• Title/Summary/Keyword: Construction Policy System

Search Result 740, Processing Time 0.036 seconds

The Effect of Rating Criteria of Construction Skilled Workers' Rank System on Policy Purpose (건설기능인등급제의 등급기준이 정책목표에 미치는 영향)

  • Kim, Myeongsoo;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.35-43
    • /
    • 2023
  • This study is aiming to analyze the relevance of rating criteria and these criteria may have effects on policy purpose of 'Construction Skilled Workers' Rank System', that are inflow of new comer, improvement of job performance, and decrease job-change. Closely related systems, electronic card system and prevailing wage system, are considered by assuming three scenarios, although they are not introduced yet. Empirical survey shows that the relevance is above average. The empirical result of regression also predicts that policy target might be mostly satisfied. Policy purpose is regressed on rating criteria, they are career, qualification, education and training, award. Career and award have positive impact on inflow of new comer. All four criteria have significant impacts on improvement of job performance. Award has strong effects on decreasing job-change. Especially, when electronic card system and prevailing wage system are adopted simultaneously with 'Construction Skilled Workers' Rank System', the level of satisfaction of policy purpose would be higher.

A Study on the Reformation of the Apartment Remodelling System (공동주택 리모델링 제도 개선방안연구)

  • Kim, Joon-Hee;Han, Sang-Yeon;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.847-850
    • /
    • 2008
  • Apartment remodeling has been a hot issue in Korea. At first, all facility should be constructed newly in a city. When land is not suppled for new construction, reformation or rehabilitation of the facility may be executed. Though the demand of reformation is increasing, the system except financial support is not systematically provided. Therefore remodelling system and policy of domestic and oversea were examined, and the direction of the system were suggested in this research.

  • PDF

Accuracy Analysis of Earthwork Volume Estimating for Photogrammetry, TLS, MMS (토공사 계측 방식(Photogrammetry, TLS, MMS)별 토공량 산정 정밀도 분석)

  • Park, Jae-Woo;Yeom, Dong-Jun;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.4_2
    • /
    • pp.453-465
    • /
    • 2021
  • Recently, photogrammetry, TLS(Terrestrial Laser Scanner), MMS(Mobile Mapping System)-based techniques have been applied to estimate earthwork volume for construction management. The primary objective of this study is to analyze the accuracy of earthwork volume estimating between photogrammetry and TLS, MMS that improves the traditional surveying method in convenience, estimating accuracy. For this, the following research works are conducted sequentially; 1) literature review, 2) core algorithm analysis, 3) surveying data acquisition using photogrammetry, TLS, MMS, 4) estimated earthwork volume comparison according to surveying method. As a result of the experiment, it was analyzed that there were earthwork volume errors of 1,207.5m3 (14.03%) of UAV-based digital map, 391.5m3(4.55%) of UAV, TLS integrated digital map, and 294.9m3(3.43%) of UAV, MMS integrated digital map. It is expected that the result of this study will be enormous due to the availability of the analyzed data.

A Study on the Safety System Improvement for Preventing Fall Accidents during Frame Construction in Apartment Sites (아파트 현장 골조공사 떨어짐 사고 예방을 위한 Safety System 개선에 관한 연구)

  • Chun, Byoung-Jo;Shin, Dongil Peter
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.39-48
    • /
    • 2021
  • In the past, measures for the reduction of industrial accidents has led the safety and health policy of construction sites by the guidance, supervision and the regulation according to 「Occupation Safety and Health Act」 handled by Ministry of Employment and Labor (MOEL). Nowadays companies realize that due to the factors such as diversification of employment types, outsourcing of hazardous work, new construction method and complicated types of construction, etc., there is a limit on safety management for construction sites as far as it is passively led by the governmental safety management policy and regulation. In this study, in order to practice the autonomous safety management escaping from the government-led safety management, improvement plans are proposed and applied by analyzing the basic cause of the all kinds of fall accidents that could possibly occur in the apartment construction sites and by verifying the hazardous factors and risks by fields.

