• Title/Summary/Keyword: Construction Rate

Search Result 3,643, Processing Time 0.028 seconds

The Problem Analysis and Improvement of Technical Guidance On Construction Accident Prevention (건설재해예방 기술지도의 문제점 분석 및 개선방안)

  • Oh, Heui-Keun;Kim, Yong-Su
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.2
    • /
    • pp.19-27
    • /
    • 2016
  • Safety accident rate of small-medium construction site is high. because of lack of safety management system, lack of safety management capacity, lack of investment for safety, Owner's insufficient awareness about safety. In order to improve this, Currently in Occupational Safety and Health Act, Construction site of amounts more than 300 million won less than 120 billion (architectural),150 billion won(civil) mandatory subject to the technical guidance on construction accident prevention. Context of construction accident causes with construction accident rate relationship analysis and case analysis of technical guidance, through a survey of stakeholders in the technical guidance drawn the problems of the construction accident prevention technical guidance system and ways to improve on this.

The Study on the Fire Characteristic of Sandwich Panel by SBI(Single Burning Item) (SBI(Single Burning Item)을 이용한 샌드위치패널의 화재특성 연구)

  • Kim, Jung-Hyun;Kim, Heoung-Youl;Lim, Young-Soo;Lee, Seung-Han
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.04a
    • /
    • pp.493-500
    • /
    • 2010
  • 본 연구에서는 EN 13823 기준을 적용한 시험방법인 SBI(Single Burning Item)을 이용하여 스티로폼 샌드위치패널의 화재특성에 대한 실험을 실시하였다. 현재 국내에서는 샌드위치패널 화재특성 평가방법으로 ISO 5660-1(콘칼로리미터 시험방법)과 KS F 2271(난연성시험)이 사용되고 있지만 이러한 시험방법들은 시험 스케일과 시험편 및 가열조건의 한계점 등을 보이고 있다. 따라서 본 연구에서는 1세트를 3개로 하여 총 9개의 75mm 두께인 스티로폼 샌드위치 패널을 이용한 실험을 실시하였다. 이를 통해 공학적인 화재 물성 값인 FIGRA(FIre Growth RAte, kW/s), SMOGRA(SMOke Growth RAte, m2/s2)등을 측정하였다.

  • PDF

Research on construction safety assessment topic areas -Focusing on domestic construction site- (건설안전 분야 평가항목에 대한 연구 -국내 건설공사현장을 중심으로-)

  • Ahn, Kwang Yong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.1-12
    • /
    • 2015
  • Recent construction site large disaster occurs in, even normal disaster not be reduced, the efforts of pre-disaster prevention for this is also a need to study the evaluation index. By comprehensive examination zero reform the current lowest bid system has included the social responsibility index is scheduled, objective and quantitative evaluation indicators making construction safety areas that are included in the item of social responsibility is required ing. In this study, the construction, in order to prevent disasters, efforts pre disaster prevention be presented metrics in the construction safety in the field of comprehensive examination system and the evaluation index, it is intended to examine the evaluation items for the evaluation indices.

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

A Basic Study on the Analysis of Construction Accident Statistics Data (건설안전사고 통계데이터 분석에 관한 기초연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.122-123
    • /
    • 2018
  • Although the disaster rate of the industry as a whole is on a downward trend, the disaster rate of the construction industry is on an ongoing trend. Therefore, in this study, we analyzed safety accident statistical data of the construction site over the past three years. As a result of the analysis, the incidence of disasters at small construction sites was very high. And the proportion of disaster occurred for workers who worked in less than 6 months even roughly 92.6%. In addition, as a result of analyzing the form of disaster occurrence, the crash was 34.1% and the fall was 15.1%. The analysis results of these construction safety accidents are to provide as a basic material for developing a policy that can prevent safety accidents and a safety accident prediction model.

  • PDF

Measures to Reduce Industrial Accidents by Investigating them at Small Scale Construction Sites in Rural Area (농촌지역 소규모 건축공사 현장의 재해조사를 통한 저감방안 고찰)

