Journal of the Korea Institute of Building Construction
/
v.3
no.2
/
pp.111-118
/
2003
Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.
Kim, Myeong-Jun;Kweon, Hyeong-Keun;Choi, Yeon-Ho;Yeom, In-Hwan;Lee, Joon-Woo
Korean Journal of Agricultural Science
/
v.37
no.3
/
pp.471-479
/
2010
Forest roads of 16,424km have been constructed as infrastructure for efficient management of forest. The demand of forest road have been also increased steadily with SOC conception for forest management and wood production. But, accuracy verification by completion drawing of forest road needed aspects extration of geographic information to sound like forest road construction and completion drawing. However, verification for completion drawing has not ascertained. This study carried out the evaluation for position accuracy about constructed forest road in Chungcheongnam-do for evaluating horizontal position accuracy of completion drawing of forest road. In result, first of distance of completion drawing and real route designed completion drawing longer than the real route as Gongju 83m, Seosan 66m, Nonsan 27m and Dangjin 19m, respectively. Second, RMSE by point-correspondence was 11m~14.7m, buffering analysis appeared difference of 18~24m. Finally, index of shape was the similar completion and real route through 6.5~7.4 and data information of forest road corresponds to be perfect. For such reasons, the existing completion drawings have a problem that it cannot use graphic information for drawing digital map according to the regulation, and there is an urgent need for improvement to solve this problem in the process of design and construction.
Journal of the Korean Association of Geographic Information Studies
/
v.24
no.4
/
pp.1-25
/
2021
In order to respond and prevent underground safety accidents, the Korean government has been preparing a submitting completion drawing web system project for converting the current manual-based 3D Underground Geospatial Map construction and its update system to an automation-based 3D underground information construction. However, research on standard drawings required for the automatic update of 3D underground structures is insufficient, so detailed research is needed. In this research paper, a standard map-based 3D underground structure construction plan was presented for the six types of underground structures constituting the 3D Underground Geospatial Map, enabling rapid and accurate drawing data creation and systematically 3D underground structure drawing data could be managed. In addition, we developed a 3D construction drawing tool that can be used in underground information practice so that ordinary CAD program users can easily produce processing drawings. The results derived from this paper are expected to be major reference materials for the establishment of standard frameworks and practical application guidelines for the construction of 3D underground structures in the future.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2007.04a
/
pp.471-474
/
2007
On the road, geometric structure such as horizontal alignment, vortical alignment and crossing inclination ate important to explain characteristics of road and safety analysis. Especially, horizontal and vortical alignment are have to do with safety of covering. In existing road, for the safety analysis or alignment improvement and expansion pavement, it needs alignment factor of road. Alignment factor of road can be acquired by design drawing. But, design drawing can be not exist because of rack of facility management and national policy that centered to construction. And also, existing design drawing have a lot of differences in comparison with another existing design drawing cause of alignment improvement. In this case, for the precise analysis of alignment, 3-dimensional location information on the road centerline and acquisition of location information which related geometric structure are must to be preceded. In this study, therefore, it provide alignment factors which needed to alignment improvement and road safety analysis by acquisition of road space information and extraction of road centerline data using LiDAR data.
Journal of the Korea Institute of Building Construction
/
v.15
no.3
/
pp.329-337
/
2015
Drawings in construction industry are an aggregation of knowledge containing various information generated in a number of projects. Finish details are generated by architects when they select details and methods of construction by spaces or elements. However it is so difficult to re-use details in existing drawing management systems because there are so many details in a sheet and there are several many kinds of sheets in a file. In this paper, a drawing segmentation algorithm is suggested for managing building finish details individually. Based on this algorithm, a system module for making detail blocks from files of finish details is developed. Using the drawing segmentation module, interfaces of drawing management system are suggested in the paper. Management of individual detail blocks helps to reduce of the time for searching and increases productivity of designed drawings. Also it would contribute to increase quality of designed drawings by reusing of knowledge in detail blocks.
W3C has developed the RDF standard for utilizing ontology in Web applications. This paper presents extracting, storing, and applying ontology on product data. The management and document information included in DWG files is focused as an example. By analyzing the relationship among the drawing data, the RDF schema is designed frist. Based on the schema ontology is extracted and stored in XML files. As an application of the stored ontology, we the schema ontology is extracted and stored in XML files. As an application of the stored ontology, we can reconfigure the sitemap of drawing data repositories. In this example, the users can select the view that he or she is interested in (e.g., designer, document, project). With such various views of an drawing data repository, the users can access the specific data more effectively.
Until recently, GIS technology was mainly based on 2D for disaster management. Necessity of 3D spatial information came to the fore with a speedy and accurate response system in disaster management. However, most fire-fighting facilities presently use CAD with 2D formation, Image drawings, and conception of construction data's formation. It is not about the drawings in map production. It's about varieties of construction ways or contents. In this study, we are proposing the ways on analyzing the existing disaster management targets for 2D technology drawings, designing the 3D spatial information data model, and transforming the effective 3D spatial information into algorithm and dimension spatial information construction for easily building on mass 2D architectural drawings to 3D spatial information effectively in disaster management. We can maxim ize efficient construction time and expenses. Then what is proposed in this study about constructing 3D spatial information for manual work, and it's significance for improving decisive decisions and utilizing the tasks to prevent, prepare, respond and restore steps in disaster management.
International Journal of Aerospace System Engineering
/
v.2
no.2
/
pp.15-18
/
2015
In general, most of the function and using of building is for single purpose. However, current buildings combine several functions that causes a lot of problems not on firefighting only but also on environment engineering. Because of hard integration on different fields that causes a lot of conflict. That wastes cost and time. That also threaten the safety of firefighting. This search focuses on the drawing verification and field inspection on firefighting. These two items both remain paper work. To complete the current work, it needs to bring a great amount of drawing papers in the field. By BIM, integrated data can be extracted. It makes the drawing verification and field inspection easier and increases the efficiency. That is the main point of this research.
Korean Journal of Construction Engineering and Management
/
v.11
no.4
/
pp.3-11
/
2010
Currently the quality of construction drawings is deteriorated due to restrictions on time costs allowed to the design phase. Moreover shop drawings are arbitrarily produced without the standard criteria, and cleared off after the completion of construction. As a result, the information of produced shop drawings is not feedback to the design phase, and the quality of the construction drawings become worse. This study proposes checklists that include information requested at construction sites and the shop drawings as well as the existing checklists for the construction drawings. The checklists integrate designer's check-items according to breakdown of drawings and contractor's check-items base don construction process. Index matrices of the integrated checklists is developed for practical application of the checklists, and validated through intensive interview with design and construction practitioners.
Journal of the Korea Institute of Building Construction
/
v.3
no.3
/
pp.113-120
/
2003
The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.