• Title/Summary/Keyword: Construction Process

Search Result 7,158, Processing Time 0.034 seconds

A Study of Technical Standard Making from Governance Perspective: The Case of Master Spec. in Electrical Construction (기술 표준 제정과 거버넌스 접근법: 전기공사 마스터 스펙 사례)

  • Cho, Hyun-Suk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.5
    • /
    • pp.770-776
    • /
    • 2012
  • For a few recent years, KECA(Korea Electrical Contractor Association) has promoted a project to establish an electrical construction specification called Master Spec. This paper analyses the characteristics of standards-making process of the Master Spec. as an umbrella technical standard in electrical construction industry in Korea. This paper argues that even if the Master Spec. is recognized to be technical standards, the standards-making process involves both technical and social practices when viewed from social construction theory and governance perspective. This aspect of social practices in technical standards making should be well understood because various stakeholders in terms of interests, resources, and motives try to influence the process positively and negatively. KECA in responsible for enactment of the Mater Spec. should be very thoughtful in building consensus first of all among electrical contractors, managing relationship with concerned government officials, and dealing with potential deviant groups as well as in pooling expertises and developing technical knowledge needed for designing technical specification.

Functional Analysis for P-C-M support System Design in Agricultural Facilities (농촌시설물 P-C-M Support System 범위를 위한 기능 분석)

  • Gim, Mi-Gyeong;Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee;Kim, Jun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.127-130
    • /
    • 2009
  • Recently agricultural productivity innovation projects are increasing all over the farming countries. To reform and improve the productivity of agricultural industry is important factors. This research is to do the functional Analysis for P-C-M support System Design in Agricultural Facilities. By analyzing the for P-C-M support System modules in the agricultural construction process, P-C-M support System factors are derived and defined. The result of this study would widely be used as a fundamental research guide to develop the agricultural P-C-M support System in the agricultural construction process.

  • PDF

Augmented Reality Framework for Efficient Access to Schedule Information on Construction Sites (증강현실 기술을 통한 건설 현장에서의 공정 정보 활용도 제고 방안)

  • Lee, Yong-Ju;Kim, Jin-Young;Pham, Hung;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.60-69
    • /
    • 2020
  • Allowing on-site workers to access information of the construction process can enable task control, data integration, material and resource control. However, in the current practice of the construction industry, the existing methods and scope is quite limited, leading to inefficient management during the construction process. In this research, by adopting cutting edge technologies such as Augmented Reality(AR), digital twins, deep learning and computer vision with wearable AR devices, the authors proposed an AR visualization framework made of virtual components to help on-site workers to obtain information of the construction process with ease of use. Also, this paper investigates wearable AR devices and object detection algorithms, which are critical factors in the proposed framework, to test their suitability.

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

Can you predict the production performance using the make-ready performance?: Cases on highway construction projects

  • Yong-Woo Kim;Jinwoo Jang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.914-919
    • /
    • 2009
  • The research investigates for the relationship between the operating performances of the make-ready process and project production performance. To this end, the researchers proposed a metric of PCR (Percentage of Constraint Removal) to measure the make-ready performance. The study measured the production performance in two ways: production planning reliability and progress performance. We hypothesized that how well the make-ready process is performed has an impact on the degree of production performance. The statistical analyses are used to investigate that how operating performance of the make-ready process affects project production performance. The results of the regression analysis support our hypotheses (p<0.25) and correlation coefficients for the relationship between project production performance and make-ready performance are also significant (p<0.05).

  • PDF

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

Development of the Quality Management Software of Spatial Database (공간데이터베이스 품질유지관리 소프트웨어 개발)

  • 최병길;조광희
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.285-290
    • /
    • 2003
  • This study is aimed at standardizing the process of spatial database construction and developing a software tool for process management. Knowhow of five GIS firms and provisions of NGI(National Geography Institute) were analyzed. In this study, the process of spatial database construction was standardize. The system from this study has the capability to manage the process of construction database using GIS and to deal with the metadata of unit map, generated from the process, systematically and continuously The process was also shown by using either Gantt chart or PERT chart after developing an interface for "MS Project". A software "Visual Basic for Application" was used for this study.

  • PDF

ROLES AND RELATIONSHIPS BETWEEN ARCHITECTS AND CONTRACTORS BASED ON CONTRACTOR-DESIGNER ISSUE IN JAPAN

  • Sayaka Nishino;Shin Takamatsu;Shuzo Furusaka
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.758-763
    • /
    • 2009
  • In Japan, it has been argued between architects and contractors that which process is desirable, the traditional process or the design-build process. It is called the contractor-designer issue. In 1968, Kajima Corporation chairman Morinosuke Kajima and the Japan Architects Association had a public controversy over it. On the other hand, in practice, architects and contractors have secured quality of buildings thorough a close communication in the design and construction process of building. What are the relationships between architects and contractors? What roles do architects and contractors have in practice? This study has two aims. First one is to analyze the contractor-designer issue based on roles and relationships between architects and contractors, and then to show conflicts between them. Second one is to consider issues which architects face in the relationships with contractors.

  • PDF

A Study on the Theory and its Case Study of Production Design - Focused on the Japanese Construction Projects - (생산설계의 이론과 적용 사례연구 -일본의 건축공사 프로젝트를 대상으로-)

  • Kim, Jin-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.89-101
    • /
    • 2005
  • The early phase of construction projects, communication among the related participants has great influence on the further transaction of the projects. However, important decision making are made by the experience of the field managers in practice without the method for systematic analysis. For example, in building construction project, selection process for construction method has been executed by decision making of some architects dependent on their experience. As a result, there have been frequent construction method alterations during the construction process and delay of duration, addition of cost, etc have followed accordingly. The main reasons of such a mal-functional transaction are due to the absent of the reasonal procedure of decision making reflecting the characteristics of construction project. Therefore, there is a need for an supporting tool and production design for the selection of rational construction method. The objective of this study is to propose production design process and decision making model in relation to various influent factors at the early phase of construction projects. To achieve these objectives, this study 1)analyzes the prior theory about production design, 2)we have studied about selection process for optimal construction method through constraint analysis in structural works, 3)performs a case study to embody the problems of the production design, and 4)proposes a cooperative committee model for supporting production design by analyzing the results of case study and interviewing experts. It is anticipated that the effective tool of proposed model would be able to improve communication among the related participants and systematically accumulate data that might be used in similar construction projects.

Alternative Evaluation Method of GFI-based Construction Value Engineering (GFI를 활용한 건설공사 시공VE 대안평가 방법)

  • Kim, Sooyong;Lee, Youngrok;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.3-10
    • /
    • 2015
  • Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.