• Title/Summary/Keyword: Construction Project Quality

Search Result 729, Processing Time 0.026 seconds

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

A Study for the Construction Conformity Assessment System According to the New Paradigm of Construction Management (건설관리 패러다임 전환에 따른 건설공사 품질관리 적합성평가 시스템 구축에 대한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.39-52
    • /
    • 2017
  • The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.

A PLANNING MODEL FOR APARTMENT DEVELOPMENT PROJECT REFLECTING CLIENT REQRUIREMENTS

  • Yoo-Shin Kim;Ye-Keun Oh;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.774-779
    • /
    • 2005
  • Client requirements is a concept with increasing interest in relation to several outcomes of companies, and in particular, in the event of apartment project that takes large share in the domestic construction industry, diverse angle of survey is performed to discover the client requirements and reflect them to the project to improve the quality. For this purpose, it is required to learn the client requirements and apply it in the apartment project, and the QFD (Quality Function Deployment) linked ROQ (Return On Quality) is a technique used in the manufacturing that surveys the client requirements to improve the customer satisfaction, and apply it to the quality improvement program to improve the profitability in this process. In this study, through the application of the ROQ process, the plan to improve the apartment quality management is presented. For this purpose, the consumer interview survey, FGI (focus group interview) survey and the client requirements are analyzed, and thereafter, through the interview with the specialist, the quality improvement program that enables the application to the product development of new apartment product is established. Through this process, the new apartment quality management improvement plan is presented.

  • PDF

Introduction On the Importance of Engineering Survey in Project Management

  • Meng, Yanlei;Chen, Guiming
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.260-262
    • /
    • 2017
  • During the construction of the project, all surveying and mapping work is collectively referred to as engineering survey. Therefore, the measurement work contains a wide range of content, in the engineering survey, design and construction management stage are involved. To the actual work, the project measurement runs through the project building in a number of stages, and provide basic services. This paper mainly through the analysis of engineering measurement at all stages of the role played by the measurement work in the project management work to do the following description.

  • PDF

THE CHECKLIST FOR ENVIRONMENTAL-FRIENDLY CONSTRUCTION PROJECT MANAGEMENT IN CONSTRUCTION PHASE

  • Oh, Kyung-Taek;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1522-1527
    • /
    • 2009
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment conservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. The purpose of this study is to propose checklist for environment management can be used in construction phase. For this, we went ahead with the research by studying the existing research related to environment-friendly construction project management both at home and abroad, investigation and analysis of environment-related laws and ordinances, and drawing the checklists for natural environment and living environment at the construction phase. As a result, we were able to compile a checklist for nine items including geological features, animals and plants, use of soil, quality of air, water, and soil, construction wastes, noise, vibration, recreation, and sceneries. The checklist is structured in 4 grades and coded so as to allow it to be developed with the use of computer system in future. We hope that the checklist presented in this study will help lead the managers at the construction phase in construction development sustainable from the perspective of environmental conservation.

  • PDF

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

IMPROVING CONSTRUCTION PROJECT DELIVERY THROUGH AUTOMATION AND ROBOTICS

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.237-241
    • /
    • 2009
  • Automation and robotic technology (ART) has been successfully applied in the manufacturing and allied industries to achieve on-time delivery of quality products at increasingly reduced costs. Meeting time, quality and cost targets still remains a big challenge in the global construction industry with prevalence of time and cost overruns. Application of ART in the construction industry could contribute to significant improvement in the efficient and effective delivery of projects to meet and exceed client expectations. However, the uptake of ART is still low in the construction industry. This study investigates the various ways in which ART could be applied to improve construction project delivery, potential areas of applications, and constraints to the uptake of the technology in the construction industry. Recommendations are made for improving the uptake of ART in the construction industry.

  • PDF

TAGUCHI OPTIMIZATION OF DISPLACEMENTS DURING THE DESIGN PHASE OF A CONSTRUCTION PROJECT

  • E.S. N. Telis;G. J. Besseris
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.721-728
    • /
    • 2007
  • The prediction of quality characteristics during the design phase of a construction project was fragmented, because no particular method exists. One of the most important key responses is the total displacements (horizontal and vertical). A brainstorming session produces the quality parameters i.e. the control factors which here are identified as: the steel joint, the pile's length, the excavation depth and angle, the distance between the piles, the anchor stretch and length to name just some of the most engaging in the design. The purpose of this study is to optimise these parameters to minimize the total displacements following a methodology based on Taguchi method. For this reason, a 2-level, L8 orthogonal array has been employed to organize the experimentation. Data is obtained from a real-life excavation project designed on the Plaxis v.8 CAE package. Taguchi analysis is performed in the statistical package Minitab.

  • PDF

Design Direction of a Big Data based Performance Monitoring System using Quality Function Deployment (QFD를 이용한 빅 데이터 기반 성과 모니터링 시스템의 설계방향 도출)

  • Kim, Chang-Won;Kim, Taehoon;Seo, Junghoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.255-256
    • /
    • 2021
  • The performance measurement of construction projects has traditionally been evaluated as a prerequisite for successful project completion. Considering this importance, the UK and the US are operating quantitative performance measurement systems for construction projects. However, in the case of Korea, there is a limit to the use of existing methods due to the limitation of data collection. Recently, in consideration of the domestic situation, research is being conducted to measure the quantitative performance of a project by using big data including progress and project attribute information. Therefore, this study aims to present the design direction of a performance monitoring system using Quality Function Deployment.

  • PDF

A Case Study of Asphalt Pavement Construction Quality Assurance Using the Quality Related Specification Software

  • Jeong, M. Myung;Jung, Younghan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.14-21
    • /
    • 2016
  • One of the major issues in the material-based or acceptance quality characteristics asphalt pavement Quality Assurance (QA) is that the method does not have rationality to link between the individual materials and the projected performance of the pavement. A new asphalt mix QA method has been recently developed under a national research project using the probabilistic Performance Related Specification (PRS). This advanced PRS QA methodology integrates the AASHTOWare Pavement ME Design$^{(R)}$ technology with the simple performance test concept that bridges the material characteristics with the pavement performance. This paper presents a case study of asphalt pavement performance using the developed PRS QA computer program, named Quality Related Specification Software (QRSS), with an actual pavement project, to demonstrate the developed PRS procedure and to assess the robustness of QRSS in terms of the rationality of the distress predictions. The results of this limited case study show that the new PRS QA method reasonably predicts the pavement performance, properly applied the probabilistic methods, and produced rational pay adjustment.