• Title/Summary/Keyword: Construction Strategy

Search Result 1,324, Processing Time 0.027 seconds

Factors Influencing Human Resource Planning (HRP) for Local Workforce Supply in Malaysian Construction Industry

  • Dom, Norhidayah Md;Kasim, Narimah;Shamsudin, Alina
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.5-13
    • /
    • 2012
  • The lacks of local workforce supply become a problematic in Malaysian construction industry. Meanwhile, HRP is important during workforce supply to help organizations in order to appoint the right people in the right job. This paper reports on the use of factors influencing HRP towards local workforce supply in the construction industry in general, and Malaysian construction in particular. Semi structured interviews were conducted to 10 interviewees from the government and non-government organizations to investigate current issues of local workforce and the practices of HRP in the construction organization. The analysis methods were based on descriptions of previous tested research. The findings reveal that the lack of local workforce is due to low wages system, safety issues, educational changes, low status and unsecured work, environment in construction industry, developments and technologies changes in Malaysia. The internal factors of HRP were practiced among construction organization are organization strategy, organizational culture, organization changes, leadership and experience, nature of work and empowerment of labor. Meanwhile, the external factors are technology changes, economic changes, legislation and demographic changes. The paper provides valuable information on the practices of factors influencing HRP for local workforce supply in Malaysian construction industry.

Trend Study on Image of Construction Industry and Its Improving Strategy (건설업 이미지 변화 비교 분석 및 개선 전략)

  • An, Sung-Hoon;Gwon, Je-Joong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.471-477
    • /
    • 2016
  • The construction industry is very important to supply the facilities and infrastructure in Korea. However, the images of construction industry are negative in actual. In addition, the studies to improve the images of construction industry up to now have a limitation to research the images about that time. So, in this study, the authors examined and analyzed the peoples' trend changes of the images of construction industry with time. The results showed that the positive images of construction industry about the contribution to national economy and the future prospect are diminished. And it is revealed that the negative images of construction industry about the morality are decreased, too. The authors proposed the strategies to improve the images of construction industry by the based on these results.

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

A Study on the Estimating Strategy for the Design Phase VE Consulting Fee (설계VE 용역대가 산정방안에 관한 연구)

  • Kim Chul-Woong;Jung Young Il;Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.97-106
    • /
    • 2002
  • at the design phase and the effective design phase VE application, it is not sufficient to implement VE study at the design phase in the domestic construction industry. The method for estimating design phase VE consulting Fee regulated in current guideline and the insufficient incentive system according to the result of design phase VE application are major problems among the problems related to the roadblock of the active implementation Design phase VE. In this paper, firstly the current methods for estimating Engineering business consulting fee analogous to design phase VE and the domestic and foreign design VE consulting fee were examined, and detailed problems related to the method for estimating design VE consulting fee were indicated, and the Improvement direction were established. Secondly, the estimating strategy for the design phase VE consulting fee and the payment strategy of incentive according to the result of savings were proposed. Finally, the strategies were verified by interview with the experts.

Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program - (대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 -)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Hyun, Chang-Taek;Lee, SangHoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.54-63
    • /
    • 2022
  • In order to derive the success factors of a Mega-scale national project, this study conducted a questionnaire survey on experts participating in the Yongsan National Park development program to obtain critical success factors in the program definition phase. AHP analysis was performed for each category through a survey of experts participating in the definition phase of the Yongsan park development program to derive relative importance. The categories were classified into program strategy, process, and people, and the importance between categories was people, strategy, and process in that order. In addition, as for the 27 critical success factors in the program definition phase, the program manager's competency and leadership, environmental and cultural property survey planning, program management plan preparation, operation and maintenance philosophy, and integrated program office showed high priorities. Therefore, in promoting the Yongsan Park development program, we propose a strategy for selecting and focusing on the critical success factors with high priorities in the program definition phase proposed in this study.

Changes in the Labor Market and Response Strategies of Construction Automation Services -Focused on purpose, implication, and strategy- (건설 자동화 서비스로 인한 노동시장의 변화와 대응전략 -목적, 시사점, 전략을 중심으로-)

  • Jae-Myung Lee;Yong-Ki Lee
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.158-175
    • /
    • 2022
  • This study discusses mass unemployment and job insecurity due to the 4th industrial revolution and technological progress. In particular, the construction automation service method can contribute to increasing work productivity, preventing on-site safety accidents, and enhancing the competitiveness of the construction industry according to rapid development and convergence between technologies. However, there is great concern that the position of workers will decrease and the income distribution will deteriorate. Therefore, this study is necessary to alleviate the anxiety of the labor market and to find a direction for the government and all walks of life to ponder. To carry out this study, in-depth interviews were conducted with two experts currently engaged in the construction field, and through analysis, we intend to derive meaning and identify current trends, identify necessary improvement measures and institutional areas and suggest research directions. As a result of the analysis, it is possible to suggest a response strategy in a total of three themes: purpose, implication, and strategy. Based on this, there are response strategies in four areas: (1) industrial site response, (2) worker response, (3) education, and (4) training response, and government and corporate response. Through this study, it is necessary to revitalize economic and sociological discussions in the future so that the improvement in productivity and efficiency of society as a whole due to technological innovation of construction automation services does not lead to social problems such as an increase in the unemployment rate and a decrease in jobs in the labor market.

