Development of an Eco-Value Engineering Support System

  • Sun-Im Kang;Jong-Hyeob Kim;Mi-A Jung;Chang-Taek Hyun;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.115-121
    • /
    • 2013
  • A number of urban renewal projects are currently being implemented around the world. Current project management tools are limited in effectively dealing with numerous issues regarding management of these projects (e.g., simultaneous execution of multiple projects). As an effort to address this deficiency, an Intelligent Program Management Information System (i-PgMIS) was developed for effective management of urban renewal projects. The i-PgMIS is a web-based system consisting of various modules including cost management, schedule management, risk management, change management, eco-value engineering (EVE) and so on. Based on the recognition of increasing awareness of creating sustainable built environment, this paper focuses on the EVE module that can support eco-value analysis at program-level management. The EVE module is expected to enhance value and sustainability of construction processes throughout the whole 'program' lifecycle and further to support program feasibility study based on life cycle costing.

  • PDF

Structural Reliability Evaluation Considering Construction Stage and Epistemic Uncertainty of Suspension Bridges (현수교의 시공절차와 인위적 불확실성을 고려한 구조신뢰성 평가)

  • Han, Sung Ho;Shin, Jae Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.181-188
    • /
    • 2009
  • This study presented the basic data for determining reasonable construction method and evaluating the structural safety of suspension bridges. The analytical program was developed to conduct initial shape and natural frequency analysis, construction stage analysis and reliability analysis considering construction sequences. This program was based on analysis models of suspension bridges and reliability theories used in the previous study. A construction method was established considering various construction variables such as construction order and construction direction of girder and synchronized construction of main and side span etc. The dynamic construction analysis by a construction scheme was conducted with the developed program. Benefits of the characteristic analysis by the construction scheme was presented estimating structural response of critical members respectively. Structural reliability analysis by construction stage was conducted considering aleatory uncertainties. The safety of suspension bridges by established construction method was quantitatively estimated using reliability index and failure probability. Analytical results were re-estimated considering epistemic uncertainties, and critical percentile distributions of risk at the construction stage were presented using the frequency histogram.

A Study on Periodic Buffer Allocation for Program Master Schedule (프로그램 공정계획을 위한 주기적 버퍼 설치에 관한 고찰)

  • Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.81-87
    • /
    • 2001
  • In a dynamically changing environment, the manager of a maintenance and remodeling (M/R) program is confronted with an increasing complexity of coordinating and cooperating multi-resource constrained multiple projects. The root causes of the complexity, uncertainty and interdependence, cause an internal disruption of an activity and chain reactions of disturbance propagation that deteriorate the stability and manageability of the program. This paper evaluates previous endeavors to apply production control and management techniques to the construction industry, and investigates the possibility of applying other management concepts and theories to organizational program management. In particular, this paper proposes a buffer allocation model by which periodic buffers are allocated in the flows of program constraint resources to stabilize a program master schedule instead of protecting individual activities. Comparative experiments by Monte Carlo simulations illustrate improved performance of the proposed model in terms of program's goals: productivity, flexibility, and long-term stability.

  • PDF

An Analysis of the Relative Importance of Processes in the Closure Phase of Construction Program (건설프로그램 종결단계 업무프로세스의 상대적 중요도 분석)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Cha, Yongwoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.62-71
    • /
    • 2020
  • Various studies on program management have been attempted due to recent changes in the environment of the construction market, and the importance of closure phase in each phase of the construction program is increasing. However, the reality is that the related research is insufficient and the field has been managed in a rule of thumb according to individual capabilities. Therefore, in order to successfully close the construction program and enhance satisfaction of stakeholders in the closure phase of the construction program, the key stakeholders were identified using the Power and Interest Matrix. The relative importance of the closure phase process was analyzed using AHP analysis method. It was also verified through on-site surveys and interviews about the proposed importance of the closure stakeholder and the relative importance of the process. It is expected that this study will increase the satisfaction of stakeholders and contribute to a successful closure if the user puts a lot of resources into the process that has a high priority in the closure phase of the construction program proposed in this study.

