• Title/Summary/Keyword: Construction Practice Information

Search Result 216, Processing Time 0.032 seconds

A study on the Research & Analysis of the Health and safety Managing's Understanding for practical Application of Construction Industry Risk Assessment - Focus on worker - (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choe, Su-Hwan;O, Tae-Geun;Lee, Yeon-Su;Lee, Jin-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.445-456
    • /
    • 2013
  • According to Department of labor guideline "2012-104 (2012.9.26.)" This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.

  • PDF

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

Smart Divide and the Paradigm Shift of Social Capital

  • Lee, Seungmin
    • Journal of Information Science Theory and Practice
    • /
    • v.9 no.3
    • /
    • pp.1-13
    • /
    • 2021
  • In the current smart device-based information environment, information utilization is closely related to social capital. Additionally, the smart divide that occurs owing to the differences in use of smart devices has a significant influence on social capital. In this respect, this research empirically analyzed how the smart divide affects social capital construction. The study found that the level of and proficiency in using smart devices and diversity of the information formats used through smart devices affect social capital construction. Further, people who fully utilize smart devices can enhance their participation in social activities, social networks, and reciprocal activities, leading people to construct social capital in a wider range. Contrarily, those who are unable to use smart devices adequately may be disadvantaged in terms of the opportunity to construct social capital and share public interests. Thus, to maximize the intrinsic value of social capital, it is necessary to consider the factors of the smart divide as a complicated and multi-faceted digital divide and the ways to utilize social capital as a driving force for integrating society, and not as a mechanism for dividing members of society.

Potential of an Interactive Metaverse Platform for Safety Education in Construction

  • Yoo, Taehan;Lee, Dongmin;Yang, Jaehoon;Kim, Dohyung;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.516-524
    • /
    • 2022
  • The construction industry is considered the most hazardous industry globally. Therefore, safety education is crucial for raising the safety awareness of construction workers working at construction sites and creating a safe working environment. However, the current safety education method and tools cannot provide trainees with realistic and practical experiences that might help better safety awareness in practice. A metaverse, a real-time network of 3D virtual worlds focused on social connection, was created for more interactive communication, collaboration, and coordination between users. Several previous studies have noted that the metaverse has excellent potential for improved safety education performance, but its required functions and practical applications have not been thoroughly researched. In order to fill the research gap, this paper reviewed the potential benefits of a metaverse based on the current research and suggested its application for safety education purposes. This paper scrutinized the metaverse's key functions, particularly its information and knowledge sharing function and reality capture function. Then, the authors created a metaverse prototype based on the two key functions described above. The main contribution of this paper is reviewing the potential benefits of a metaverse for safety education. A realistic and feasible metaverse platform should be developed in future studies, and its impact on safety education should be quantitatively verified.

  • PDF

EXPLORING THE KEY FACTORS FOR BIM ACCEPTANCE IN CONSTRUCTION ORGANIZATIONS

  • Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.14-20
    • /
    • 2013
  • Substantial research has been performed on the data standards and exchanges in the AEC/FM industry over the past several years. The growing popularity of BIM technology is based heavily upon a perception that the technology can facilitate the sharing and reuse of information during a project life-cycle. Although many researchers and practitioners are in agreement about the potential applicability and benefit of BIM in construction, it is still unclear why BIM is adopted, and what factors enhance implementation of BIM. Thus, BIM acceptance and use remains a central concern of BIM research and practice. Therefore, we propose the key factors affecting the acceptance of BIM in construction organizations using factor analysis. The key factors for BIM acceptance are identified through a literature review in TAM (Davis 1989) and related theories, and consolidated by interviews and pilot studies with professionals in construction industry. Based on the factors, a questionnaire was designed and sent out to construction organizations such as contractors, architects, and engineers in Korea. Total 148 completed questionnaires were retrieved. Using factor analysis, key factors were grouped into six dimensions. These findings will clarify what the highly prioritized factors are, and can also be used in an assessment tool for the performance of BIM utilization.

  • PDF

A Study on the Standard of CAD Drawing in the Water Resources Parts to Support Construction CALS/EC (건설CALS/EC 지원을 위한 수자원 분야 전자도면 표준체계에 관한 연구)

  • Kang, Young Mi;Kang, Joon Mook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.553-560
    • /
    • 2008
  • As it was developed to korea standard of the CAD Drawing in Construction CALS/EC for the productivity Improvement in Construction Industry and efficiency rising of construction management. it is high time to design the standard system in water resources. The purpose of this study is to establish the strategies for standard system of drawing information in water Resources parts for construction CALS/EC. This study is to analyse the existing construction drawing standards including CMS, CMMS, drawing guideline of a water Resources public institution, ISO, US National CAD Standard, Japanese Standard. As a result of the analysis, this study proposes the prime structure of the water Resources drawing information standard to support construction CALS/EC. For the establishment of standard system in real practice, this study establishes the numbering system to joint the current standard system for a water Resources order institution and to keep construction CALS/EC. In conclusion, the standard system of drawing information is proposed as a fundamental frame to water Resources parts of construction CALS/EC.

The Study on the Standards of Thesaurus Construction Based on ISO 25964 (ISO 25964를 통해 살펴본 시소러스 구축 표준에 관한 연구)

  • Park, Ok-Nam
    • Journal of Information Management
    • /
    • v.42 no.2
    • /
    • pp.43-65
    • /
    • 2011
  • Despite a long tradition and rich discussion of thesaurus construction, more research is needed to make standards for thesaurus construction applicable to practice. Recently, in order to reflect changing information technology environment, and provide consistency of terms and abbreviations of standards, ISO committee has been planning to publish ISO 25964. Therefore, the study introduces ISO 25964, reveals main focal points of ISO 25964, and finally discusses suggestions to improve ISO 25964. The study employs qualitative content analysis of ISO 25964, ISO 2788: 1986, and ANSI/NISO Z39.19 - 2005.

INTEROPERABILITY ISSUES IN CROSS-DISCIPLINARY COLLABORATIONS OF IRREGULARLY SHAPED BUILDINGS: THE CASE OF DONGDAEMUN DESIGN PLAZA AND PARK

  • Ohyoon Kwon;Ghang Lee;Seonwoo Kim;Yunah Sin;Jeashik Hwang;Kabsu Chae
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.331-337
    • /
    • 2009
  • This paper summarizes some of approaches that could be taken for data exchange in a non-interoperable work environment and reports lessons learned from the Dongdaemun Design Plaza and Park project. Today's widespread application of building information modeling (BIM) to the construction and architectural design industries requires a change in the cooperation between business organizations and their methods of communication. In particular, the interoperability of information between interdisciplinary organizations, which use specific programs for different purposes, has become a critical issue. More than just a technical problem, it is also highly related to an organization's collaboration culture and the particulars of a specific project. This paper describes the interoperability issue that occurred during the construction documentation phase of the irregularly shaped building project, Dongdaemun Design Plaza and Park, designed by Zaha Hadid Architects and Samoo Architects and Engineers, from the perspective of the technological problem and the collaborative organizations' communications. Although the perfect compatibility of information is not possible, this paper deals with a practical approach to the interoperability issue by examining the way the end-users of computer-aided design (CAD) resolved the interoperability problems in practice.

  • PDF