• 제목/요약/키워드: Construction drawing information

검색결과 198건 처리시간 0.025초

일방향 지오데식을 활용한 곡면 형상의 패널링 - 복합 곡면을 중심으로 - (Paneling of Curved NURBS Surface through Marching Geodesic - Application on Compound Surface -)

  • 홍지학;성우제
    • 한국BIM학회 논문집
    • /
    • 제11권4호
    • /
    • pp.42-52
    • /
    • 2021
  • Paneling building facades is one of the essential procedures in building construction. Traditionally, it has been an easy task of simply projecting paneling patterns drawn in drawing boards onto 3d building facades. However, as many organic or curved building shapes are designed and constructed in modern architectural practices, the traditional one-to-one projection is becoming obsolete for the building types of the kind. That is primarily because of the geometrical discrepancies between 2d drawing boards and 3d curved building surfaces. In addition, curved compound surfaces are often utilized to accommodate the complicated spatial programs, building codes, and zoning regulations or to achieve harmonious geometrical relationships with neighboring buildings in highly developed urban contexts. The use of the compound surface apparently makes the traditional paneling pattern projection more challenging. Various mapping technics have been introduced to deal with the inabilities of the projection methods for curved facades. The mapping methods translate geometries on a 2d surface into a 3d building façade at the same topological locations rather than relying on Euclidean or Affine projection. However, due to the intrinsic differences of the planar 2d and curved 3d surfaces, the mapping often comes with noticeable distortions of the paneling patterns. Thus, this paper proposes a practical method of drawing paneling patterns directly on a curved compound surface utilizing Geodesic, which is faithful to any curved surface, to minimize unnecessary distortions.

이력 데이터를 사용한 노무생산성 모델링 및 측정 (Measuring and Modeling Labor Productivity using Historical Data)

  • 박영준;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.141-142
    • /
    • 2012
  • Estimating the productivity of labor has relied on the experience and intuition of an estimator, or productivity data, such as standard in practical estimation. However, when new technologies and new construction methods employed in the construction industry, Dependence of a quantity surveyor's intuition is increased. This is because of the lack of a systematic methodology which models, estimates, and measures the labor productivity, Due to the historical productivity data is unavailable. Even thought project history data contains information that is important to predict the performance of a project, It can not provide valuable information to model, estimate, and measure the labor productivity. This is because 1) the absence of the productivity measurement system with consistency, 2) the difficulty of reusability of historical data collected. Therefor, this study suggests a methodology which build a productivity model by measuring the productivity of labor and collecting the historical data systematically. In addition, this methology is applied to develop a productivity model of shop-drawing and manufacturing process using descrete event simulation.

  • PDF

골재노출 P.C제품의 현지생산에 관한 소고 -보트라콘 프로젝트의 코아빌딩을 중심으로- (A study on exposed aggrigate P.C. in field plant cast - case study for core building, VOTRAKON project -)

  • 이학영
    • 기술사
    • /
    • 제19권2호
    • /
    • pp.34-42
    • /
    • 1986
  • These brief studies and reports of the use of exposed aggrigate precast concrete in practice are combined with a description of some notable co-ordination such as shop drawing, manufacturing and erection in the field construction. Above mentioned exposed aggrigate P. C. means architectural P. C. which was used to the VOTRAKON site in Riyadh, Saudi Arabia. Fabricated P. C. on the site without autoclaving and steam curing plant had been successfully carried out on this project-core building, conference room and others. The project designed by HOPE/VTN international INC. which is located in San Diego, California U.S.A. stands for vocational training and related support facilities contract. We had to submit shop drawings showing complete information for fabrication and installation of P. C. unit reinforcement. Also we should be indicated member dimension and cross section, location size and type of necessary for erection. We can delineate the following characteristic results. One of the most important things how to handle exposed aggrigate P.C. unit as specified was quality assurance and co-ordination for shop drawing, manufacturing and erection.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

경제성 환경성 통합평가를 위한 정보통합시스템 (Integrated Information System for Environmental and Economic Evaluation)

  • 김창학;신민호;강인석
    • 대한토목학회논문집
    • /
    • 제30권6D호
    • /
    • pp.615-622
    • /
    • 2010
  • 최근 국내외적으로 친환경건설을 위해 환경성 및 경제성을 고려하여 통합평가하는 것은 일반화되어 가고 있다. 본 연구의 목적은 VE/LCC와 LCA를 통합분석하기 위한 시스템을 제시하는 것이다. 의사결정자가 환경성 및 경제성을 통합평가하고 이것을 의사결정에 반영하기 위해서는 현실적으로 매우 많은 비용자료, 설계도서 및 문서들을 적절히 관리하고 통합할 수 있어야 한다. 본 연구에서는 이러한 정보의 통합수단으로 WBS를 기본으로 한 관리수단을 제시하고, DB와 효율적으로 연계하여 의사결정을 할 수 있도록 하였다. 또한 본 시스템은 VE분석, LCC분석, LCA분석을 위한 모듈을 별개로 제시하여 사용자의 편의성을 좋게 하였다.

작업환경측정 결과 데이터베이스를 활용한 직무노출매트릭스 구축을 위한 공정 표준화 (Process Standardization for the Construction of Job-Exposure Matrix Using the Work Environment Measurement Database)

  • 최상준;박주현;고동희;박동욱;김환철;임대성;성예지;고경윤;임지선;서회경
    • 한국산업보건학회지
    • /
    • 제33권1호
    • /
    • pp.78-90
    • /
    • 2023
  • Objectives: The purpose of this study is to standardize the process code of the work environment measurement database (WEMD) for the construction of a job-exposure matrix (JEM). Methods: The standard process code (SPC) was reclassified based on process similarity and drawing upon the code used in the existing K2B. It was supplemented through review by industrial hygiene experts. In addition, an index word database related to SPC was created and used for SPC search. A pilot evaluation project was conducted by experts to evaluate the validity of the newly reclassified standard process code. Results: A total of 70 final SPCs were developed, including 31 processes related to the construction industry. Using the Shiny program, we developed a standard code finder that can be used on the web (https://kscf.shinyapps.io/scf_app/). As a result of the pilot evaluation, it was determined that it was easier to search for standard codes than previous codes, so it was highly utilized. Conclusions: It is expected that JEM construction using industry-process information drawing on WEMD data will be possible using the 70 newly standardized process codes.

거푸집 부재 인식을 위한 인공지능 이미지 분할 (Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements)

  • 아이샤 무니라 초드리;문성우
    • 한국BIM학회 논문집
    • /
    • 제12권1호
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.

설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발 (Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information)

  • 박현용;이승현;강태경;이유섭
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.63-70
    • /
    • 2008
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results with work zone information.

조선 선체 생산설계 일정 계획을 위한 상세 이산사건 모델링기반 비즈니스 프로세스 시뮬레이션 (High-level Discrete-event Modeling-based Business Process Simulation for the Scheduling of the Ship Hull Production Design)

  • 손명조;김태완
    • 한국CDE학회논문집
    • /
    • 제18권3호
    • /
    • pp.224-233
    • /
    • 2013
  • For the scheduling and the job assignment of the ship hull production design which is a process-based work, we suggest the simulation-based scheduling using the discrete-event-based business process simulation. First, we analyze the ship hull production design process from the perspective of a job assignment to make it into the simulation model using DEVS (Discrete Event System Specification) which is the representative modeling method for a discrete-event simulation. Based on the APIs of the open-source discrete-event simulation engine, we implement the simulation using the Groovy script. We develop the scenario generator in which the user defines detail information of the construction drawing and its member blocks, and design engineers information, and the various setting for the simulation including the job assignment strategy. We use the XML files from this scenario generator as inputs of simulation so that we can get simulation result in forms of Gantt chart without changes of the simulation model.

건설자재 표준화 및 정보활용에 대한 수요자 의식 조사 연구 (A Study on the Investigation of Demander's Consciousness for Standardization and Information of Construction Materials)

  • 최영준;조영근;권기준;채성태
    • 한국방재학회 논문집
    • /
    • 제7권2호통권25호
    • /
    • pp.7-12
    • /
    • 2007
  • 본 연구는 우리나라의 건설자재 품질 및 정보 표준화에 대한 건설수요자들의 의식을 조사하여, 건설자재 표준화의 개선안을 제시하기 위한 것이다. 조사결과, 응답자들은 KS규격의 질적 수준을 67점(100점 만점대비)으로 평가하고 있었다. 또한, 응답자의 38%는 표준정보의 부재로 인한 애로사항을 겪은 경험이 있었다고 응답하였으며, 대표적인 비표준화 자재로는 혼화재료, 방수재, 보강섬유, 콘크리트, 골재, 접착제, 목재, 가설재, 단열재 등을 응답하였다. 정보표준화에 대한 의식조사결과, 응답자들의 71.2%는 건설자재 정보화가 필요하다고 응답하였으며, 구체적인 요구항목으로는 품질, 규격, 가격, 시공, 도면, 법령 정보의 순으로 제시하였다.