A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

A Study on the Method of Estimating Indirect Labor Cost Rate Using the Analysis of Cost Items in Complete Works (완성공사 원가구성 분석에 의한 간접노무비율 산정방법에 관한 연구)

  • Jung Soon-Kil;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.81-89
    • /
    • 2001
  • Construction industry has particular properties of non-continuity of production, and non-stability of market comparing to other industries. Because of them, the practical construction cost is more difficultly recognized than in manufacturing industry, so, that is various according to many projects. Therefore, it is very hard work to standardize construction cost, and it is worthy of analyzing and measuring exactly construction cost. On this study, the trouble in producing expected construction cost with original cost calculation method is progressed by the data of cost items in complete works. On the basis of analyzing data, as expected cost of practical construction is measured, it can be referred to the method and the standard of indirect labor cost rate in construction.

  • PDF

STATISTICALLY PREPROCESSED DATA BASED PARAMETRIC COST MODEL FOR BUILDING PROJECTS

  • Sae-Hyun Ji;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.417-424
    • /
    • 2009
  • For a construction project to progress smoothly, effective cost estimation is vital, particularly in the conceptual and schematic design stages. In these early phases, despite the fact that initial estimates are highly sensitive to changes in project scope, owners require accurate forecasts which reflect their supplying information. Thus, cost estimators need effective estimation strategies. Practically, parametric cost estimates are the most commonly used method in these initial phases, which utilizes historical cost data (Karshenas 1984, Kirkham 2007). Hence, compilation of historical data regarding appropriate cost variance governing parameters is a prime requirement. However, precedent practice of data mining (data preprocessing) for denoising internal errors or abnormal values is needed before compilation. As an effort to deal with this issue, this research proposed a statistical methodology for data preprocessing and verified that data preprocessing has a positive impact on the enhancement of estimate accuracy and stability. Moreover, Statistically Preprocessed data Based Parametric (SPBP) cost models are developed based on multiple regression equations and verified their effectiveness compared with conventional cost models.

  • PDF

Improvement Scheme on Green Construction Cost & Benefit through Analyzing Trends and Case Studies (해외사례조사를 통한 녹색건설 비용 및 편익 정보 체계의 개선 방향)

  • Kim, Won-Tae;Choi, Seok-In;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.44-54
    • /
    • 2013
  • As a green construction is a world-wide hot issue, Korean government is also putting forth a multilateral effort into reducing energy usage with setting aggressive goal under green growth policy. It is essential to analyse cost raised from designing and building green construction and benefit derived from the built facility for the sustainable green construction. However, compared to advanced countries in terms of green construction, there is lack of data and a systematic way for data collection and analysis in Korea. Without analyzing the cost-benefit of green construction, investors will hesitate to put his/her money into green construction and we can not expect its growth in construction industry. In this paper, cost of green construction was defined and categorized. Through case studies and various reports on cost-benefit analysis in advanced green construction countries, problems in terms of data collection and analysis in domestic green construction sector and improvement ways were suggested. The results of this study will contribute in classification of cost and benefit of green construction, data collection in systematic way, and increasing the feasibility of green construction via appropriate analysis on cost-benefit of green construction.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project (원전건설 물량데이터를 활용한 사업비관리 방안)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF