• 제목/요약/키워드: Construction Skill

Search Result 186, Processing Time 0.024 seconds

- The Review of the Collar Consideration of G go-ri to Improve Drafting Method - (제도법 개선을 위한 저고리 깃 구성의 재고찰)

  • 정옥임
    • Journal of the Korean Home Economics Association
    • /
    • v.34 no.4
    • /
    • pp.249-263
    • /
    • 1996
  • According to the design method for constructing the G gori(the traditional Korean jacket)collar, there are differences in form after its completion. In the construction design of the midsection of the gusset as in that of the basic G gori, not only was the positioning of the two sides of the collar not smooth, but also, when the collar strip was attached, there would be an imbalance on one side or the other so that it was difficult to achieve symetry. Therefore in this project, by applying the pattern design of the gusset midsection to that of the collar midsection, not only did attaching the collar and the collar strip create a visual effect by equalizing the lengths of the tow sides, but the construction was also easy. This method of construction introduces the three-dimensional aspect of the human form in its conic, spherical and cylindrical aspects, so that, through schematizing the scientific character of Korea's clothing, its appropriateness is verified. As a matter of fact, since th-ere in no standardization of pattern whether for educational use or for mass-produced clothing, so that even the patterns used in computer-assisted design are executed according to the designer's personal skill, the reality is that after completion of construction the quality has not been uniform. For this schematization, inverse calculation of measurements pertaining to the calculation formula and of teaching materials has been referenced. In particular, the partial requlation of the calculation formula pertaining to the basic pattern construction, the method of making the collar midsection, and the construction method of the extreme and mean ratio adjustment can be adjusted for all measurements, thereby providing the establishment of a design criterion and the possibility of the standardization of construction methods. The production method for the pattern design is as follows: 1) The conic angle for the G gori's girth, length and neck width is fixed at 70 degrees. 2) The radius of the cone is B/2. 3) The calculation formula is B/4 + 1.5cm 4) The armhole formula is B/4, the same as in the basic method. 5) The width formula is B/10. 6) The ratio of the collar junction(width of collar + width of collar strip)to the gusset length is 5:8. 7) The length of the side seam is a length intersecting the armhole line and the conic radius (B/2), that is an arc that exceeds the length of the G gori's midsection; the component ratio of this length to the collar junction is accordingly 13:5. 8) The curve frame length of the back midsection is an arc exceeding B/4(the armhole line). 9) The ratio of the sleeve opening calculation formula to the armhole length is 8:5, forming an arc with the midsection length.

  • PDF

The Study on the Construction Criteria and Dujabee Technique of the Construction of the Cheomseongdae (첨성대축조 규준방식과 드잡이기술에 대한 기술사적 접근 연구)

  • Kim, Derk Moon
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.4
    • /
    • pp.92-103
    • /
    • 2012
  • The Cheomsungdae was built in the Silla dynasty during the reign of queen Seondeok. It has a round cylindrical structure with a flowing curved fa ade. The identity of the Cheomsungdae has not been revealed since there is not much historical evidence or documents about the building. This study is trying to investigate the building technique and method from the technical point of view of the past when it was constructed. There have been much work and studies done for the Cheomsungdae, but not much were focusing on the technical aspects of the building. In addition there are many questions and doubts about the hypothesis of the building technique of Cheomsungdae since there aren't any remaining documents or historical evidence supporting it. Among many questions, we think that the discussion on falsework technique is not considering traditional construction method of the Dujabee (a traditional construction technique using various tools and equipment for the stability of the building) technique. Therefore, it is hard to identify them as reliable historical facts. As the result of the study, we want to provide the basic data on the construction techniques of Korean traditional architecture and broaden the study scope of technical history by narrowing the errors. The study could be summarized into three points. 1. The historical architecture Cheomseongdae was constructed by using traditional crane techniques such as a Noklo (pulley ladder). Cheomseongdae was re-evaluated as a high level technology for the history of architecture. 2. The benchmark method on Cheomseongdae construction has been applied with a precise scientific method based on the geometrical principals using the central axis. 3. In terms of the history of Korean traditional architecture technology, as there aren't many studies done we proposed various basic data for the traditional crane techniques and criteria of Korean traditional architecture technology. We could expect various and active studies for the technical approach of the history of architecture.

