• Title/Summary/Keyword: Construction Post-evaluation System

Search Result 72, Processing Time 0.029 seconds

The Concurrent Processing Methodology of BPR and Information System Building (BPR과 정보시스템 구축을 동시 병행 수행하는 방법론)

  • Han, Kwang-Shin;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.20 no.7
    • /
    • pp.1073-1089
    • /
    • 2017
  • Changes in the business environment and increased competitiveness have led many companies to consider Business Process Reengineering(BPR) as a means to improve performance. However, while some BPR projects have been successful among the many companies that have performed BPR, most of the reengineering efforts have been deemed unsuccessful as the project failed. There are many answers to this, but the most important point is that the effective linkage between process innovation and information system construction is insufficient. Even if the reform of consciousness is carried out through the promotion of management innovation activities such as BPR, and the process is improved, management infrastructure can not be continuously maintained if infrastructure, especially information system, is not built up to support it. In this paper, we propose BPR and information system combining methodology for successful BPR execution and information system construction, and describe the result of BPR consulting performance when constructing information system and compare the improvement of failure risk factor. In addition, we present the case through the case of K company, and finally present customer satisfaction through post evaluation after completion of K company information system construction project implementation.

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

Noise Analysis of Large Container Carrier Vessel on HVAC Noise (대형 컨테이너운반선의 공조 소음 해석사례)

  • Kim, Mun-Su;Cho, Dae-Seung;Kim, Byung-Hee;Kwon, Jong-Hyun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2006.09a
    • /
    • pp.65-70
    • /
    • 2006
  • In this paper, we introduce prediction program of HVAC system, HJNOVAC Version 2.0. The developed program adopts both the authentic empirical method suggested by NEBB and acoustic power balancing method. The program provides intuitive pre- and post- processor using modern GUI function to help efficient modeling and evaluation of cabin and HVAC component noises. To verify the accuracy and convenience of the program, we carry out noise prediction of HVAC system for 8,100 TEU Container Carrier and measure the noise levels of cabins during sea trial.

  • PDF

A Case Study of Post-Occupancy Evaluation of Home Automation System by Digital Home Residents - Focused on H Highrise Apartment - (디지털 홈 거주자의 홈오토메이션 시스템에 대한 거주 후 평가 사례 연구 - H 초고층 아파트 거주자를 중심으로 -)

  • Kwon, Oh-Jung
    • Journal of the Korean housing association
    • /
    • v.19 no.1
    • /
    • pp.17-27
    • /
    • 2008
  • Recently, newly built apartments in Korea are provided various home automation (HA) systems based on information technology(IT) for residents' safer, healthier and more convenient living. However, the residents in these digital apartments are often not able to use the home automation systems effectively because of lack of their IT knowledge, attitude, or education. However, there are few researches have been done to find out the HA systems' real problems with regard to residents' aspects who use those systems everyday. The purpose of this study was to find out residents' current uses, satisfaction level and existing problems of HA systems by residents' POE. The findings of this study will give useful information to digital home construction companies to provide user-friendly digital home services for increasing users' satisfaction. One distinctive apartment equipped with home automation systems located in Seoul was selected for in-depth personal interview. The researcher developed a survey instrument and collected the data from 58 residents in January, 2007 who had been living there for more than a year. The results of the study found that critical problems were existed in several systems and they caused a lot of dissatisfaction from the residents. Also, some residents do not use several systems although they need to use them due to the burden of maintenance fee. Further detail findings and suggestions of this study were discussed.

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

Impact Performance of Bridge Rail Composed of Composite Post and Tubular Thrie Beam (튜브형 트라이빔과 합성 지주를 사용한 교랑난간의 충격거동)

  • Ko, Man-Gi;Kim, Kee-Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.13 no.3
    • /
    • pp.313-325
    • /
    • 2001
  • Tubular bridge rail was developed to restrain and redirect a 14ton van-type truck. The developed bridge rail permits better visibility than concrete safety-shape bridge rail, and it has better structural adequacy than the existing steel and aluminum bridge rails in Korea. The new bridge rail consists of a tubular thrie beam(TTB) rail and a steel guard rail, which are connected to composite posts. The TTB shape provides both better containment of diverse bumper heights and more tight fit between the ends of bridge rail and roadside guardrails than the existing bridge rail sections currently used in Korea. Making composite post by filling concrete inside the steel pipe of the same size as are used for the roadside guardrail post was found to be more efficient in increasing the stiffness and ultimate strength than simply increasing the size of the steel pipe. The system was crash-tested for the impact condition of 14ton-80km/h-$15^{\circ}$, and it satisfied all evaluation criteria set forth in NCHRP Report 350 for a Test Level 4 safety appurtenance. Acceptable performances were obtained in computer simulations for the impact condition of S2.

