• Title/Summary/Keyword: Construction Stage Analysis

Search Result 923, Processing Time 0.028 seconds

Development of System and Cost Function Model for Life Cycle Cost Analysis of Bridge (교량의 생애주기비용 분석을 위한 비용함수 모델 및 시스템 개발)

  • Park Mi-Yun;Sun Jong-Wan;Eom In-Soo;Cho Hyo-Nam
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.704-711
    • /
    • 2005
  • Recently Life Cycle Cost Analysis for civil infrastructures such as pavements, bridges, and dams has been emphasized However, so far, there are few systems available for life cycle cost analysis of bridges at design stage. Therefore, the objective of this paper is to develop a user-friendly life-cycle cost analysis system for LCC-effective optimal design decision making at design stage. The program is based on the proposed LCC model, formulation, analysis modules and systematic procedure that suit Korean construction conditions. It is expected that the developed system can be effectively utilized for more LCC-effective design of bridges. It is applied to an actual bridge design project in order to demonstrate its effectiveness and applicability.

  • PDF

Minimization of differential column shortening and sequential analysis of RC 3D-frames using ANN

  • Njomo, Wilfried W.;Ozay, Giray
    • Structural Engineering and Mechanics
    • /
    • v.51 no.6
    • /
    • pp.989-1003
    • /
    • 2014
  • In the preliminary design stage of an RC 3D-frame, repeated sequential analyses to determine optimal members' sizes and the investigation of the parameters required to minimize the differential column shortening are computational effort consuming, especially when considering various types of loads such as dead load, temperature action, time dependent effects, construction and live loads. Because the desired accuracy at this stage does not justify such luxury, two backpropagation feedforward artificial neural networks have been proposed in order to approximate this information. Instead of using a commercial software package, many references providing advanced principles have been considered to code a program and generate these neural networks. The first one predicts the typical amount of time between two phases, needed to achieve the minimum maximorum differential column shortening. The other network aims to prognosticate sequential analysis results from those of the simultaneous analysis. After the training stages, testing procedures have been carried out in order to ensure the generalization ability of these respective systems. Numerical cases are studied in order to find out how good these ANN match with the sequential finite element analysis. Comparison reveals an acceptable fit, enabling these systems to be safely used in the preliminary design stage.

Nonlinear Control of General System based on a Model with Coefficients of State-Depended Representation

  • Nakamura, Masatoshi;Zhang, Tao
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.76.1-76
    • /
    • 2002
  • This paper addresses a method for nonlinear controller construction for a general nonlinear system with the separation of controller construction and manipulated values generation. The nonlinear system model is firstly expressed with the coefficients of state-depended representation. The nonlinear control is designed without any approximation based on the model with state-depended representation. At the stage of controller implementation for the nonlinear system, the manipulated values are calculated accurately by use of an algorithm of the numerical analysis. The numerical error for calculating the manipulated value can be reduced to zero by selecting the sampling interval being a small val...

  • PDF

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

A Technical Analysis of Real Time Location System for Automation in Construction (건설작업 자동화를 위한 실시간위치추적시스템 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.15-18
    • /
    • 2009
  • Due to its high dependency of manpower, construction work has several difficulties in terms of quality control, imbalance of supply and demand of qualified manpower, safety management for them and improvement of production. Such problems related to the management can be at some degree solved by introducing an automation facility. Since the unique environment of a construction site in the past was not structured, it is very hard to introduce a facility to automate construction work from operation of the equipment to assignment of where to work. This is a preliminary research for automation of construction work. In this study, the trend of development of a cutting-edge technology, RTLS, was researched and analyzed in order to review the possibility of utilizing RTLS in construction work and present a control mechanism for construction equipment. Although the presented mechanism is at the concept stage, which still has lots of restrictions to be solved, the application of the RTLS will be very much feasible. That is, if linkage of the study between the RTLS and the automation of construction is built, it will be expected to contribute to many fields such as cost reduction through efficient and systemic management, the reduction of construction period and precise construction as well as raising the level of the automation of domestic construction work.

