• Title/Summary/Keyword: Construction Site Quality Control

Search Result 150, Processing Time 0.033 seconds

A Survey for a Development Construction Materials' Construction Site Quality Control Guide (건설자재 현장품질관리 지침 개발을 위한 실태조사)

  • Ko, Eun-Joo;Ko, Eun-Jung;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.

  • PDF

A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete (투수콘크리트 현장품질관리 지침서 개발에 관한 연구)

  • Ko, Eun-Jung;Goh, Eun-Joo;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

An Experimental Study for Establishment of On-Site Quality Control of Repair Material by the mechanized construction (기계화시공에 의한 보수재료의 현장품질관리확립을 위한 실험적 연구)

  • Cho Bong Suk;Jang Jae Bong;Kim Yong Ro;Kang Suk Pyo;Hong Sung Yun;Kim Moo Han
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.160-163
    • /
    • 2004
  • In domestic, various repair materials and method systems to keep up with these reinforced concrete deteriorated due to salt damage, carbonation, chemical decay et. developed and applied. However, on-site quality control of various repair materials and method systems isn't achieved desirably because it is depend completely on a men of experience' opinions above all else regardless of various on-site environments. In this background, mock up test with due regard to real on-site environments was performed to secure fundamental data for establishment of desirable on-site quality control. Mock up test using repair mortar analyzed from angles of construction methods, mechanical spraying pressures, W/M. Construction methods were designed manpower method and spraying method, spraying pressures were designed 32, 42, 52 psi, W/M were designed 14.4, 15.4, $16.4\%$. And compressive strength, Chloride ion diffusion coefficient, bond strength, SEM. of mock up test specimens were evaluated. In conclusion, we confirmed excellency of mechanical spraying pressures, fined extremely excellency of condition of spraying pressure 42 ps, W/M $14.4\%$ within this study. therefore the results of this study will be useful to provide fundamental data for establishment of desirable on-site quality control.

  • PDF

A Study on the Application in Site of the Concrete Using Fly Ash Produced in Combined Heat Power Plant (열병합발전소 플라이애쉬를 사용한 콘크리트의 현장적용에 관한 연구)

  • 김무한;이상수
    • Journal of the Korea Concrete Institute
    • /
    • v.11 no.5
    • /
    • pp.41-49
    • /
    • 1999
  • This study dealt with the applicability and quality control of the concrete using fly ash produced in combined heat power in a construction site. Firstly, chemical and physical characteristics of the fly ash produced in combined heat power plant re analysed. Also, after investigating the properties of flesh and hardened concrete through various experiments, the fly ash concrete was placed in depositing construction in Ulsan Petrochemical Service Co. This field application was focussed on the quality control system in the site as production, placing and curing of concrete. As the result of this study, the quantity of CaO in the fly ash is relatively high based on the chemical analysis. The fly ash concrete showed slumping maintenance and high viscosity properties in the optimal mixing conditions (W/B:44~45%, S/a:$45\pm$2%, W:185kg/m). And, quality control and assurance of the fly ash concrete in actual site were verified by various testing methods.

Case Studies of EPS Failure and Quality Control by Site Monitoring (EPS 공법의 파괴사례 및 품질관리 개선방안)

  • 김호비;주태성;류기정;한태곤;김태경;정종권
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.401-408
    • /
    • 2003
  • EPS(Expanded Polystyrene) has been used in a variety of applications as a solution of difficult soil conditions encountered in construction activities. Although there has been significant worldwide growth in the use of EPS as a lightweight fill material, it has a few failure cases before and after the construction. This paper described the observed failures of EPS structures up In date around the world. Also, method of quality control was proposed for site monitoring.

  • PDF

Comparion of Korea-Japan Quality Standards for Grout Materials about PC Member assembly (PC부재 조립용 그라우트 재료 품질 기준의 한일 비교)

  • Kim, Yeon-Ho;Lee, Bum-Sik;Kim, Min-Jun;Kim, Ki-Ho;Jun, Myoung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.127-128
    • /
    • 2023
  • Recently, OSC (off-site construction) construction has been revitalized as a response to the decline in building quality and productivity due to lack of skilled manpower at construction sites, and PC (precast concrete) construction, a representative OSC construction, is insufficiently applied to public housing.This is the situation.In addition, in the case of general contents appearing in standard specifications, the construction standards for quality assurance remain in the 1990s and do not correspond to the current construction environment.In order to improve the quality of PC member joints, we compared and analyzed Korean and Japanese specifications to establish appropriate standards for PC construction quality control, focusing on the quality of grout used in joints.

  • PDF

An Application of the Super Flowing Concrete in Site (초유동 콘크리트의 현장시공)

  • 권영호;이상수;김동석;김진근;박칠림
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.04a
    • /
    • pp.402-407
    • /
    • 1996
  • In this paper, we described the basic elements(flowability, fillingability, elapsed time, pumpability, no-vibrating effects, and etc.) required for the application and quality control of the super flowing concrete (SFC) in construction site. Also, after investigating characteristics of SFC through various experiments, SFC were placed in the reaction wall of large scale structural laboratory in Deawoo Insititute of Construction Technology. As the result of this project, the developed SFC showed high flowability and self-filingability good enough for the requirement. Furthermore, quality control and assurance of the no-vibrating concrete in actual site was verified by various testing.

  • PDF

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

Improvement Model of Quality Management System of Construction Site Based on RESTful-API (RESTful-API 기반의 건설현장 품질관리 시스템 개선 모델)

  • Park, Koo-Rack
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.3
    • /
    • pp.61-66
    • /
    • 2020
  • Modern society is developing rapidly due to the convergence of industry and IT technology. In that case, the role of construction work that provides basic infrastructure can be very large. Recently, as construction work becomes more complicated, larger, and more advanced, the importance of management, such as system improvement for quality improvement, has become even more important. However, when a quality control problem occurs at a construction site, much time is required to solve the problem. In order for a construction project to be successful, various systems need to be organically connected and able to manage optimal decisions. In this paper, provide a quality control model using GCM push alarm service based on RESTful_API. The proposed model is a model that can be used by construction company quality control rooms and project managers for decision making. When applied to construction site project management, it is expected that more efficient and safe construction management will be possible.