• 제목/요약/키워드: Construction costs

검색결과 1,535건 처리시간 0.033초

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구 (Study of a Online Survey System for Monitering of Construction Cost on Construction Site)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

교통량과 교통하중을 고려한 교량건설비용의 할당 (An Approach for Bridge Construction Cost Allocation Considering Traffic Load and Traffic Capacity)

  • 이동주;황인극
    • 산업공학
    • /
    • 제17권2호
    • /
    • pp.142-148
    • /
    • 2004
  • The objective of bridge construction cost allocation is to distribute in a fair and rational manner the bridge construction costs among those vehicles using the bridge. In most bridge construction cost allocation studies, bridge construction costs are mainly distributed according to traffic load(gross vehicle weight), without any consideration of bridge capacity requirements(the number of lanes). In this paper, a bridge cost allocation method for considering both traffic capacity and traffic loads is developed. The proposed method is based on cooperative game theory, particularly two concepts known as the Aumann-Shapley (A-S) value and Shapley value. This method can help to analyze the impact of traffic capacity costs. By applying the proposed method to an example, traffic capacity cost is found to be high so that traffic capacity should be considered to allocate the bridge construction costs to vehicle classes in a more equitable manner.

LCC 평가를 통한 지붕방수공법선정에 관한 연구 (A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing)

  • 최오영;김태희;김광희
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

A Markov-based prediction model of tunnel geology, construction time, and construction costs

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Ali, Hunar Farid Hama;Salim, Sirwan Ghafoor;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • 제28권4호
    • /
    • pp.421-435
    • /
    • 2022
  • The necessity of estimating the time and cost required for tunnel construction has led to extensive research in this regard. Since geological conditions are significant factors in terms of time and cost of road tunnels, considering these conditions is crucial. Uncertainties about the geological conditions of a tunnel alignment cause difficulties in planning ahead of the required construction time and costs. In this paper, the continuous-space, discrete-state Markov process has been used to predict geological conditions. The Monte-Carlo (MC) simulation (MCS) method is employed to estimate the construction time and costs of a road tunnel project using the input data obtained from six tunneling expert questionnaires. In the first case, the input data obtained from each expert are individually considered and in the second case, they are simultaneously considered. Finally, a comparison of these two modes based on the technique presented in this article suggests considering views of several experts simultaneously to reduce uncertainties and ensure the results obtained for geological conditions and the construction time and costs.

공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구 (A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing)

  • 이영재;조동현;이미영;박상헌;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

A risk-based framework for design of concrete structures against earthquake

  • Hassani, Mohammadhassan;Behnam, Behrouz;Maknoon, Reza
    • Computers and Concrete
    • /
    • 제25권2호
    • /
    • pp.167-179
    • /
    • 2020
  • Optimal design of structures against earthquake loads is often limited to reduce initial construction costs, while the cost induced to structures during their useful life may be several times greater than the initial costs. Therefore, it is necessary to consider the indirect costs due to earthquakes in the design process. In this research, an integrated methodology for calculating life cycle cost (LCC) of moment-resisting concrete frames is presented. Increasing seismic safety of structures and reducing human casualties can play an important role in determining the optimal design. Costs incurred for structures are added to the costs of construction, including the costs of reconstruction, financial losses due to the time spent on reconstruction, interruption in building functionality, the value of people's life or disability, and content loss are a major part of the future costs. In this research, fifty years of useful life of structures from the beginning of the construction is considered as the life cycle. These costs should be considered as factors of calculating indirect costs of a structure. The results of this work represent the life cycle cost of a 4 story, 7 story, and 10 story moment-resisting concrete frame by details. This methodology is developed based on the economic conditions of Iran in 2016 and for the case of Tehran city.

조적벽의 CO2 배출비용을 포함한 건설원가 비교에 관한 연구 (Comparison of Construction Costs of Masonry Wall Types, including CO2 Emission Costs)

  • 이병윤;김보라;김광희
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.83-90
    • /
    • 2010
  • 건설산업에서 발생하는 $CO_2$배출량은 지구 온난화를 유발하는 주요 원인 중 하나이다. 이에 따라 건설산업에서는 $CO_2$배출량을 줄이기 위해 노력하고 있다. 최근 건축물의 $CO_2$배출량에 관한 다양한 연구가 진행되고 있지만 $CO_2$배출비용에 관한 연구는 아직 없는 실정이다. 본 연구에서는 벽체별(시멘트벽돌벽, 블록벽돌벽, 점토벽돌벽)로 기존 공사비에 $CO_2$배출비용을 포함하여 비교해 보았다. 그 결과 $CO_2$배출비용은 점토벽돌벽, 시멘트벽돌벽, 블록벽 순으로 높았다. 본 연구는 $CO_2$배출량을 비용으로 환산하는 방법을 제시함으로써 향후 $CO_2$배출량을 비용측면으로 비교해 볼 수 있는 기초적 자료를 제공할 수 있을 것이다.

부동산 건설업의 원가구조 변화에 대응한 공종별 신활동기준 원가관리 기법에 관한 연구 (A Study on the Method of New Activity Based Cost Management Coping with Changes in the Cost Structure of Real Estate Construction Industry)

  • 이정민
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.69-79
    • /
    • 2003
  • 국내 부동산 건설기업 중 2001년 말 현재 등록된 업체 중 약 93$\%$가 5억원 이하(적자 기업 포함)의 당기순이 익을 나타내고 있는 실정이다. 과거 10여년간의 매출원가 율과 매출원가 구성비율을 분석한 결과 매출원가 구성비에 큰 변화가 있었음을 발견하였다. 재료비, 노무비는 점차 감소하였고 외주가공비는 크게 증가하였다. 원가통제의 기본이 되는 활동점을 찾기 위해 공종별 신활동기준 원가관리를 모색하였다 부동산 건설업의 특징이 수주금액(판매금액)이 확정되어 있고 원가사용에 따라 이익 규모가 달라진다. 확정된 수주금액에서 최대의 이익을 창출하고, 새로운 원가관리 방법을 찾아 지속적인 경영혁신을 이루어야 할 시점이다. 공종별 신활동기준 원가관리는 부동산 건설업의 생존경영을 위한 관리혁신으로 생각된다. 실행예산과 경영원가 통제는 같은 대상을 놓고 서로 다른 관점에서 일정과 비용을 통제한다. 실행예산은 구체적인 활동 중심으로 집행되고, 경영원가는 지출내역인 재료비, 노무비, 외주비, 경비의 형태로 통제된다. 공종별 신활동기준 원가관리 방법을 이용하여 실행하기 위해서는 우선 활동의 동인이 무엇인가? 그 활동이 얼마만큼의 부가가치 창출을 하는지 사전에 분석되어 실행해야 한다. 부동산 건설업의 공종별 신활동기준 원가관리 기법은 부동산 건설업의 생존경영에 꼭 필요한 원가 관리 방법으로 지속적인 연구가 필요하다고 생각된다.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.