• Title/Summary/Keyword: Construction Process

Search Result 7,158, Processing Time 0.031 seconds

Economic Benefits of An Application of Construction Debris Units in Housing Environment Amelioration Area (주거환경개선지구 건축물해체 시 발생원단위 적용의 경제성 효과)

  • Hwang, Hyun-Seung;Son, Byeung-Hun;Park, Sang-Min;Hong, Won-Hwa
    • Journal of the Korean housing association
    • /
    • v.20 no.3
    • /
    • pp.77-84
    • /
    • 2009
  • The construction debris has been enormously increased since 90's because of a reconstruction and developing a new building site. Under the construction law, construction debris must legally recycle or reclaim at cost, but almost people have depended on reclamation of the illegal process to treat construction debris. Therefore, the environmental disruption and contamination have been begun the hot issue of society and in controversy with residents. With the consequence that indicates a substitute about an application of construction debris units is the most important thing for studying construction debris of quantity when the construction units are demolished. Nowadays, the area under the housing environment amelioration policies is getting rapidly old, then it is beyond anticipating reconstruction. Before construction units are demolished, generally three of four engineers investigate or predict the quantity of construction debris for two months. But this study is using the units of construction debris instead of the investigation and gets more precise data than investigation or prediction. In conclusion, the purpose of this study offers that units of construction debris can alternate the investigating of construction debris and curtail the expenses of labors and finances. Finally, those effects are going to make economical benefits covering the whole of the process of constructions.

A study of IDEF modelling on the construction project (건설사업에 IDEF 모형화에 관한 연구)

  • 권오룡;염준근
    • Proceedings of the CALSEC Conference
    • /
    • 1997.11a
    • /
    • pp.269-286
    • /
    • 1997
  • This paper presents the results of analysis for the Flexible Computer Integrated construction(FCIC) system to adapt CALS on the construction industry- Acquisition and supply process of the system are represented by IDEF0 function models and FCIC information systems are briefly described in this paper. The model presented here used as a reference for the development of CALS system.

  • PDF

A Study of CM(Construction Management) application method for exhibition facilities. (전시시설 건립을 위한 CM 적용방법에 관한 연구)

  • 문종승;임채진
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.39-44
    • /
    • 2001
  • An instance of domestic exhibition facility building case, the shortage of managing personal in construction resulted serious issue on expenses, times, quality, and safty with no satisfaction on its process and result. According to subject's speciality the CM's application methods are varied and because of its speciality, overall process of building an exhibition facility operating by its owner. This study intends to exam a application possibility of CM on exhibition facility construction to make smooth communication among varied area that following to exhibition facility construction.

  • PDF

A Study on Developing the System for Supporting Mobile-based Work Process in Construction Site (모바일 기반의 건설현장 업무처리 지원시스템 개발 연구)

  • Kim, Seong Jin;Kim, Tae Hak;Ok, Hyun
    • Smart Media Journal
    • /
    • v.6 no.4
    • /
    • pp.50-57
    • /
    • 2017
  • As the construction sites are far from the construction site offices, the construction workers perform work on the sites with a variety of reference books and materials. This inconvenience may lead to construction accidents, and as such, the demand for mobile app development for simplifying work is increasing. Therefore, in this study, the trends of mobile research and mobile app development, and their application to the construction field were investigated to develop a mobile app that would help construction workers process their work. Based on this, mobile services applicable to construction sites and work process improvement plans were proposed. To apply the proposed work process, the functions of the existing construction project management system were improved, and a mobile app that could be used in both the Android and iOS environments was developed.

An Approach on Life Cycle Based Efficiency Measurement in Construction Industry (건설 생산의 Life Cycle을 고려한 효율성 측정방안)

  • Jung Soon-Oh;Yoon Su-Won;Chin Sangyoon;Kim Yea-Sang;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.608-611
    • /
    • 2004
  • Efficiency of the construction process is one of the most important factors to project success. However efficiency is not well defined or measured in construction projects in general. More importantly, efficiency of the construction should be viewed through the life-cycle of the whole production system not in a single phase of the construction process. Therefore, this study defines the concept of efficiency and suggests the efficiency measurement model in construction. As a case study, the suggested model was applied to the curtain wall construction process of the high rise buildings as well.

  • PDF

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

Personalization of Use and Unit Construction System Design (사용의 개인화와 단위구성 시스템 디자인)

  • 이병종
    • Archives of design research
    • /
    • v.16 no.2
    • /
    • pp.111-120
    • /
    • 2003
  • This paper shows a study on a design method and its process for personalization of the industrial fabricated products, and a unit construction system design as its result. Hence this study is starting at a point, the meaning of the personalization in the industrial society to make dear, the using process to analysis with a systematic approaching method and the system of the using process to define. The system of the using process is related in the functions of the industrial product. Therefore a unit which makes up the system of the using process is defined with the technical system theory of the industrial product, and then a design of the system that is made of that units is clarified as a open system. And the propriety and the boundary of the unit construction system design is cleared up by its practical experiment with the personal computer.

  • PDF

A Study of Improving Construction Process by Work Structuring (Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구)

  • Na Kyung-Chul;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-427
    • /
    • 2001
  • There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.

  • PDF

Business Process Evaluation and Case Study for Sequential Application of BPM

  • Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.36-44
    • /
    • 2012
  • Adoption and practical application of BPM yet remains at a theoretic and methodological level for many industrial sectors. As for construction industry, adapting BPM into enterprise resource across all business processes could cause problems due to rapid change in corporate operation systems. Furthermore, it is unable to predict potential risks of business process while BPM are being applied. Therefore, applying BPM model to core strategy and individual task seems more effective than applying BPM model to the entire enterprise resource planning. In this paper, we define BPM and suggest a BPM model by analyzing each business unit in order to evaluate each business unit which is included in the business process architecture based on quantitative standards. This paper also presents a sequential application plan for business process model. Finally, a case study is demonstrated for the application of BPM system, focusing on cost management business, which turned out to be a top priority in the aspect of efficiency and ease based on priority analysis.