A Study on the Influence Factors of safety Management Activities of Safety Assistants on Dispatch Method (안전보조원의 안전관리활동이 파견법에 미치는 영향요인 연구)

  • Shin, Seung Ha;Moon, Yu Mi;Choi, Byong Jeong
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.2
    • /
    • pp.306-318
    • /
    • 2021
  • The dispatch law has a negative impact on safety management at construction sites as the command and command relationship to safety assistants of the original contractor are applied to the dispatch law. Purpose: The purpose is to study the importance and impact of safety management according to the dispatch law, and to propose a direction for safety management so that safety assistants can actively and proactively prevent accidents. In this study, we used AHP analysis techniques for experts to achieve the final goal and verified the suitability through logistic regression. Method: AHP analysis technique is used for experts and workers and logistic regression analysis is conducted. Result: The result of analyzing scenario data where the dispatch method can be applied showed the importance in the order of education (SkillUp education), management (work-time management) and direct instructions (feedback instruction). In logistic regression analysis, feedback is the factor that affects direct instruction, and in education management, the ratio of education management is 3.42 times lower than that of other groups when only the team leader of the company gives work instructions. Conclusion: The management of feedback and education is more important than anything else within the range in which the dispatch method is not applied, and the expansion of non-face-to-face online education is judged to avoid the violation of dispatch method because the expansion of non-face-to-face online education due to covid 19 recently has brought more various target for safety education.

Case Study for Telecommunication Network Design based on Optimal Path Algorithm (최적경로 알고리듬을 활용한 경제적인 통신망 설계 적용 사례)

  • Jung, Ju-Young;Choi, Yun-Soo;Jun, Chul-Min;Cho, Seong-Kil
    • Journal of Korea Spatial Information System Society
    • /
    • v.8 no.1 s.16
    • /
    • pp.107-118
    • /
    • 2006
  • In this paper, several network algorithms were tested to find an optimal one for telecommunication network design. Algorithms such as Dijkstra's shortest path algorithm, Ford-Bellman's shortest path algorithm, Prim's minimum spanning tree algorithm, and Kruscal's minimum spanning tree algorithm were reviewed and compared in terms of feasibility and resulted network construction cost. Then an optimal algorithm that is most suitable for telecommunication network design was selected. For more specific and quantitative analysis of the selected algorithm, it was implemented to a real telecommunication network construction site. The analyzed results showed that the suggested design method when compared with the conventional one, reduced the network construction cost considerably. The total network length estimated by the conventional method were 5267 meters while the suggested method resulted in 4807 meters. Thus the new method reduced the total network length by 8.7 percent which is equivalent to 97,469,000 Won of construction cost. Considering the frequent telecommunication network constructions, due to new urban developments in the nation, the economic benefit of the suggested telecommunication network design method will be significant. In addition to the construction cost savings, the suggested telecommunication network design procedure possesses several other economic benefits. Since the design procedure can be standardized and automatized, it can reduce the design cost itself and the skill acquirement periods required for new or inapt design crews. Further, due to the standardized and automatized design procedure, any telecommunication network design results can accessed more objectively.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

A Study on Comparison of Density Test Methods for Quality Control of Cement and Mineral Admixture (시멘트 및 혼화재의 품질관리를 위한 밀도 시험방법 비교 연구)

  • Jae-Seung, Lee;Sang-Kyun, Noh;Cheol, Park;Hong-Chul, Shin
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.435-442
    • /
    • 2022
  • In this study, the density of KS L 5110 was compared with that of gas pycnometer and electronic densimeter for efficient density management of cement, blast furnace slag powder and fly ash. Correlation and usability according to the test method were reviewed, and based on the results of the experiment, the availability of alternative test methods was analyzed. As a result of the density test according to test methods, the density of cement, blast furnace slag powder and fly ash tended to decrease in the order of gas pycnometer, KS L 5110 and electronic densimeter. Because the volume range of the sample to be evaluated is different depending on test methods. The coefficient of determination R2 was in the range of 0.71 to 0.93, and the correlation according to test methods showed a relatively good correlation. If correction is applied through correlation, it is analyzed that alternative test methods can be used. As a result of the usability review considering the test procedure, measurement time and coefficient of variation, the gas pycnometer had the simplest test procedure and good reliability. In addition, it is expected that the reproducibility between the testers is relatively high because the skill is not greatly required.

Development of an Automated Layout Robot for Building Structures (건축물 골조공사 먹매김 시공자동화 로봇 프로토타입 개발)

  • Park, Gyuseon;Kim, Taehoon;Lim, Hyunsu;Oh, Jhonghyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.689-700
    • /
    • 2022
  • Layout work for building structures requires high precision to construct structural elements in the correct location. However, the accuracy and precision of the layout position are affected by the worker's skill, and productivity can be reduced when there is information loss and error. To solve this problem, it is necessary to automate the overall layout operation and introduce information technology, and layout process automation using construction robots can be an effective means of doing this. This study develops a prototype of an automated layout robot for building structures and evaluates its basic performance. The developed robot is largely composed of driving, marking, sensing, and control units, and is designed to enable various driving methods, and movement and rotation of the marking unit in consideration of the environment on structural work. The driving and marking performance experiments showed satisfactory performance in terms of driving distance error and marking quality, while the need for improvement in terms of some driving methods and marking precision was confirmed. Based on the results of this study, we intend to continuously improve the robot's performance and establish an automation system for overall layout work process.

