Kim, Hyo-Jin;Sohn, Jeong-Rak;Park, Seong-Sik;Yoon, Yung-Sang
Proceedings of the Korean Institute of Building Construction Conference
/
2007.04a
/
pp.113-118
/
2007
Now a performance process of Demolition works is 'Before-Removal & After-Classification' method in Korea. This method is short of demolition time, but construction wastes contained substances lower recycling rate of construction, raise expenses of reclamation & treatment. Then the government has decided upon a positive 'Before-Classification & After-Removal' method, and substantially raise a recycling rate of construction wastes. Therefore, this study makes an investigation into state of internal and external demolition field through evaluating technological level, we make a proposal of dismantling method from there. Also, we put dismantling to the test in an apartment by proposed work process. As the result, it made a term of works increased for removing interior material. To solve this problem, we need to develop tools and methods of construction that can remove efficiently. From now on, we continuously need to study a breakdown system of dismantling, analysis of dismantling process and general system by inspecting entire demolition process. And we have to study details for making a specific thesis of method of removing interior material which was based on developing a suitable partial demolition machine and dismantling works.
Korea reached an aging society in 2000, and it is progressed quickly now. Government forecasts that the number of aged people over 65 years old will increase from 7.2%(2000) to above 14.3% among total population in 2018. Workers over fifty years old are increasing in construction field every year. These aged workers are exposed to various construction accidents, and also their accident rate is very high because of physical and psychological changes by aging. Specially, a disaster of aged workers more than 50 years old is fronted at the serious situation in the construction industry which has variable working environment. Thus, the purpose of this study is to suggest the precaution by analysing disaster characteristics of aged construction workers. Also, this study aims to present a basic counter-plan according to important safety management list which is abstracted from the work, aged construction workers' accident rate is high.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.36
no.3
/
pp.135-145
/
2020
Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.11a
/
pp.135-136
/
2022
Defects caused by apartment houses have the term of warranty liability according to the enforcement ordinance of Acts of the Management of Apartment Houses. In case when defects occur during the term, free defect maintenance can be provided from the construction company. Yet, there occur conflicts between the construction company and residents, as to whether there occur defects or not. To resolve these conflicts, this study aimed to analyze construction classification and types that need managing, based on defects of apartment houses occurring during the term of warranty liability. This research analyzed 138,576 cases of data, as of five apartment house complexes. For the construction classification for defects of apartment houses, wooden flooring products accounted for the highest rate, followed by paper hanging, and wooden window. For the construction types of defects, torn/scratching took up with the highest rate, followed by the condition of defect in fixing and operating. In order to embody defects occurring during the term of warranty liability, into the visualization technique, this researcher utilized the word cloud method. This study will pursue the method for maintaining defects during the term of warranty liability, in the subsequent research, using the data that this research presented.
International conference on construction engineering and project management
/
2011.02a
/
pp.534-541
/
2011
Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.
Kim, Seok-Jong;Kim, Hyun-Woo;Chin, Kyung-Ho;Jang, Han-Ik
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.103-112
/
2013
After 1990s, the influence of construction industry has been decreased on national economy and construction business condition has been changed on economic recession and boom repeatedly. Larger fluctuation of business condition makes a forecast of it to be more difficult. Uncertainty in business prediction results in damages on construction companies and stakeholders. Therefore, study on forecasting a construction business is very important. This study suggests the Construction Industry Production Index(CIPI) to predict a construction business in consider of temperature effects. The results show that construction business is much influenced by temperature effects certainly and GDP. With the CBFM, this study examines CIPI for 2013 with two scenarios: 1)with GDP growth rate of 3.5% 2)with GDP growth rate of 2.4%. Thus, CIPI would be used as the economic state index to display the construction business conditions. Also, CIPI will be utilized as basic methodology in the impact of climate change in the construction industry.
Korean Journal of Construction Engineering and Management
/
v.20
no.3
/
pp.97-104
/
2019
The construction industry is heavily dependent on labor force as automation to building constructions is difficult due to its characteristics such on-site production, custom manufacturing production. Thus, while securing and fostering high-quality functional manpower for stable construction work are significant, the construction workforce has been persistently lacking compared to demand. Young workers are reluctant to enter the construction industry due to high labor intensity, unstable employment structure, and uncertainty for the future. The employment rate for new jobs in the construction industry is half as high as in others. Currently, the departments related to construction are organized in specialized high school to conduct training for young workers. The graduates have a low ratio of employment rate to the construction industry and functional capacities fallen short of expectations. In this study, the education and training conditions of specialized high schools were analyzed to derive problems and key improvements of the education system were drawn. As an improvement for the analysis results, it provides solutions such as giving advantages of previous education experience, expand industry-academic cooperation with businesses, and expand links with external educational institutions.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.347-348
/
2023
In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.
The Journal of Sustainable Design and Educational Environment Research
/
v.14
no.1
/
pp.1-9
/
2015
The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.
The Journal of the Convergence on Culture Technology
/
v.9
no.4
/
pp.473-478
/
2023
The construction business has a high accident rate among all the industries, and it accounts for 68% of the total accident rate for the small and medium-sized construction sites where a safety manager is not appointed,. Thus, through effective safety management and education of the construction sites, the accident rate can be significantly reduced. This study proposed a plan to improve the system suitable for small and medium-sized construction sites by integration with the basic safety & health education system. Through previous research and survey, the improvement points of special safety & health education at small and medium-sized construction sites, and the preference for integration with basic safety & health education were analyzed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.