  • PDF

Productivity Analysis of the Prefabrication Stage for Layered Modular Housing Units (적층식 모듈러 공동주택 공장제작 단계의 생산성 분석)

  • Seok Kim;Suyeul Park;Moonsun Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.2_2
    • /
    • pp.403-414
    • /
    • 2024
  • The aim of this study is to evaluate the productivity of multilayered modular housing units during the prefabrication phase. Additionally, it shows the results of productivity analysis conducted using the Web Cyclone technique. Initially, an review of literature and prior studies helped outline the comprehensive manufacturing process of laminated modular apartments, examining the range of minimum, average, and maximum work durations along with workforce size. Subsequently, the productivity of the multilayered apartments' prefabrication was assessed using the Web Cyclone technique, focusing on the workflow, duration, and personnel involved. This analysis also included a comparison of productivity against the initial plan based on the outcomes of a sensitivity analysis.

Site Investigation and stability analysis for water tunnel being neighboring construction (근접시공에 대한 수로터널 지반조사 및 안정성 분석)

  • Jeon, Je-Sung;Kim, Ki-Young;Lee, Sang-Duk;Kim, Doo-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.550-555
    • /
    • 2005
  • In vicinity of Seoul, there has been water service tunnel that classified into 1st grade facility by special act for the safety control of public structures and with providing capacity equals to $1,543{\times}10^3$(ton/day) and inner pressure equals to $2.5-3.5kg/cm^2$. In this research, site investigation and stability analysis for water tunnel caused by new construction of road tunnel were carried out. the ground near water tunnel were zoned into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, using results of site investigation, stability of existing tunnel have been analyzed for Hydraulic Fracture/Jacking and deformation in detail.

  • PDF

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

Effect of horizontal joints on structural behavior of sustainable self-compacting reinforced concrete beams

  • Ibrahim, Omar Mohamed Omar;Heniegal, Ashraf Mohamed;Ibrahim, Khamis Gamal;Agwa, Ibrahim Saad
    • Advances in concrete construction
    • /
    • v.10 no.5
    • /
    • pp.455-462
    • /
    • 2020
  • This study investigated the effect of horizontal casting joints on the mechanical properties and structural behavior of sustainable self-compacting reinforced concrete beams (SCRCB). The experimental research consisted of two stages. The first stage used four types of concrete mixtures which were produced to indicate the effects of cement replaced with cement waste at 0%, 5%, 10%, and 15% by weight of cement content on fresh concrete properties of self-compacting concrete (SCC) such as, passing ability, filling ability, and segregation resistance. In addition, mechanical properties such as compressive, tensile, and flexural strength were also studied. The second stage selected the best mixture from the first stage and studied the effect of horizontal casting joints on the structural behavior of sustainable SCRCBs. The effect of horizontal casting joints on the mechanical properties and structural behavior were at the 25%, 50%, 75%, and 100% of sample height. Load deflection, failure mode, and theoretical analysis were studied. Results indicated that the incorporation of replacement with cement waste by 5% to 10% led to economic and environmental advantages, and the results were acceptable for fresh and mechanical properties. The results indicated that delaying the time for casting the second layer and increasing the cement waste in concrete mixtures had a great effect on the mechanical properties of SCC. The ultimate load capacity of horizontal casting joints reinforced concrete beams slightly decreased compared with the control beam. The maximum deflection of casting joint beams with 75% of samples height is similar with the control beam. The experimental results of reinforced concrete beams were substantially acceptable with the theoretical results. The failure modes obtained the best forced casting joint on the structural behavior at 50% height of casting in the beam.

A Research on the Greenhouse Gas Emission Reduction of Railway Structure Construction Stage (건설단계에서의 철도시설물 온실가스저감방안연구)

  • Lee, Cheul-Kyu;Kim, Jong-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.5
    • /
    • pp.425-432
    • /
    • 2011
  • Concrete was identified as the significant GHG emission source resulting from a GHG emission analysis of railway infrastructure. An environmental assessment method (life cycle assessment; LCA) and low carbon railway infrastructure design strategy development method (ECODESISGN PILOT) were applied to develop low carbon railway infrastructure design strategies. The railway infrastructure was analyzed as a raw material intensive industry emitting large amount of greenhouse gas (GHG) at its construction stage. Therefore, in this study, it is analyzed that current status of GHG emission at its construction stage, and a method reducing GHG emission of railway infrastructure is proposed. In this study, eco-concrete, concrete aging prevention agent and a low carbon railway route decision method based on a need of low carbon railway infrastructure construction technology application for green railway development were considered.