• Title/Summary/Keyword: Construction drawing information

Search Result 198, Processing Time 0.026 seconds

The Improvement Plan of Design Process by Case Study of Steel Structural Work (현장조사를 통한 철골공사 설계프로세스 개선방안)

  • Bang, Sung-Won;Kim, Jin-Ho;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

Evaluation of Horizontal Position Accuracy in Forest Road Completion Drawing (임도 준공도면의 수평위치 정확도 평가에 관한 연구)

  • Kim, Myeong-Jun;Kweon, Hyeong-Keun;Choi, Yeon-Ho;Yeom, In-Hwan;Lee, Joon-Woo
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.471-479
    • /
    • 2010
  • Forest roads of 16,424km have been constructed as infrastructure for efficient management of forest. The demand of forest road have been also increased steadily with SOC conception for forest management and wood production. But, accuracy verification by completion drawing of forest road needed aspects extration of geographic information to sound like forest road construction and completion drawing. However, verification for completion drawing has not ascertained. This study carried out the evaluation for position accuracy about constructed forest road in Chungcheongnam-do for evaluating horizontal position accuracy of completion drawing of forest road. In result, first of distance of completion drawing and real route designed completion drawing longer than the real route as Gongju 83m, Seosan 66m, Nonsan 27m and Dangjin 19m, respectively. Second, RMSE by point-correspondence was 11m~14.7m, buffering analysis appeared difference of 18~24m. Finally, index of shape was the similar completion and real route through 6.5~7.4 and data information of forest road corresponds to be perfect. For such reasons, the existing completion drawings have a problem that it cannot use graphic information for drawing digital map according to the regulation, and there is an urgent need for improvement to solve this problem in the process of design and construction.

Development of Drawing Processing Tool Program and Establishment Strategy of 3D Underground Structures based on Standardized Drawings (표준도 기반의 3차원 지하구조물 구축 방안 및 도면가공 툴 프로그램 개발)

  • LEE, Min-Kyu;HAN, Sang-Hoon;KIM, Sung-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.1-25
    • /
    • 2021
  • In order to respond and prevent underground safety accidents, the Korean government has been preparing a submitting completion drawing web system project for converting the current manual-based 3D Underground Geospatial Map construction and its update system to an automation-based 3D underground information construction. However, research on standard drawings required for the automatic update of 3D underground structures is insufficient, so detailed research is needed. In this research paper, a standard map-based 3D underground structure construction plan was presented for the six types of underground structures constituting the 3D Underground Geospatial Map, enabling rapid and accurate drawing data creation and systematically 3D underground structure drawing data could be managed. In addition, we developed a 3D construction drawing tool that can be used in underground information practice so that ordinary CAD program users can easily produce processing drawings. The results derived from this paper are expected to be major reference materials for the establishment of standard frameworks and practical application guidelines for the construction of 3D underground structures in the future.

Construction of Road Alignment Information Using LiDAR Data (LiDAR 자료를 이용한 도로의 선형정보 구축)

  • Lee, Jong-Chool;Kim, Hee-Gyoo;Seo, Yoong-Cheol;Roh, Tae-Ho
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.471-474
    • /
    • 2007
  • On the road, geometric structure such as horizontal alignment, vortical alignment and crossing inclination ate important to explain characteristics of road and safety analysis. Especially, horizontal and vortical alignment are have to do with safety of covering. In existing road, for the safety analysis or alignment improvement and expansion pavement, it needs alignment factor of road. Alignment factor of road can be acquired by design drawing. But, design drawing can be not exist because of rack of facility management and national policy that centered to construction. And also, existing design drawing have a lot of differences in comparison with another existing design drawing cause of alignment improvement. In this case, for the precise analysis of alignment, 3-dimensional location information on the road centerline and acquisition of location information which related geometric structure are must to be preceded. In this study, therefore, it provide alignment factors which needed to alignment improvement and road safety analysis by acquisition of road space information and extraction of road centerline data using LiDAR data.

