Development of an Eco-Value Engineering Support System

  • Sun-Im Kang;Jong-Hyeob Kim;Mi-A Jung;Chang-Taek Hyun;Sangwon Han
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.115-121
    • /
    • 2013
  • A number of urban renewal projects are currently being implemented around the world. Current project management tools are limited in effectively dealing with numerous issues regarding management of these projects (e.g., simultaneous execution of multiple projects). As an effort to address this deficiency, an Intelligent Program Management Information System (i-PgMIS) was developed for effective management of urban renewal projects. The i-PgMIS is a web-based system consisting of various modules including cost management, schedule management, risk management, change management, eco-value engineering (EVE) and so on. Based on the recognition of increasing awareness of creating sustainable built environment, this paper focuses on the EVE module that can support eco-value analysis at program-level management. The EVE module is expected to enhance value and sustainability of construction processes throughout the whole 'program' lifecycle and further to support program feasibility study based on life cycle costing.

  • PDF

현수교의 시공절차와 인위적 불확실성을 고려한 구조신뢰성 평가 (Structural Reliability Evaluation Considering Construction Stage and Epistemic Uncertainty of Suspension Bridges)

  • 한성호;신재철
    • 대한토목학회논문집
    • /
    • 제29권3A호
    • /
    • pp.181-188
    • /
    • 2009
  • 본 연구에서는 현수교의 합리적인 시공방안 결정 및 구조안전성 평가에 대한 기초자료를 제시하였다. 기 연구된 현수교의 해석모델 및 신뢰성이론을 바탕으로 초기형상해석, 자유진동해석, 시공변수를 고려한 시공단계해석 및 신뢰성해석 등을 수행 할 수 있는 수치해석프로그램을 개발하였다. 현수교의 시공방안은 보강형의 시공순서, 시공방향 및 주경간과 측경간의 동시 시공성 등의 다양한 시공변수를 고려하여 설정하였다. 시공방안에 따른 동적시공단계해석은 작성된 해석프로그램에 의해 수행하였으며 주요부재의 응답특성을 검토하여 각각의 시공방안에 대한 장 단점을 제시하였다. 시공단계별 구조신뢰성해석은 자연적 불확실성을 고려하여 신뢰성지수 및 파괴확률을 산정함으로써, 설정된 시공방안에 따른 현수교의 안전성을 정량적으로 평가하였다. 아울러, 인위적 불확실성을 고려하여 산정된 해석결과에 대해 재평가하였으며, 시공단계 위험성의 주요 퍼센트 분포를 빈도수 히스토그램을 이용하여 제시하였다.

프로그램 공정계획을 위한 주기적 버퍼 설치에 관한 고찰 (A Study on Periodic Buffer Allocation for Program Master Schedule)

  • 구교진
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.81-87
    • /
    • 2001
  • 동적 변화가 상존하는 건설환경에서, 보수·리모델링 프로그램의 관리자는 자원하의 복수 프로젝트를 조정·관리하는데 어려움을 겪게 된다. 프로그램에 내재하는 불확실성과 상호종속성으로 인해, 단위작업의 지연과 그로 인한 연쇄적인 공정계획의 동요는 프로그램 전체의 안정성과 관리가능성을 저해한다. 본 논문은 먼저 건설관리에 적용되었던 생산관리기법들이 프로그램관리에 적용될 수 있는가를 살펴본 후, 프로그램 내부의 자원유동의 흐름에 주기적으로 버퍼를 설치하는 공정 안정화 모델을 제안하고자 한다. 몬테-칼로 시뮬레이션에 의한 비교실험으로 제안된 버퍼 관리모델의 성능을 프로그램의 생산성, 유연성, 그리고 안정성의 관점에서 분석하였다.

  • PDF

건설프로그램 종결단계 업무프로세스의 상대적 중요도 분석 (An Analysis of the Relative Importance of Processes in the Closure Phase of Construction Program)

  • 이우연;이승훈;차용운;현창택
    • 한국건설관리학회논문집
    • /
    • 제21권4호
    • /
    • pp.62-71
    • /
    • 2020
  • 최근 건설시장의 환경변화에 따라 프로그램관리에 대한 다양한 연구가 시도되고 있으며 건설프로그램의 생애주기 각 단계 중 종결단계에 업무의 중요도는 증가되고 있다. 그러나 관련된 연구가 미진하고 현장에서는 개인의 역량에 따라 주먹구구식 관리해 온 것이 현실이다. 따라서 건설프로그램 종결단계에서 성공적인 건설프로그램 종결과 이해관계자의 만족도를 높이기 위하여 이해관계자들의 영향력과 관심도 매트릭스 분석기법으로 핵심 이해관계자를 규명하고 AHP분석기법을 활용하여 종결단계 프로세스에 대한 상대적 중요도를 분석하였다. 또한 제안한 종결단계 이해관계자의 중요도와 프로세스에 대한 상대적 중요도의 적정성에 대해 사례적용 및 면담을 통해 검증하였다. 본 연구에서 제안한 건설프로그램의 종결단계 높은 우선순위를 갖는 프로세스에 많은 자원을 투입하여 효과적으로 관리한다면 사용자 등 이해관계자의 만족도를 높이고 성공적인 종결에 기여할 것으로 기대된다.