The Study on Elementary Male and Female Students' Abilities to Construct and Interpret Graphs Based on Their Spatial Abilities and Science Process Skills (초등학교 남.녀 학생들의 공간 능력 및 과학 탐구 능력에 따른 그래프 작성 및 해석 능력에 관한 연구)

  • Jeon, Bok-Hee;Lee, Hyeong Cheol
    • Journal of Korean Elementary Science Education
    • /
    • v.31 no.4
    • /
    • pp.490-500
    • /
    • 2012
  • This study was to examine elementary male and female students' spatial abilities, science process skills, and graph construction and interpretation abilities in order to understand the effect that their spatial abilities and science process skills would have on their graph abilities. To conduct this study, total 12 classes of 435 pupils, 6 classes each from grades 5 and 6 in elementary schools were selected for subjects. The number of male student was 207 and that of female one was 228 of them. And previous test papers of spatial abilities, of science process abilities, and of graph abilities were retouched and updated for reuse in new tests. The results of this study are briefed as follows: Firstly, when spatial abilities for male and female group were compared, female group showed a little higher rate of correct answering than male, but not providing statistically significant gap. Secondly, the science process skill tests revealed basic process skills of both groups were more excellent than their integrated process skills, while female group was found to have more correct answers than male, all of which were proving statistical distinction. Thirdly, of graphing skills for two groups, the graph interpretation skills turned out to be better than the graph construction skills, with female group scoring higher than male and with meaningful difference. Fourthly, both between spatial abilities and graph abilities, and between science process skills and graph abilities, static correlations existed with statistical meaning. In other words, those with higher spatial abilities or science process skills were to do better in constructing and interpreting graphs.

Development of Heating Technology for Greenhouse by Use of Ground Filtration Water Source Heat Pump (여과수열원 히트펌프를 이용한 온실난방기술 개발)

  • Moon, J.P.;Lee, S.H.;Kang, Y.K.;Lee, S.J.;Kim, K.W.
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.172.2-172.2
    • /
    • 2010
  • This study was carried out in order to reduce the installation expense of heating system for greenhouse comparing to geothermal heat pump and develope the coefficient of performance (COP) for a heat pump. For getting plenty of heat flux from geothermal energy. Surface water in river channel was used for getting a lots of geothermal heat by penetrating water through underground soil layer of the river bank that make heat transmission to passing water. The range of water temperature after the process of Ground filtration is 13~18 degrees celsius which is very similar to low heat source of geothermal heat pump system and the plenty amount of heat source from that make the number of geothermal heat exchanging hole and the expense for geothermal heat exchanger construction reduced. Drainage well is also used for returning filtration water to the aquifer that keep the water good recirculation from losing geothermal heat and water resource. For the COP improvement of Heat pump, thermal storage tank with separating insulation plate according to the temperature difference make the COP of Heat pump that is similar to thermal storage tank with diffuser. Developed thermal storage tank make construction expense cheaper than customarily used one's. and that sand filter and oxidation sand (FELOX) are going to be used for improving ground filtration water quality that make heat exchanger efficiency better. All above developed component skill are going to be set on the Ground filtration water source heat pump system and applied for medium, large scale for protected greenhouse in riverside area and on-site experiment is going to do for optimizing the heating system function and overcome the problem happening in the process of on-site application afterward.

  • PDF

A Study on Job Stress and Work Ability of Technical Workers and Simple Labor Workers in Apartment Construction (아파트공사 기능직 종사자와 단순노무 근로자의 직무스트레스와 작업능력에 관한 연구)

  • Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.129-135
    • /
    • 2014
  • In recent studies, construction industry workers with higher job stress and lower work ability were more likely to experience accidents at their workplace. Likewise, fatal accidents rate was higher among simple labor workers compared to technical workers. Therefore the evaluation of a worker's job stress and work ability seems to be important in preventing the occurrence of fatal accidents. To search for ways to reduce job stress and to improve work ability, the current study conducted a job stress analysis based on age, years of service, skill level, hobbies, sleep patterns, and monthly income. For this, the Korean occupational stress questionnaire short form and the Work Ability Index (WAI) developed by the Finnish Institute of Occupational Health (FIOH) were used. In this study, SPSS 12.0K statistics program was used for statistical analysis and significance was verified by the Kruskal-Wallis test and non-parametric tests. The results of this study can be summarized as follows : (1) Simple labor workers had higher job stress and less work ability than technical workers. (2) The more experienced workers had lower job stress and higher work ability. (3) In the case of workers who slept a lot, work ability was higher and job stress was less. (4) Monthly income influenced on the job stress and work ability. (5) Job stress and work ability in accordance with the age difference was not significant.