• 제목/요약/키워드: Construction Structure

검색결과 6,415건 처리시간 0.037초

서울지하철공사와 암반구조 (Geological Structure Related to Seoul Sub-way Construction.)

  • 이수곤
    • 화약ㆍ발파
    • /
    • 제10권3호
    • /
    • pp.8-25
    • /
    • 1992
  • On the Sub- way Construction It is important to Survey in advance the Geological Structure and also to make the Engineering Geological map this paper deseribs the feature of Geological structure of Seoul Area and analyses the recently occured Rock falling acciudents. NATM Tunnelling always must be done with careful observation and measurement of the geological condition.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

맞춤형 테트라블록을 이용한 야계사방구조물이 계류수질에 미치는 영향 (Influences of the Construction of the Torrent Control Structure using Customized Tetrapods on the Stream Water Quality at Valley)

  • 박재현;마호섭;김기흥;윤호중
    • 한국산림과학회지
    • /
    • 제100권1호
    • /
    • pp.105-111
    • /
    • 2011
  • 이 연구는 경상남도 산청군 홍계 계곡에 설치한 맞춤형 테트라블럭을 이용한 야계사방구조물의 설치 전 후의 계류수질 변화를 밝힘으로써 산림내 계류수질 보전 및 관리방안 마련을 위한 기초 자료를 제공하기 위하여 수행하였다. 연구결과, 맞춤형 테트라블록(Tetrapod)을 이용한 야계사방구조물을 시공한 후에도 계류수의 pH는 하천수질환경기준 상수원수 1급수의 범위 내였다. 맞춤형 테트라블록을 이용한 야계사방구조물의 시공 후 계류수의 용존산소량 (Dissolved Oxygen)은 거의 변화하지 않았으며, 전기전도도(Electrical Conductivity)는 오염원이 없는 맑고 깨끗한 일반적인 계류수에서의 전기전도도의 범위 내에 포함되었다. 맞춤형 테트라블록을 이용한 야계사방구조물을 설치한 후 계류수 하류의 평균 음이온량(Average of total amount of anion)은 약 3.07/2.30~3.60 mg/L로 맞춤형 테트라블록을 이용한 야계사방구조물을 설치하기 전과의 차이는 약 0.24 mg/L로 그 양도 미미한 것으로 분석되었다. 아울러 맞춤형 테트라블록을 이용한 야계사방구조물을 설치한 계류수는 오염되지 않은 일반적인 계류수에서의 수질과 유사하여, 이러한 야계사방구조물 설치에 따른 계류수질 오염의 영향은 나타나지 않은 것으로 분석되었다.

프로젝트파이낸싱 기반 수익형개발사업에 CM적용을 통한 관리구조 개선방안 (Management Structure Improvement by Construction Management in The Project Financing Development Projects)

  • 이은숙;김양현;정용찬;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.250-253
    • /
    • 2003
  • IMF 이후 건설기업들은 대규모 자금이 요구되는 수익형 개발사업에 관심을 가지기 시작하였다. 그러나 기존의 자금조달방식으로는 자금조달이 어려워 프로젝트파이낸싱기법을 활용하기 시작했다. 프로젝트파이낸싱은 수익형개발사업의 특성에 적합한 자금조달기법이지만, 금융사에서는 제도적 문제와 대출 심사위원의 인식 부족, 내부 관리의 어려움으로 대출을 기피하고 있다. 수익형개발사업에서 '프로젝트파이낸싱'의 활성화를 저해하는 요인 중 하나는 프로젝트파이낸싱 주요주체간에 야기되고 있는 사업관리에 대한 전문성, 객관성, 투명성 부족이다. 따라서 성공적인 사업을 위해서는 건설업에 대한 전문지식을 바탕으로 사업관리의 전문성과 투명성이 필요한 실정이다. 본 연구에서는 수익형개발사업에 관련된 주요주체간의 사업관리에 대한 구조와 책임을 분석하고, 수익형개발사업에서 프로젝트파이낸싱을 활성화시키기 위해 CM을 적용한 개선된 관리구조를 제시하였다.

  • PDF

VE 적용에 의한 지하 골조공사 개선연구 (Case Study on the Improvement of Underground Building Works through the VE)

  • 홍재욱;김선국;이종국
    • 한국건설관리학회논문집
    • /
    • 제5권3호
    • /
    • pp.106-113
    • /
    • 2004
  • 건설산업의 고부가가치화를 위해서는 계획적인 원가절감에 의한 방법과 기능의 향상에 의한 방법 및 효율적인 추가 원가투입에 의하여 더 높은 기능 향상을 실현함으로써 부가가치를 높이는 방법을 추구하여야 할 것이다. 특히 건축공사에서 골조공사는 전체 공정 및 원가에 영향을 크게 미치는 주요 공정으로서 철저한 공사관리 계획과 관리가 요구되는 부분으로서 생산 활동 및 공사 방식 선정의 효과를 크게 볼 수 있는 항목이라 할 수 있다. 본 연구는 현재 도심지 공사에서 날로 증가하고 있는 지하공사의 비율을 감안하여 지하골조 공사의 성능개선에 초점을 두었다. 건축물의 지하골조공사에 있어 효과적인 공기 및 원가절감을 위하여 VE 기법을 검토하여 VE 프로세스와 분석차원을 모델링하고, 이를 현장에 적용, 사례연구를 통하여 그 타당성을 입증하였다. 따라서 본 연구는 건축물 지하골조공사의 VE 활용모델로서 기술대안 선정방식 수립의 기초적인 연구가 될 것으로 기대된다.