  • Kim, Byung-Yun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.16 no.1
    • /
    • pp.95-102
    • /
    • 2014
  • The number of industrial accident victims in the construction industry accounts for 1/3 of those in the entire industries and about 30% of the total compensation costs are spent in the construction industry. As such, the construction industry is a typical industry causing numerous safety accidents. This study analyzes the status of industrial accidents in small scale construction sites to build maximum five-story buildings by examining statistical data for the past five years, investigating those construction sites and conducting interviews with the workers. This study also seeks the causes of and measures for industrial accidents in the small scale construction industry through comparison with relevant systems. The findings are as follows: (1) To reduce hazard rate, shaping the working environment and safety measures that take into account the physically weak classes of the middle aged and the aging are urgently required, because 62.9% of the industrial accidents in the construction industry occurred to those who are 50 years of age or older. (2) The hazard rate at small scale construction sites with less than 10 construction workers accounts for 55% of that of the entire industries. The government, in this context, needs to support finance or technology and improve system by selecting the small scale construction sites, where industrial accidents occur frequently. (3) Because the hazard rate of unskilled workers with less than 6 months of work experience accounts for 90.95% of the total, safety education needs to be concentrated on those unskilled workers. (4) The relevant standards need to be segmented and revised and bolstered, given that 64.79% of death disaster in the construction industry occurs in the temporary structures including scaffolds and ladders.

Prediction of the Constant Water Inflow Rate in a tunnel using Takahashi문s method (Takahashi의 수문학적 기법을 이용한 터널내의 항상 용수량의 예측)

  • Lim, Goo; Kim, Dal-Sun;Yoon, Ji-Sun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.181-188
    • /
    • 2002
  • Water flow rate into the tunnel usually determined by numerical analyses and mathematical formulas using water levels and permeability is obtained only a few limited districts of the whole tunneling site. However, underground is not a homogeneous but complicated mass. Therefore these methods can't reflect structural and geological aspects. In this study, assuming that the mountain stream in droughty season is to be the same as baseflow of its basin, hydrological method is applied to predict the constant water flow rate into the tunnel on construction field. Prediction of constant water inflow rate is performed on each section of tunnel construction field divided into 20 sections.

  • PDF

A Profit Prediction Model in the International Construction Market - focusing on Small and Medium Sized Construction Companies (CBR을 활용한 해외건설 수익성 예측 모델 개발 - 중소·중견기업을 중심으로 -)

  • Hwang, Geon Wook;Jang, woosik;Park, Chan-Young;Han, Seung-Heon;Kim, Jong Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.50-59
    • /
    • 2015
  • While the international construction industry for Korean companies have grown in market size exponentially in the recent years, the profit rate of small and medium sized construction companies (SMCCs) are incomparably lower than those of large construction companies. Furthermore, small and medium size companies, especially subcontractor, lacks the judgement of project involvement appropriateness, which leads to an unpredictable profit rate. Therefore, this research aims to create a profit rate prediction model for the international construction project focusing on SMCCs. First, the factors that influence the profit rate and the area of profit zone are defined by using a total of 8,637 projects since the year 1965. Seconds, an extensive literature review is conducted to derive 10 influencing factors. Multiple regression analysis and corresponding judgement technique are used to derive the weight of each factor. Third, cased based reasoning (CBR) methodology is applied to develop the model for profit rate analysis in the project participation review stage. Using 120 validation data set, the developed model showed 11% (14 data sets) of error rate for type 1 and type 2 error. In utilizing the result, project decision makers are able to make decision based on authentic results instead of intuitive based decisions. The model additionally give guidance to the Korean subcontractors when advancing into the international construction based on the model result that shows the profit distribution and checks in advance for the quality of the project to secure a sound profit in each project.

Evaluation Factors Influencing Construction Price Index in Fuzzy Uncertainty Environment

  • NGUYEN, Phong Thanh;HUYNH, Vy Dang Bich;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.195-200
    • /
    • 2021
  • In recent years, Vietnam's economic growth rate has been attributed to the growth of many well-managed industries within Southeast Asia. Among them is the civil construction industry. Construction projects typically take a long time to complete and require a huge budget. Many socio-economic variables and factors affect total construction project costs due to market fluctuations. In recent years, crucial socioeconomic development indicators of construction reached a fairly high growth rate. Also, most infrastructure and construction projects have a high degree of complexity and uncertainty. This makes it challenging to predict the accurate project price. These challenges raise the need to recognize significant factors that influence the construction price index of civil buildings in Vietnam, both micro and macro. Therefore, this paper presents critical factors that affect the construction price index using the fuzzy extent analysis process in an uncertain environment. This proposed quantitative model is expected to reflect the uncertainty in the process of evaluating and ranking the influencing factors of the construction price index in Vietnam. The research results would also allow project stakeholders to be more informed of the factors affecting the construction price index in the context of Vietnam's civil construction industry. They also enable construction contractors to estimate project costs and bid rates better, enhancing their project and risk management performance.

Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

  • Yoon, Seok J.;Lin, Hsing K.;Chen, Gang;Yi, Shinjea;Choi, Jeawook;Rui, Zhenhua
    • Safety and Health at Work
    • /
    • v.4 no.4
    • /
    • pp.201-209
    • /
    • 2013
  • Background: The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods: The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results: The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion: Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.