The Research on the Preference Factors of Apartment Brand (아파트 브랜드 선호도 요인 비교에 관한 연구 -수도권지역과 시 단위지역 중심의 선호도 비교-)

  • Shin, Han-Woo;Kim, Dae-Won;Kang, Kyung-In;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.77-82
    • /
    • 2008
  • In the housing market, the construction company started to recognize the importance of the brand power since 1998. Many brand names of apartment construction company have newly formed and many apartments are representative of the brands of construction company by quality of apartment construction and service after hand apartment over to owner with many other elements of their brands. According to these trends in the housing market, it should be also interested in improving the value of brand name in apartment construction. The former researches have been achieved several topics in only a specific target market about the distinction of apartment's plan, the examination of preference, and the satisfaction survey of inhabitants etc. But construction company don't have developed any available marketing strategy according to construction location and regional characteristics. Nowadays, they should be interested in improving the value of apartment brand. Therefore, this research was conducted by interviewing and surveying preference factor, which factors are considered by consumer when consumers purchase apartment house, to compare the two regions such as Metropolis and Cities. The purpose of this research is to provide the preference trend of apartment house in the future to construction company by comparing consumer's preference examination.

Cambodian Construction Industry's Issues in the ASEAN Economic Community

  • MIN, Vuthea;Leungbootnak, Narong;Srinavin, Korb;Aksorn, Preenithi;Deewong, Watcharapong
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.1
    • /
    • pp.1-10
    • /
    • 2016
  • Issues in the construction industry of Cambodia in ASEAN Economic Community (AEC) is the main priority to be identified before identifying causing factors in order to find out recommendations, to improve this sector, and to survive in this community. Two major issues were identified from the literature review and the investigation, namely i) Long-term vision and its policy, and ii) practice culture. The total sample collected from concerned government officers and engineers in Cambodia were 463. Factor analysis was then conducted to find out the issues, and as the results, there are five issues in two main groups: (i) the Organization's vision and its skill, which consist of a vision of the organization, knowledge and skill, and less investmen in the construction sector; (ii) Knowledge and motivation towards the AEC, which consist of knowledge about the AEC, and level to promote organization for the AEC.

IMPACTS OF DESIGN-BUILD DELIVERY SYSTEM ON THE CONSTRUCTION INDUSTRY IN TAIWAN

  • Min-Ren Yan;Wei Lo;Chien-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1007-1012
    • /
    • 2005
  • Although the design-build (DB) delivery system has been taking great strides in the world and relevant researches have also been quite abundant, few studies have dealt with its potential impacts on the construction industry as a whole. This research first identified the potential entry barrier factors, which may hinder the market access, based on the theory of industrial economics and characteristics of DB project. Then through a nation-wide questionnaire survey involving 103 construction contractors and engineering consultants, the influences of each factor on company's competitiveness and corporate strategies were scrutinized, and consequently, the evolution of the construction industry was examined. It is found that as opposed to the traditional design-bid-build delivery system, the DB delivery system elevates competitive advantages of large organizations in terms of the financial capability, working experience, human resource, and administrative strength, and among them, the financial strength was concluded to be the most significant force in differentiating corporate strategies and widening the gap of competitiveness between companies. It is inferred if the government extensively adopts DB delivery system, large organizations that already possess the competitive advantage tend to obtain both design and construction abilities, and dominate the DB market. Small and medium sized companies will find little room to maneuver and be forced to become specialty sub-contractors.

  • PDF

DEVELOPMENT OF STRATEGIES FOR APPLICATION OF 4D MODELING IN CONSTRUCTION MANAGEMENT

  • Yang-Taek Kim;Chang-Taek Hyun ;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1181-1186
    • /
    • 2005
  • In many construction projects, progress and efficiency are hampered by poor communication of discipline-specific models. For example, architects use 2D or 3D CAD models and builders use CPM diagrams, Gantt charts, and spreadsheets to show their view of the project. Nowadays, advanced computer visualization tools, 4D CAD or VR, can show these disparate models to understand cross-disciplinary impacts of design and construction decisions. In Korea, several leading companies have tried to apply these tools to their pilot projects from the design phase to the maintenance phase. These companies have expected that more project stakeholders could understand a construction schedule more quickly and completely with 4D visualization than with the traditional construction management tools. However, modeling of the 4D CAD or VR can be quite time-consuming and expensive to generate manually and has therefore limited the spread and use of these models. In order to adopt widely those models in construction industry, the areas that those tools could support to take large benefits in diverse functional areas of construction management need to be analyzed. In this study, researchers analyze the usefulness and limitations of the 4D models and VR in the construction industry, develop the strategy of application priority, and improve the 4D modeling method.

  • PDF