부유구조체 형상에 따른 동요감소 특성분석 (Characteristic Analysis of Reduced Motion due to the Shape of Floating Structure)

  • 이두호;정연주;유영준;박민수
    • 한국해안·해양공학회논문집
    • /
    • 제25권6호
    • /
    • pp.357-364
    • /
    • 2013
  • 이전 연구에서는 부유구조체의 동요저감을 위해 폰툰과 반잠수식 부유구조체 형식을 결합하여 하이브리드 부유구조체를 제안한 바 있다. 하이브리드 부유구조체는 입사파랑에 대한 동요감소에는 효과적이었으나 부유구조체에 충분한 부력을 제공할 수 없는 단점이 있었다. 이와 같은 단점을 보완하기 위해 본 연구에서는 새로운 형식의 콤비네이션 부유구조체를 제안하였다. 입사 파랑하중에 대한 부유구조체의 동요감소 효과를 비교하기위해 폰툰, 콤비네이션 그리고 하이브리드 부유구조체에 대한 수치해석을 동수역학 해석프로그램 ANSYS AQWA를 이용하여 수행하였다. 본 연구에서 제안된 콤비네이션 부유구조체가 다른 부유구조체에 비해 동요감소에 효과적인 것을 확인할 수 있었다. 따라서 콤비네이션 부유구조체는 앞으로 개발될 초대형 부유구조체 건설을 위한 신형식 부유구조체로서 매우 유용하게 사용될 것으로 판단된다.

The geomorphic characteristics of Bulguksa-region and the earthquake resistant structure of the Bulguksa-Temple

  • Hwang, Sang-Ill
    • 한국제4기학회지
    • /
    • 제22권2호
    • /
    • pp.1-5
    • /
    • 2008
  • Some reverse fault lines pass through the alluvial fans and west hill slope of Bulguksa mountains including Mt. Toham in the directions of N-S and NW-SE. The study area is known as relatively unstable, because of active faults. Assuming the record of earthquake in the Samguksagi, the architects in the construction of the Bulguksa temple should have recognized the possibility of breakdown from the earthquakes and the need for an unique structure against at that time. Against earthquakes, Greavee technique, a stonework construction technique following woothe one and use of Chushouok (Dongtleouok or Chumchaouok) were applied for the construction of Bulguksa temple. By designing the foundation stone with hole, a structure is prevented from motiff Ction that pillarsakdcede from a foundation stone in spite of horizontal load of earthquake while woot construction isaktrong frame at earthquake. The Bulguksa-temple isausually evaluated to be a beautiful architecture from the appeaultces like the weight balltced structure with unique decoration. ampressive architectures are beautiful in balance and harmony coming from the important and specific rolls in its own way by each part of whole structure. This beauty comes from the science.

  • PDF

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Seismic response of combined retaining structure with inclined rock slope

  • Yu-liang, Lin;Jie, Jin;Zhi-hao, Jiang;Wei, Liu;Hai-dong, Liu;Rou-feng, Li;Xiang, Liu
    • Structural Engineering and Mechanics
    • /
    • 제84권5호
    • /
    • pp.591-604
    • /
    • 2022
  • A gravity wall combined with an anchoring lattice frame (a combined retaining structure) is adopted at a typical engineering site at Dali-Ruili Railway Line China. Where, the combined retaining structure supports a soil deposit covering on different inclined rock slopes. With an aim to investigate and compare the effects of inclined rock slopes on the response of combined retaining structure under seismic excitation, three groups of shaking table tests are conducted. The rock slopes are shaped as planar surfaces inclined at angles of 20°, 30°, and 40° with the horizontal, respectively. The shaking table tests are supplemented by dynamic numerical simulations. The results regarding the horizontal acceleration response, vertical acceleration response, permanent displacement mode, and axial anchor force are comparatively examined. The acceleration response is more susceptible to outer structural profile of combined retaining structure than to inclined angle of rock slope. The permanent displacement decreases when the inclined angle of the rock slope increases within a range of 20°-40°. A critical inclined angle of rock slope exists within a range of 20°-40°, and induces the largest axial anchor force in the combined retaining structure.

세미 오픈컷 역타공법의 현장적용에 관한 연구 (Study on the Application of Semi-open cut Top-Down Construction for Framework)

  • 소광호
    • 한국공간구조학회논문집
    • /
    • 제11권2호
    • /
    • pp.129-138
    • /
    • 2011
  • 지하공사는 상부층의 구조물과 연계된 시공순서에 따라 Bottom-Up공법, Up-Up공법 그리고 Top-Down 공법으로 대별할 수 있다. 탑다운 공법을 사용하면 건물의 본구조를 흙막이지보공으로 이용하면서 상층에서 하층으로 굴착과 구체구축을 반복하여 시공함으로써 인접구조물이나 주변 지반의 변위를 극소화 시킬 수 있다. 이는 토류벽의 안정성이 높으며, 각층의 바닥슬래브를 작업공간으로 사용하여 도심지 공사에서 작업장 확보가 용이하다. 그러나 굴토작업이 슬래브 하부에서 진행되므로 작업 능률 및 작업환경이 저하되고, 어스앵커 공법보다 경제성이 없다는 이유로 다소 회피하는 경우가 종종있다. 따라서 본 논문에서는 터파기 공사는 세미오픈컷 공법을 적용하고 흙막이 공법에는 지하연속벽(슬러리월)을 그리고 지보공으로는 C.W.S공법을 적용한 역타공법으로 대상현장을 중심으로 기존 역타공법과 경제성, 공사기간 및 작업성 등을 분석 제시하였다. 토사운반 및 철골설치공사 작업의 용이성과 PRD 공사의 정밀도 향상 등의 품질관리가 우수하며, 공기단축이 가능하였다.