  • PDF

Drawing Segmentation Module for Management of Building Finish Details (마감상세도 관리를 위한 도면 블록화 모듈 개발)

  • Koo, Kyo-Jin;Park, Hyung-Jin;Joung, Jin-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.329-337
    • /
    • 2015
  • Drawings in construction industry are an aggregation of knowledge containing various information generated in a number of projects. Finish details are generated by architects when they select details and methods of construction by spaces or elements. However it is so difficult to re-use details in existing drawing management systems because there are so many details in a sheet and there are several many kinds of sheets in a file. In this paper, a drawing segmentation algorithm is suggested for managing building finish details individually. Based on this algorithm, a system module for making detail blocks from files of finish details is developed. Using the drawing segmentation module, interfaces of drawing management system are suggested in the paper. Management of individual detail blocks helps to reduce of the time for searching and increases productivity of designed drawings. Also it would contribute to increase quality of designed drawings by reusing of knowledge in detail blocks.

Construction of Construction Drawing Data Repository using Ontology (온톨로지를 이용한 건축 도면데이터 레포지터리 구성)

  • Lee, Hui-Jae;Yoo, Sang-Bong;Kim, In-Han
    • The Journal of Society for e-Business Studies
    • /
    • v.9 no.3
    • /
    • pp.79-94
    • /
    • 2004
  • W3C has developed the RDF standard for utilizing ontology in Web applications. This paper presents extracting, storing, and applying ontology on product data. The management and document information included in DWG files is focused as an example. By analyzing the relationship among the drawing data, the RDF schema is designed frist. Based on the schema ontology is extracted and stored in XML files. As an application of the stored ontology, we the schema ontology is extracted and stored in XML files. As an application of the stored ontology, we can reconfigure the sitemap of drawing data repositories. In this example, the users can select the view that he or she is interested in (e.g., designer, document, project). With such various views of an drawing data repository, the users can access the specific data more effectively.

  • PDF

Establishment Strategy of 3D Spatial Information from 2D Facility Drawing Related to Fire Fighting (2차원 소방대상 시설물도면의 3차원 공간정보 구축방안)

  • Lee, Yun;Kim, In-Hyun;Choi, Yun-Soo;Oh, Kyu-Shik
    • Spatial Information Research
    • /
    • v.18 no.5
    • /
    • pp.47-54
    • /
    • 2010
  • Until recently, GIS technology was mainly based on 2D for disaster management. Necessity of 3D spatial information came to the fore with a speedy and accurate response system in disaster management. However, most fire-fighting facilities presently use CAD with 2D formation, Image drawings, and conception of construction data's formation. It is not about the drawings in map production. It's about varieties of construction ways or contents. In this study, we are proposing the ways on analyzing the existing disaster management targets for 2D technology drawings, designing the 3D spatial information data model, and transforming the effective 3D spatial information into algorithm and dimension spatial information construction for easily building on mass 2D architectural drawings to 3D spatial information effectively in disaster management. We can maxim ize efficient construction time and expenses. Then what is proposed in this study about constructing 3D spatial information for manual work, and it's significance for improving decisive decisions and utilizing the tasks to prevent, prepare, respond and restore steps in disaster management.

Application of BIM on Drawing Verification of Firefighting

  • Chang, Ya-Chun;Shr, Jin-Fang;Huang, Xuan-Chao
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.2
    • /
    • pp.15-18
    • /
    • 2015
  • In general, most of the function and using of building is for single purpose. However, current buildings combine several functions that causes a lot of problems not on firefighting only but also on environment engineering. Because of hard integration on different fields that causes a lot of conflict. That wastes cost and time. That also threaten the safety of firefighting. This search focuses on the drawing verification and field inspection on firefighting. These two items both remain paper work. To complete the current work, it needs to bring a great amount of drawing papers in the field. By BIM, integrated data can be extracted. It makes the drawing verification and field inspection easier and increases the efficiency. That is the main point of this research.

Checklists for Construction Drawings of Office Buildings based on Working Drawing Analysis (공사용도면 현황분석에 기반한 일반업무시설 실시설계도면 체크리스트 개선방안)

  • Lee, Beom-Koo;Jung, Tae-Hwan;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.3-11
    • /
    • 2010
  • Currently the quality of construction drawings is deteriorated due to restrictions on time costs allowed to the design phase. Moreover shop drawings are arbitrarily produced without the standard criteria, and cleared off after the completion of construction. As a result, the information of produced shop drawings is not feedback to the design phase, and the quality of the construction drawings become worse. This study proposes checklists that include information requested at construction sites and the shop drawings as well as the existing checklists for the construction drawings. The checklists integrate designer's check-items according to breakdown of drawings and contractor's check-items base don construction process. Index matrices of the integrated checklists is developed for practical application of the checklists, and validated through intensive interview with design and construction practitioners.

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.