• Title/Summary/Keyword: Construction Techniques

검색결과 1,760건 처리시간 0.036초

DETAILS OF PRACTICAL IMPLEMENTATION OF REAL-TIME 3D TERRAIN MODELING

  • Young Suk Kim;Seungwoo Han;Hyun-Seok Yoo;Heung-Soon Lim;Jeong-Hoon Lee;Kyung-Seok Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.487-492
    • /
    • 2009
  • A large-scaled research project titled "Intelligent Excavating System (IES)" sponsored by Korean government has launched in 2006. An issue of real-time 3D terrain modeling has become a crucial point for successful implementation of IES due to many application limitations of state-of-the-art techniques developed in various high-technology fields. Many feasible technologies such as laser scanning, structured lighting and so on were widely reviewed by professionals and researchers for one year. Various efforts such as literature reviews, interviews, and indoor experiments make us select a structural light technique and stereo vision technique as appropriate techniques for accomplishment of real-time 3D terrain modeling. It, however, revealed that off-the-shelf products of structural light and stereo-vision technique had many technical problems which should be resolved for practical applications in IES. This study introduces diverse methods modifying off-the-shelf package of the structural light method, one of feasible techniques and eventually allowing this technique to be successfully utilized for achieving fundamental research goals. This study also presents many efforts to resolve practical difficulties of this technique considering basic characteristics of excavating operations and particular environment of construction sites. Findings showed in this study would be beneficial for other researchers to conduct new researches for application of vision techniques to construction fields by provision of detail issues about practical application and diverse practical methods as solutions overcoming these issues.

  • PDF

최근 BIM 관련 R&D 동향 조사 연구 (A Study on Current R&D for BIM)

  • 이도윤;이준복
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2015
  • For the past three years, the importance of automatic research has been increased. It was proved in previous research that the number of conducted research using 'Database' technique was the largest, but the amount of increase was the largest in research on 'BIM'. In consequence, it is predicted the research on 'BIM' will become a center of automation in construction. Therefore, the purpose of this paper is to examine trends though classifying into each construction phase and developed extent of techniques related to professionalization and integration with other techniques within a range of 'Automation in Construction Journal' which has the biggest level of awareness in construction field.

  • PDF

조선시대 화성성역의 공정관리 사례분석 (A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty)

  • 김균태
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

A Study on Strategies of Smart Green City - The Priority Analysis and Application of Planning Technique -

  • Lee, Seo-Jeong;Oh, Deog-Seong
    • KIEAE Journal
    • /
    • 제15권2호
    • /
    • pp.5-17
    • /
    • 2015
  • Purpose: The goal of this research is to identify the planning techniques of Smart Green City with Ubiquitous method and carbon-neutral city planning techniques and to induce the main planning techniques through the analysis of relative importance and practical adaptation. Method: First of all, eighteen planning techniques were derived and categorized into three organization systems and six sectors through literature review and FGI analysis considering the applicability of Ubiquitous service for carbon-neutral city planning techniques. Secondly, based on expert surveys and AHP analysis, the importance of Smart Green City planning techniques was evaluated. Thirdly, using case study, six cases related to Smart Green City were analyzed for the current status of application of planning techniques. Lastly, considering the importance of planning techniques and practical aspects, the characteristics of Smart Green City and its implication were estimated. Result: Energy, Resource and Waste and Transportation sector were identified as important sectors for Smart Green City. In addition, 'Construction of Smart Grid', 'System for Utilization of New & Renewable Energy', 'Smart Resource Circulation Management System', 'Establishment of Public Transportation Information System basis', 'Construction of Pedestrian / Bicycle oriented Road Environment' are essential planning techniques to create Smart Green City.

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

Compaction techniques and construction parameters of loess as filling material

  • Hu, Chang-Ming;Wang, Xue-Yan;Mei, Yuan;Yuan, Yi-Li;Zhang, Shan-Shan
    • Geomechanics and Engineering
    • /
    • 제15권6호
    • /
    • pp.1143-1151
    • /
    • 2018
  • Loess often causes problems when used as a filling material in the construction of foundations. Therefore, the compaction technique, shear behavior, and bearing capacity of a filled foundation should be carefully considered. A series of tests was performed in this study to obtain effective compaction techniques and construction parameters. The results indicated that loess is strongly sensitive to water. Thus, the soil moisture content should be kept within 12%-14% when it is used as a filling material. The vibrating-dynamic combination compaction technique is effective and has fewer limitations than other methods. In addition, the shear strength of the compacted loess was found to increase linearly with the degree of compaction, and the soil's compressibility decreased rapidly with an increase in the degree of compaction when the degree of compaction was less than 95%. Finally, the characteristic value of the bearing capacity increased with an increase in the degree of compaction in a ladder-type way when the degree of compaction was within 92%-95%. Based on the test data, this paper could be used as a reference in the selection of construction designs in similar engineering projects.

