Title/Summary/Keyword: Construction field data

Search Result 1,431, Processing Time 0.029 seconds

Specificity of Prefounded Column for Top-Down Construction (Top-Down 공사용 선기초기둥의 특성)

  • Kang, Seung-Ryong;Rhim, Hong-Chul;Kim, Seung-Weon;Park, Dae Young;Kim, Dong-Gun;Song, Jee-Yun;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

A Study on Instrumentation Results Analysis Using Artificial Neural Network in Tunnel Area (인공신경망을 이용한 터널시공 시 계측결과 분석에 관한 연구)

  • Lee, Jong-Hwi;Han, Dong-Geun;Byun, Yo-Seph;Chun, Byung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09b
    • /
    • pp.21-31
    • /
    • 2010
  • Although it is important to reflect the accurate information of the ground condition in the tunnel design, the analysis and design are conducted by limited information because it is very difficult to get it practically on considering various geography and geotechnical condition. So construction management of information concept is required to manage immediately on the field condition because it is very time-consuming to establish the countermeasure of underground reinforcement and the pattern change of Bo. Therefore, when construction is on tunnel area, examination of accurate safety and prediction of behavior is performed to overcomes the limit of predicting behavior by using Artificial Neural Network(ANN) in this study. Firstly, the field data was secured. Secondly, suitable structure was made on multi-layer perceptrons among the ANN. Thirdly, learning algorithm-propagated applies to ANN. The data for the learn of field application using ANN was used by considering impact factors, which influenced the behavior of tunnel, and performing credibility analysis. crown displacement, spring displacement, subsurfacement, and rock bolt axial force are predicted at the tunnel construction and on-site application was confirmed by using ANN from analyzing and comparing with measurement value of on-site. In this study, the data from Seoul Highway $\bigcirc\bigcirc$ tunnel section was applied to the ANN Theory, and the analysis on the investigate value and the reasoning for the value associated with field application was performed.

  • PDF

Prediction Survey on Construction Guarantee Market Due to the Restructuring of the Construction Industry's Production System (건설산업 생산체계 개편에 따른 건설보증시장 변화 예측 조사)

  • Kim, Sungil;Chang, Chulki;Yoo, Hyunji
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.63-71
    • /
    • 2021
  • The construction guarantee market is a rear market affected by changes in the construction industry and market. As the restructuring of the construction industry's production system is being carried out, such as the abolition of regulations on business field between general and specialty contractors, major changes are expected not only in the construction market but also in the construction guarantee market. In construction guarantee market, there are currently three Contractor Financial Cooperatives, which are divided based on business field and business type(General, Specialty and Plant & Mechanical). The abolition of business field regulation will have various effects on construction guarantee market, such as forming a competitive structure among the three Contractor Financial Cooperatives. Therefore the role of the construction guarantee institutions are also required to change. This study predicted the changes in the construction guarantee market after the restructuring of construction industry and analyzed the ripple effect on the market. This study reviewed the details of the reorganization plan on the construction industry, policies and statistical data related to construction guarantee, and lastly conducted the survey on each member of the three Contractor Financial Cooperatives to analyze the usage behavior in the future guarantee market. Based on the result of this study, the members of both the General Contractor Financial Cooperative and Specialty Contractor Financial Cooperative are not willing to change the existing institutions, but a lot of them are expected to use other institutions in duplicate. The members of the Plant & Mechanical Contractor Financial Cooperative are most willing to use other guarantee institutions.

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

Development of PDA and Web-based System for Quality Inspection and Defect Management of Apartment Housing Project (PDA 및 웹 기반의 공동주택 품질점검 밀 하자관리 시스템의 개발)

  • Oh Se-Wook;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.140-150
    • /
    • 2005
  • Recently, quality inspection and defect management have been considered as one of the major issues for increasing customer satisfaction and corporate image in domestic construction industry. However, the quality inspection and defect management have not been performed systematically because of insufficient field managers, the excessive amount of documents, complicated work process and difficulty in communicating construction information. Therefore, the field manager could not perform the quality inspection and defect management work in time as well as the reliability of recorded quality and defect data was decreased. The primary objective of this study is to propose a quality inspection and defect management system using information technology which enables field managers to efficiently gather the information of defection in apartment housing. It is anticipated that the effective use of the proposed system would be able to imp개ve communication among the related participants and systematically accumulate data that might be used in similar construction projects.

The development of a field measurement instrumentation system for low-rise construction

  • Porterfield, Michelle L.;Jones, Nicholas P.
    • Wind and Structures
    • /
    • v.4 no.3
    • /
    • pp.247-260
    • /
    • 2001
  • In the last three decades several comprehensive field measurement programs have produced significant insight into the wind effects on low-rise structures. The most notable and well published of these efforts are measurements being collected at the Wind Engineering Field Laboratory (WERFL) at Texas Tech University, measurements on low-rise structures in Silsoe, England and measurements on groups of low-rise structures collected in Aylesbury, England. Complementary to these efforts, an additional full-scale field investigation program has recently collected meteorological, pressure, strain and displacement data on a low-rise structure in Southern Shores, North Carolina. To date over seventy-five hundred data sets have been collected at the Southern Shores site in a variety meteorological conditions up to and including hurricane-force winds. This paper provides details of the system, its development, and preliminary assessment of its performance. A description of the field site, the instrumented structure, and the instrumentation system is provided. In addition, an example of the data collected during three hurricanes is presented. The primary goal of this paper is to provide the reader with the necessary technical details to appropriately interpret data from this experiment, which will be presented in future publications currently under development.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.

Case Study Research in Earthwork Site Digitization for Smart Construction (스마트 건설을 위한 토공현장 디지털화 적용성 검증)

  • Park, Jae-woo;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.529-536
    • /
    • 2019
  • Recently, various efforts have been tried in the construction industry to improve productivity by applying the fourth industrial revolution technology. Among the various technologies, researches for the automation and digitization of earthworks are being carried out steadily. As the interest in the benefits of digitalization of the earthwork field has increased, there have been more cases of technology development and application for digitalization of the earthwork field. However, there is not enough case study to present the analysis results of application cases. The purpose of this study is to verify the feasibility of applying the digitization technology of the earthwork in actual worksite. In order to digitize the worksite terrain, it is required the process of field measurement, measurement data registration, earthwork information input, and analysis cell generation. Particularly, it is possible to achieve information-enabled digitization rather than digitalizing only the shape through the input of the earthwork information and the analysis cell generation. By using the digital information of the earthwork field, it is possible to visually recognize the change of the earthwork field, so that it is expected to enhance the worker 's understanding and to be highly applicable to the management work. It is expected that the digital technology of earthwork site will be able to know the precise amount of volume change of the earthwork numerically, and it will be highly applicable to construction management.

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF