• Title/Summary/Keyword: Construction drawing information

Search Result 198, Processing Time 0.021 seconds

A Study on the Reduction Plan About Prefabricated Wall Construction Error Rates for BIM-based Modular Construction (BIM기반 모듈러 건축의 조립식 벽체 시공 오차율 저감방안에 대한 연구)

  • Suh, Bong-Gyo;Bae, Seong-Jae;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.213-214
    • /
    • 2013
  • Recently, modular construction has been begun to introduce actively for improvment of productivity in the construction industry. By the way, the construction technology is being IT through BIM. This is why modular construction needs BIM technology. In this study, we analyze the problems in the current modular construction at factory production stage. The way to extract 3D shop drawings using BIM is suggested to solve this problem.

  • PDF

Roadway Preliminary Cost Estimation Prototype based on BIM and GIS (BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구)

  • Park, Wonyoung;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.14-21
    • /
    • 2013
  • While a detailed cost estimation utilizes the comprehensive quantity information obtained from a complete drawing and specification, an approximate cost estimation heavily relies on the subjective decisions. This phenomenon is because the approximate estimation is usually conducted in early stage of the construction phase where the drawing and specification are not available. This study developed a roadway construction cost estimation system which enables users to estimate the approximated cost of the project in early stage. The system identifies the variation of the construction costs due to the road route change using a cased based reasoning(CBR) method. Overall the system is expected to improves the accuracy and effectiveness of the estimation process, because it would provide users with increased accessability and consistent results in early stage of the project which leaded to the increased work transparency.

A Research on Effective Use of Three-Dimensional Models for Architectural Planning and Design (3차원 모델을 통한 설계정보의 효과적 활용방안에 관한 연구)

  • 정례화
    • Korean Institute of Interior Design Journal
    • /
    • no.29
    • /
    • pp.273-280
    • /
    • 2001
  • In architecture, each project participant must maintain organic relationship with others. However, current practices are rather procedural and discrete than organic, which result in considerable inefficiencies. The cool-downs of Korean construction market also force the architects to be familiar with the new construction methods and systems. This research mainly focuses on the pre-development stage of such systems, analysing relationships between the information of architectural design and other parts of construction information like structure, construction, environment, and so forth. The result of analysis can be organized into attributes of members in a physical building, which can be modeled in a 3D system. The resulting model can be used for automated generation of drawing, Bill of Materials, finite element meshes for structural analysis and energy analysis, etc. by extracting meaningful information from it. Hence, the purpose of this research is to analysis the relationship among domain-specific information (e.g. structural engineering, construction detail, energy evaluation) that are represented in drawings, and to represent the attributes of the information relevantly so that they can be applied to each unit task that forms the whole project. Therefore, an object oriented methodology is introduced to compose design informations in three dimension, and expressing properties of building factors and materials, and to construct a database for computers to recognize architecture informations.

  • PDF

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase (실시설계단계 BIM과 도면의 정합성 검토를 위한 체크리스트 개발)

  • Kim, Byeong-Ju;Kim, Yi-Je;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.

The Design of the Drawing Management on Smart Operating Environments (스마트 운영 환경에서의 도면 관리기의 설계)

  • Kim, Dong-Hyun;Park, Min-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2011.05a
    • /
    • pp.223-226
    • /
    • 2011
  • To design a drawing at construction sites or ship yards, generally, they exploit CAD program, such as AutoCAD. They also carry the printed drawings in the fields in order to refer the designs. However, the printed designs are easy to be damaged. In this paper, we propose the design of a management system for the CAD drawings on top of the smart operating systems of a smart device. The proposed system exploits the index file based on the Fixed GRID file in order to improve the display speed of the drawings.