텍스트마이닝을 활용한 건설현장 재해 유형별 예방 대책 분석 (Analysis of Prevention Methods by Type of Construction Disaster Using Text Mining Techniques)

  • 조규필;이명도;신윤석;김백중
    • 한국재난정보학회 논문집
    • /
    • 제20권1호
    • /
    • pp.13-19
    • /
    • 2024
  • 연구목적: 본 연구는 텍스트 마이닝 기법을 활용하여 유형별 건설재해의 원인을 도출하여 중대재해 사고의 예방대책 마련을 위한 주요 요소를 파악하는 것을 목적으로 한다. 연구방법: 국내 건설분야의 중대재해 사례를 분석한 데이터베이스를 기반으로 예방대책과 원인을 텍스트 마이닝 기법으로 분석하고, 분석 내용을 시각적으로 표현하였다. 연구결과: 이 시각적 데이터는 중요도에 따라 공종별 중대 재해 예방에 필요한 요소의 파악을 용이하게 한다. 결론: 본 연구의 결과는 건설현장 중대재해와 관련하여 예방대책 마련 시 고려되어야 할 요소 및 요소간 명확한 상관관계의 파악에 기여할 것으로 사료된다.

세그멘탈 PSC박스거더교량의 시공간 계측모니터링을 통한 확률적 구조안정성 평가 및 제어 시스템 (Safety Assessment and Behavior Control System using Monitoring of Segmental PSC Box Girder Bridges during Construction)

  • 신재철;조효남;박경훈;배용일
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제5권3호
    • /
    • pp.191-201
    • /
    • 2001
  • In spite of the increasing construction of segmental PSC box girder bridges, the techniques associated with real-time monitoring, construction control and safety assessment during construction have been less developed compared with the construction techniques. Thus, the development of an integrated system including real-time measurement and monitoring, control and safety assessment system during construction is necessary fur more safe and precise construction of the bridges. This study presents a prototype integrated monitoring system for preventing abnormal behavior and accidents under construction stages, that consist of behavior control system for precise construction, reliability-based safety assessment system, and structural analysis. Also, a prototype software system is developed on the basis of the proposed model. It is successfully applied to the Sea-Hae Grand Bridge built by FCM. The integrated system model and software system can be utilized for the safe and precise construction of segmental PSC bridges during construction.

  • PDF

이산화탄소 배출량을 고려한 토공 장비조합의 선정 (Selecting of Earth-work Equipment Combination Considered CO2 Emission)

  • 김병수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1750-1756
    • /
    • 2011
  • After Kyoto Protocol was adopted for green gas reduction, each nations are stepping up efforts to reduce $CO_2$ of a typical green gas. Construction industry also is trying $CO_2$ reduction with the techniques of two types which are software and hardware techniques. The software technique are Passive Design considered green gas emission and the environment impact assessment by LCA. The hardware techniques are adjustment of equipment system and development of eco- friendly material. But, it is nonexistent that a study related to $CO_2$ emission considered detail process in construction industry. This study analyzed the relativeness of equipment combination and $CO_2$ emission by calculate $CO_2$ emission follow to equipment combination on earth-work which is the process emitted most $CO_2$ among railway bedding construction.

  • PDF

제주도 석산 부산물인 화산토를 사용한 흙포장의 강도 및 시공 특성 (Strength Characteristics of Soil Concrete Using Jeju Volcaniclastic and Construction Techniques)

  • 홍종현
    • 한국환경과학회지
    • /
    • 제20권1호
    • /
    • pp.71-79
    • /
    • 2011
  • In this study, a series of soil concrete mixtures were tested for the compressive strength according to ratio of aggregate to binder, compaction energy, maximum aggregate size, ratio of silica fume to cement, and ratio of water to binder. The optimum mixing ratio of soil concrete mixtures composed of volcaniclastic, cement, silica fume, concrete polymer and water were analysed. The test results for optimum proportion were as follows ; (1)ratio of aggregate to binder was 4 : 1, (2)compaction energy level was level 2, (3)maximum aggregate size was 13 mm, (4)ratio of silica fume to cement was 10%, (5)ratio of water to binder was 25%. Also, dry type construction techniques were applied using the optimum soil concrete mixture. From the results of this study, the compressive strength of soil concrete and construction techniques were suitable for making eco-friendly soil pavement.