• Title/Summary/Keyword: Construction Standard

Search Result 3,420, Processing Time 0.03 seconds

A Study of Standardization of Floor Slip Test method using O-Y·PSM (경사인장형 바닥 미끄럼 시험방법의 표준화에 관한 연구)

  • Shin, Yun-Ho;Kang, Yong-Hak;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.95-96
    • /
    • 2016
  • The floor slip test method using O-Y·PSM was developed based on the risk assessment and sense of slip by the users implementing actions such as changing walking direction on a floor. This test method is regulated under the Korea Industrial Standard KS M 3510, and in the Korea Industrial Standard KS F 3230, the article of KS M 3510 is cited. Yet, in the standard, the surface condition of test or slip adjustment method is merely mentioned or difficult to be found, and thus it creates confusion in floor slip test using O-Y·PSM. Therefore, this study is to provide the useful data to revise the relative standard through the standardization study including various surface conditions of sample and slip adjustment method used in floor slip test method using O-Y·PSM.

  • PDF

A Case of the Distribution Power System PQMS Construction & Harmonic Voltage Analysis (배전계통 PQM 시스템 구축 및 고조파전압 분석사례)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.9
    • /
    • pp.108-117
    • /
    • 2010
  • The main contents of this paper are the PQM system construction case and distribution system harmonic voltage analysis. The PQM system has constructed by KEPCO in order to investigate power quality of distribution power system for new power quality standard of KEPCO. In result, we have confirmed that voltage harmonic measurement value of the high voltage contract customer 8 households is suitable the KEPCO harmonic standard tentative plan. And the voltage harmonic value of distribution line end side is not always more high than source side by harmonic current offset effect. In the future, acquired data by season, region, load from the PQMS will be used on the resonable harmonic standard enactment in KEPCO.

Quality Assurance Scheme of Small-Scale Construction Company ERP (소규모 건설회사 ERP의 품질 보증 방안)

  • Jang, Dai-Hyun;Shin, Seong-Yoon;Lee, Hyun-Chang
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • In this paper, we discuss the project standard development method of ERP of small-scale construction company. The project development methodology and the outcomes of major development stages are discussed. Let's look at the development standard.

  • PDF

Effect of acid-treatment aggregate on compressive strength of cement mortar (산 처리 골재가 시멘트 모르타르의 압축강도에 미치는 영향)

  • Shi, Yixuan;Jang, Indong;Yi, Chongku
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.151-152
    • /
    • 2019
  • This study is aimed at comparing the effect of cement mortar made of sulfuric acid treated ISO standard sand with that of cement mortar made of normal ISO standard sand. In the water absorption test, water absorption of standard sand increases with the increase of immersion time in sulfuric acid solution. The results show that at the water cement ratio of 0.5, the longer the standard sand is immersed in sulfuric acid, the greater the compressive strength of the cement mortar sample.

  • PDF

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

Effects of Civil Blasting on Noise, Vibration and Total Suspended Particles (토목 발파가 소음, 진동, 부유 분진에 미치는 영향)

  • Jeong, Jin Do;Jeong, Yeong Guk
    • Journal of Environmental Science International
    • /
    • v.13 no.1
    • /
    • pp.99-107
    • /
    • 2004
  • This research is to determine the level of environmental pollution at a blasting construction area which is the origin of noise, vibration, and suspended particle, and to compare the results with other domestic and international standard data. This experiment is also to find out the effects resulting from blasting construction and to propose a plan that can decrease environmental pollution. The blasting construction area is a factory site which is about one and half million square meter and sewage disposal plant is about ninety thousand square meter. Both were selected as the areas for the tests to be conducted in determination test. The test to determine the level of noise, vibration, and total suspended particle was conducted thirty times around the blasting construction area by comparing measurement results and numerical analysis. However, as the test was not conducted in the laboratory but in the actual blasting construction area, it was not possible to do the test with the same exact conditions each true. Therefore, the test was not ideal as conditions could change from test to test. For the most part, the level of noise was below the standard level of 70dB. Every vibration test was under the standard limitation. For example, a house, 200m away was tested for noise and vibration and the level was found to be under the 0.2 cm/sec which is the standard for specialty designed cultural sites., i.e very low level. Also a buried oil pipeline that was 30m away also marked under 2.0cm/sec which is the norm for an industrial area. However, if there were an oil pipeline under the house, the amount of charging gunpowder per hole should be decreased compared to the amount used in the test. The test result for suspended particles under the standard limitation which is 24hour average 300$\mu\textrm{g}$/㎥ at a distance from blasting wavelength, but at detonator, total suspended particle from the blast origin exceeded the standard limitation. If explosion occurs when it detonates in the hole, most of the energy would be absorbed in the crushing of rocks, but some remaining energy would make noises and vibration inevitable. So the important thing is how to minimize the environmental pollution from the blasting. There should be regulations in order that the standard limitation is not exceeded, and to decrease the environmental pollution from the blasting.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

A Study for the Improvement on Use Transparency of the Occupational Safety and Health Management Cost in Construction (건설업 산업안전보건관리비 사용 투명성 강화 방안 연구)

  • Lee, Sun Yong;Jeong, Seong-Choon;Oh, Se Wook
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.34-44
    • /
    • 2020
  • The purpose of this study is to suggest ways to improve the transparency of occupational safety and health management cost (OSHMC) in order to create a safe working environment that can guarantee the health of construction workers. It was performed in the following procedures and methods. (1) collecting and analyzing resources related to the OSHMC in construction, (2) gathering stakeholder opinions for interviewing actual conditions, (3) deriving the improvement plans based on survey results and (4) suggesting direction for improvement of related laws based on the results of the research. As a result of this study, the following ways were found to be effective for enhancing transparency of the OSHMC in construction. (1) disclosure of usage details in sites, (2) Expansion of the standard for the OSHMC in construction, (3) Increase in fines for false use, (4) Establishment of the plan to improve the OSHMC ratio of small-scale construction sites, (5) Strengthen the role of supervisory and support organizations such as the Ministry of Employment and Labor and the Korea Occupational Safety & Health Agency. The result of this study is expected to be used as a basic data for future improvement of the occupational safety and health acts in Korea.

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

Standard Establishment Model for Value Engineering Work in Construction Projects (건설 프로젝트 VE업무 기준 수립 모델)

  • Kim, Soo-Yong;In, Chi-Sung;Yang, Jin-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.483-486
    • /
    • 2006
  • The value engineering(VE) in construction projects is systematic method which improve quality as well as reduction input cost and as construction VE work extends the range of application, the importance is rising. For this reason studies are needed to enforce design value engineering work systemically and effectively. In this study, we analyzed the problem of the present construction VE processing and deduced the model to be most suitable the work efficiency. As suggested model reflects systemically requirement item of owner and user, it will make approaching direction and standard establishment possible. So it will increase the following function analysis in analyzing step and the effectiveness of creating idea and make successful VE result.

  • PDF