외국인 작업자에 대한 기초안전보건교육의 문제점과 개선방안 (Problems and Improvement of Basic Safety and Health Training for Foreign Worker in Construction Sites)

  • 조영행;정철우;이재용
    • 한국건축시공학회지
    • /
    • 제21권2호
    • /
    • pp.175-180
    • /
    • 2021
  • 본 연구는 외국인들이 건설업에 종사하기 위해 가장 우선적으로 필요한 건설업 기초안전보건교육의 문제점과 해결방안을 제시하고자 하였다. 예비연구를 바탕으로 건설현장에 근무하는 안전관리감독자를 대상으로 설문조사를 실시하였다. 이 설문조사 결과를 바탕으로 외국인 건설 작업자에 대한 기초안전보건교육의 개선방안을 제시하였다. 이러한 개선방안은 외국인 작업자들의 안전의식을 높이고, 건설현장의 재해율을 감소시킬 수 있을 것으로 기대된다.

Incentives of Partnering Approach in the Construction Industry: Perceptions of Local and Foreign Sectors in the Vietnamese Market

  • Le-Hoai, Long;Lee, Young-Dai;Son, Jeong-Jul
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.147-155
    • /
    • 2010
  • Traditional procurement methods have revealed many disadvantages especially the adversarial relationship between parties. After several decades of application, partnering has shown that it is an innovative arrangement that help to reduce many problems having existed in traditional arrangement. It can provide a win-win working attitude in a construction project. Partnering in construction has been applied in several ways in recent years in Vietnam. This mechanism can help both local and foreign construction participants to mutually offset their differences when implementing projects. This paper has investigated and introduced the incentives of partnering from Vietnam perspective in terms of foreign and local participants perceptions. It has been shown that 'to learn mutually among participants' and 'to increase bidding advantages' are the most important incentives according to foreign and local practitioners respectively.

ANALYSIS OF THE PROCESS OF FABRICATION OF STEEL STRUCTURES USING AN AUTOMATIC CONSTRUCTION SYSTEM

  • Hak-Ju Lee;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1081-1087
    • /
    • 2009
  • An automatic construction system in Korea is now at the stage of the full automation like in Japan, and an actual pilot project is going to be built in 2009. However, in developing a new construction system that has never been implemented before, there is a need to assess the performance and to consider the uncertainty of the system. The program evaluation and review technique (PERT) allows dealing with this uncertainty. Thus, this paper implements an analysis of the process of steel fabrication and makes suggestions for time-related problems arising from the analysis. The time required for steel erection by the automatic system was compared with that in the traditional method. In the result, finding out another construction process and improving robot performance were proposed to resolve the problems. The results will contribute to promoting the development of an efficient system for the new automatic construction system.

  • PDF

대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 - (Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program -)

  • 이우연;이승훈;현창택;이상훈
    • 한국건설관리학회논문집
    • /
    • 제23권1호
    • /
    • pp.54-63
    • /
    • 2022
  • 본 연구는 대형 국책사업의 성공요인을 도출하기 위해 용산국가공원 조성사업에 참여하고 있는 전문가를 대상으로 설문을 조사하여 프로그램 정의단계 핵심성공요인을 분석하였다. 정의단계 용산공원 조성사업의 참여하고 있는 전문가를 대상으로 한 설문조사를 통해 각각의 범주에 대해 AHP분석을 수행하여 상대적 중요도를 파악하였다. 대형 국책사업 프로그램 정의단계 중요한 범주는 프로그램 전략, 프로세스, 사람들로 분류되었으며 범주간 중요도는 사람들, 전략, 프로세스 순으로 나타났다. 또한, 프로그램 정의단계 27개 핵심성공요인들 중에서 프로그램관리자의 역량과 리더십, 환경 및 문화재 조사 기획, 프로그램 관리 계획 준비, 운영 및 유지 철학, 통합된 프로그램 사무소 등이 우선순위가 높게 나타났다. 따라서 용산공원 조성사업을 추진함에 있어서 본 연구에서 제시한 프로그램 정의단계 중요도가 높은 핵심성공요인에 대한 선택과 집중 전략을 제안한다.