Problems and Improvement of Basic Safety and Health Training for Foreign Worker in Construction Sites (외국인 작업자에 대한 기초안전보건교육의 문제점과 개선방안)

  • Cho, Young-Hang;Chung, Chul-Woo;Lee, Jae-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.175-180
    • /
    • 2021
  • Recently, there are lacks of construction workers, and such vacancy has been continuously increased in many construction sites. Foreign workers have been hired to fill such vacancy, but increasingly high demands for construction workers made construction companies to hire foreign workers who did not properly pass the health and safety education program. In this work, problems associated with the basic education program for occupational safety and health training, which is the first mandatory requirement for foreign workers, were evaluated to suggest applicable solutions for this program. Literature reviews and preliminary investigations were performed, and a questionnaire survey was conducted for practitioners who were in charge of safety management in various construction sites. Results from survey were analyzed to derive proper methods for improvement on basic education on occupational safety and health training program. It is believed that suggested solution from this work can make foreign workers to be more conscious about health and safety issues, so that it will eventually decrease the accident rate in construction sites.

Incentives of Partnering Approach in the Construction Industry: Perceptions of Local and Foreign Sectors in the Vietnamese Market

  • Le-Hoai, Long;Lee, Young-Dai;Son, Jeong-Jul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.147-155
    • /
    • 2010
  • Traditional procurement methods have revealed many disadvantages especially the adversarial relationship between parties. After several decades of application, partnering has shown that it is an innovative arrangement that help to reduce many problems having existed in traditional arrangement. It can provide a win-win working attitude in a construction project. Partnering in construction has been applied in several ways in recent years in Vietnam. This mechanism can help both local and foreign construction participants to mutually offset their differences when implementing projects. This paper has investigated and introduced the incentives of partnering from Vietnam perspective in terms of foreign and local participants perceptions. It has been shown that 'to learn mutually among participants' and 'to increase bidding advantages' are the most important incentives according to foreign and local practitioners respectively.

ANALYSIS OF THE PROCESS OF FABRICATION OF STEEL STRUCTURES USING AN AUTOMATIC CONSTRUCTION SYSTEM

  • Hak-Ju Lee;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1081-1087
    • /
    • 2009
  • An automatic construction system in Korea is now at the stage of the full automation like in Japan, and an actual pilot project is going to be built in 2009. However, in developing a new construction system that has never been implemented before, there is a need to assess the performance and to consider the uncertainty of the system. The program evaluation and review technique (PERT) allows dealing with this uncertainty. Thus, this paper implements an analysis of the process of steel fabrication and makes suggestions for time-related problems arising from the analysis. The time required for steel erection by the automatic system was compared with that in the traditional method. In the result, finding out another construction process and improving robot performance were proposed to resolve the problems. The results will contribute to promoting the development of an efficient system for the new automatic construction system.

  • PDF

Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program - (대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 -)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Hyun, Chang-Taek;Lee, SangHoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.54-63
    • /
    • 2022
  • In order to derive the success factors of a Mega-scale national project, this study conducted a questionnaire survey on experts participating in the Yongsan National Park development program to obtain critical success factors in the program definition phase. AHP analysis was performed for each category through a survey of experts participating in the definition phase of the Yongsan park development program to derive relative importance. The categories were classified into program strategy, process, and people, and the importance between categories was people, strategy, and process in that order. In addition, as for the 27 critical success factors in the program definition phase, the program manager's competency and leadership, environmental and cultural property survey planning, program management plan preparation, operation and maintenance philosophy, and integrated program office showed high priorities. Therefore, in promoting the Yongsan Park development program, we propose a strategy for selecting and focusing on the critical success factors with high priorities in the program definition phase proposed in this study.