  • PDF

A Study on the Post-Evaluation of Landscape Design Competition based on Ground Theory - Case of Gwanggyo Lake Park in Korea - (근거이론을 활용한 조경현상설계의 사후평가 - 광교호수공원을 사례로 -)

  • Hong, Youn-Soon;Park, Jae-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.92-102
    • /
    • 2016
  • While there have many completions of large parks recently under development, there has been a dearth of quality assessments. Studies focused on post-evaluation have been made to resolve this, but most of these are biased toward user satisfaction after completion and therefore behaviour analysis has limitations on solving problemsduring the actual design implementation processes. Therefore, this study examined the internal phenomenon and structure of the implementation process of design competition through the ground theory and microscopic independent perspective. As a result, maintaining the identity and differentiation of parks derived from the preserved design competition scheme contributed greatly to completeness and satisfaction. Outcomes were mainly caused by the trust of public officials as the ordering organization, the will of policy decision-makers, and the competence of operational enterprises, etc. Negative factors such as undermining the whole concept of the park and landscape occurred as external pressure and related subjects intruded on change design factors due to variations in social conditions. Additionally, illogical construction processes occurred, such as a reinvestigation of the budget for restoration after damaging on original landscape. There have been needs for the improvement of the work processing system. On balance, an interventional role is very important in the park construction process, especially the PA and operation committee in terms of maintaining the basic direction, landscape design supervision for detailed designs, and expert construction management on LA in terms of rational work management in the field. The study, using the microscopic perspective of the designer and ground theory, deliver significant meaning as an early study by suggesting alternative methods for the after-evaluation of large parks and structurally looking into main influence factors driven during the construction process.

Detection of tension force reduction in a post-tensioning tendon using pulsed-eddy-current measurement

  • Kim, Ji-Min;Lee, Jun;Sohn, Hoon
    • Structural Engineering and Mechanics
    • /
    • v.65 no.2
    • /
    • pp.129-139
    • /
    • 2018
  • Post-tensioning (PT) tendons are commonly used for the assembly of modularized concrete members, and tension is applied to the tendons during construction to facilitate the integrated behavior of the members. However, the tension in a PT tendon decreases over time due to steel corrosion and concrete creep, and consequently, the stress on the anchor head that secures the PT tendon also diminishes. This study proposes an automatic detection system to identify tension reduction in a PT tendon using pulsed-eddy-current (PEC) measurement. An eddy-current sensor is installed on the surface of the steel anchor head. The sensor creates a pulsed excitation to the driving coil and measures the resulting PEC response using the pick-up coil. The basic premise is that the tension reduction of a PT tendon results in stress reduction on the anchor head surface and a change in the PEC intensity measured by the pick-up coil. Thus, PEC measurement is used to detect the reduction of the anchor head stress and consequently the reduction of the PT tendon force below a certain threshold value. The advantages of the proposed PEC-based tension-reduction-detection (PTRD) system are (1) a low-cost (< $ 30), low-power (< 2 Watts) sensor, (2) a short inspection time (< 10 seconds), (3) high reliability and (4) the potential for embedded sensing. A 3.3 m long full-scale monostrand PT tendon was used to evaluate the performance of the proposed PTRD system. The PT tendon was tensioned to 180 kN using a custom universal tensile machine, and the tension was decreased to 0 kN at 20 kN intervals. At each tension, the PEC responses were measured, and tension reduction was successfully detected.

Operating model for A Value-For-Money evaluation of BTL Projects for Educational Facilities (교육시설 BTL 사업의 투자가치 평가를 위한 운영비 모형 구축)

  • Son, Ki-Young;Kim, Jang-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.141-150
    • /
    • 2006
  • As the law on the private sector investment in social infrastructure was amended in January of 2005, the government is aggressively promoting BTL projects but many trials and errors and problems are occurring. Especially, the Value-For-Money evaluation conducted by the responsible agencies to judge the appropriateness of the project found there was a conspicuous difference between the computed cost and the final contract sum. Accordingly, this study is aimed to grasp the problems in the current Value-For-Money evaluation and to improve it in order to proceed with BTL projects efficiently. To achieve this, through a relative comparison to the final contract sum, a clear standard for the items of Value-For-Money evaluation was presented and thus, a model that can ensure accuracy in computing the Value-For-Money was established so that a delay in negotiations can be avoided. If the Value-For-Money evaluation established in this study is used in assessing the appropriateness of unit prices for BTL projects for education facilities, a reasonable result can be expected to be drawn in selection and negotiations with contractors, and maintenance and Post-Operation-Evaluation(POE) of education facilities as well.

An Analysis of evaluations of Exhibition Design for Cheongju International Craft Biennale (청주국제공예비엔날레 전시회장 조성에 관한 평가와 분석)

  • Cho, Young-Youn;Lee, Kang-Hoon
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.6
    • /
    • pp.60-68
    • /
    • 2009
  • Cheoungju International Craft Biennale is not just an art exhibition but more like a pubic festival which is including an experiential learning and a public participation section as well as a special exhibition and an international competition section. Thus it is strongly required to present an appropriate meaning and mood corresponding to each exhibition hall. The paper has examined the exhibition topics during the last 10 years and the plannings and contents to install the exhibition hall according the yearly topic and it has analyzed the comprehensive evaluations after the exhibition. The research scope is limited to the part related to the exhibition hall and facilities, which is including calculation of dimensions and layout, access and movement system, the appropriateness of the design and construction period, measure of applied technology appropriateness, post management as well as planning intent, estimation of the number of the visitors, preliminaries. With the results shown in the comprehensive evaluation and analysis, the paper has presented two issues, the one related to the procensure and preparation and the other related to the facilities. It is showed that both problems are due to the lack of expertise and it is necessary for the experts to participate from the first step of the procedure including planning for the successful exhibition. For the appropriate exhibition hall corresponding to the exhibition planning and scale, it is required to have the professional considerations of successful space and visitor's movement management, display environment, construction method, and post management. The study presents that architectural and interior design have to take an active part in constructing exhibition design in overall stage including the initial, practice, and evaluation stage.