  • PDF

A Study on the development of Collaborative Design system for exchanged Architectural Detail Data using internet environment (인터넷 환경에서 상세 설계정보 교환을 위한 공동설계 시스템 개발에 관한 연구)

  • 조성오
    • Korean Institute of Interior Design Journal
    • /
    • no.22
    • /
    • pp.132-138
    • /
    • 2000
  • Internet services are utilizing a variety of server/client technologies. In particular internet technologies provide improved accessibility to information for facility management customers and users for the systems. This study is the architectural data exchange system development more effective management and accept using on Internet web environment. This paper is the explore the use of computers in architectural planning that how the information may be extracted drawing entered into database and exchanged architectural detail data interfaces. System support communication and interactive collaboration among designers through complex Building object during the Design. There are four part in collaborative design system. User Management system, Standard Database System, Project Database System and Interface system. All Data are recognizable format include drawing file and contents. Web/DB server supported communication and collaboration among partners in the building design and construction process. Collaborative Design system is provide new conceptual framework that exist in the Web.

  • PDF

Integrated CAD System for Ship and Offshore Projects

  • Suh, Heung-Won;Lee, Sung-Geun
    • International Journal of CAD/CAM
    • /
    • v.6 no.1
    • /
    • pp.41-48
    • /
    • 2006
  • Nowadays major shipbuilding companies are trying to expand their business not only to shipbuilding but to offshore projects as well. DSME is one of them. DSME is trying to set up a flexible design and construction environment for shipbuilding and offshore construction in a single shipyard. The shipbuilding and offshore projects, however, have their unique technology but they need to be designed and constructed in one site. To support this new requirement, DSME has developed an integrated CAD system for ship and offshore projects. In this integrated design environment, the designers can design commercial ships and offshore projects in a flexible manner. Concurrent design is very important for ship and offshore design. As compared to the complexity of the product, the design period is quite short. In effect, the design system for the ship and offshore project has to support concurrent design. One essential point of concurrent design environment is a product model based design system. DSME has developed and implemented the 3D product model concurrent design environment based on Tribon M3. Tribon is a widely used CAD system in shipbuilding area that is developed by Tribon Solutions. DSME has both customized the Tribon system and developed in-house application systems to support its own design and production procedures. All the design objects are modeled in one common database to support concurrent design and accurate production. The major in-house development focused on the modeling automation and automatic drawing generation. During the drawing generation process many of the additional production information are also extracted from the 3D product model. In addition, several applications and functionalities have been developed to apply the shipbuilding based Tribon M3 system to offshore projects. The development of shape nesting, tubular connection, isometric drawing, grating nesting systems are the typical.

Development of DB Construction and CAM System for Remove of Rapid Feed at Milling (밀링가공에서 급속이송 제거를 위한 DB구축 및 CAM 시스템 개발)

  • 손영지
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1998.03a
    • /
    • pp.106-111
    • /
    • 1998
  • NC code has to be made after changing the drawing information to DXF file, the converting file. Arranging the information ordered irregularly when DXF file is made decrease the unnecessary time of rapid feed during working and the DATA capacity when the information is changed. This CAM program can be used easely for the beginner of the minor enterprises. The connection of operations and the use of GUI increase business efficiency.

  • PDF

Development of Building Monitoring Techniques Using Augmented Reality (증강현실을 이용한 건물 모니터링 기법 개발)

  • Jeong, Seong-Su;Heo, Joon;Woo, Sun-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.3-12
    • /
    • 2009
  • In order to effectively distribute the resources, it is very critical to understand the status or progress of construction site quickly and accurately. Augmented Reality (AR) can provide this situation with information which is convenient and intuitive. Conventional implementation of AR in outdoor or construction site condition requires additional sensors or markers to track the position and direction of camera. This research is aimed to develop the technologies which can be utilized in gathering the information of constructing or constructed buildings and structures. The AR technique that does not require additional devices except for the camera was implemented to simplify the system and improve utility in inaccessible area. In order to do so, the position of camera's perspective center and direction of camera was estimated using exterior orientation techniques. And 3D drawing model of building was projected and overlapped using this information. The result shows that by using this technique, the virtual drawing image was registered on real image with few pixels of error. The technique and procedure introduced in this paper simplifies the hardware organization of AR system that makes it easier for the AR technology to be utilized with ease in construction site. Moreover, this technique will help the AR to be utilized even in inaccessible areas. In addition to this, it is expected that combining this technique and 4D CAD technology can provide the project manager with more intuitive and comprehensive information that simplifies the monitoring work of construction progress and planning.