A Study on the Policy Agenda for Activating PC Apartment using Focus Group Interview(FGI) (FGI를 사용한 PC공동주택 활성화 정책과제 모색)

  • Bae, Byung-Yun;Kang, Tai-Kyung;Shin, Eun-Young;Kim, Kyong-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.888-895
    • /
    • 2020
  • In the construction industry, off-site construction (OSC) is drawing attention as a production method due to changes in working hours and the supply and demand of manpower. In 1991, there was a policy of spreading and expanding the use of precast concrete (PC) apartment homes, but they have not been actively used so far since they were discontinued due to quality problems. In this study, policy tasks were analyzed to motivate the application of OSC-based PCs in the apartment housing sector, and policy directions were derived by conducting focus group interviews (FGI). Nine policies are suggested regarding the following topics: PC apartment supply quantity provision, priority application of public housing, priority supply of public housing, preferential floor area ratio, funding, tax support, improvement of business area structure, improvement of delivery method, factory certification system, and training of experts. The results of the FGIs are as follows. First, in order to revitalize PC apartment homes, leading efforts from the public sector are required. Second, rather than reorganizing the business sector or introducing a new delivery method, a policy direction that induces the strengthening of cooperation is desirable. Third, PC activation should be promoted on an institutional basis for securing appropriate construction costs and quality.

Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction (사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안)

  • Jun, Younghun;Kim, Kyoontai;Jeon, Eunbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.120-130
    • /
    • 2021
  • Recently, the government is reinforcing safety management at construction sites to prevent safety accidents in construction works, and the safety management plan of workers is an important situation. Meanwhile, modular construction is expected to be gradually expanded to middle and high-rise buildings, but active measures to ensure worker safety are insufficient. This study is a preliminary study of the development of a checklist for preventive worker safety management. The purpose of this study is to derive a checklist classification system for the safety management of workers in the field of modular construction by preceding studies, case analysis, and expert advisory opinions. The classification system consists of large categories of factory manufacturing, transportation, and on-site construction, and the sub-system consists of six sub-classes: foundation work, frame work, modular frame installation work, finishing work, and facility work. Among them, the sub-classification of modular frame installation work consists of 12 unit works, centering on module lifting and assembly module work, which are the main construction processes. And the classification system reflects the three main management factors and contents for defined safety management. It is expected that the research results of this study can contribute to efficient safety management at the modular construction site.

A Study on Effect Analysis for Foreign Worker that Employment Permit System gets in Construction Site (고용허가제 도입이 건설현장에 미치는 영향 분석에 관한 연구)

  • Kim Yong-Jun;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.592-595
    • /
    • 2004
  • The number of domestic foreigner worker increased rapidly In the 90s, and Domestic foreigner worker occupied important position in the various manufacturing industries or 3D types of business. Newly adopted policy called employment licence system has great significance in that it has fundamentally and drastically changed current foreign immigrant policy from the root. With foreigner worker and information of employment licence system introduction through question investigation. This research removes side effect in construction industry hereafter through drawn spot administrators` awareness and may present direction that need in foreigner worker`s practical use.

  • PDF

Dynamic Construction of Initial Order Set For The Order Picking System (오더피킹시스템에서의 초기주문집합의 동적 구성에 관한 연구)

  • 노인규;박찬웅
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.41
    • /
    • pp.95-102
    • /
    • 1997
  • This paper deals with an order picking system in an automated storage and retrieval system(AS/RS). For the order picking system, two fundamental policies, the batching and the picking policies, must be selected. The batching policy determines the manner in which orders are combined for picking in each trip of picking machine. The picking policy determines the sequence of all items in each group of orders. Most of studies for the batching policy doesn't consider dynamic arrivals and due dates of orders. Therefore, we present an batching policy which considers dynamic arrivals and due dates of orders. The presented batching policy is efficient for the automated storage and retrieval system which is connected with a manufacturing system.

  • PDF

An Analysis of Perceptions of Road Construction Engineers on ICEC Framework at the time of System Transition from Responsibility Supervision to Construction Management (III) - Main Focus of Application for CM & ICEC - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(III) - CM과 역량지수 적용을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.269-276
    • /
    • 2016
  • Recently the organizations related construction express frequently their opinion to MOLIT at the time of introducing the ICEC grade system and converting a system from responsibility supervision (RS) to construction management (CM). However there was no data to investigate the recognition of road construction engineers about the policy change. In this study, a questionnaire survey was conducted and analyzed twice to the road construction engineers on the CM and ICEC grading system at the Korea Institute of Construction Technology Education. The trend of response from the road construction engineers was verified through the survey separately from other institutions. This study analyzed the results and introduced a desirable policy proposal to promote an international competitiveness of the engineering industry.

The Prediction of the Apartment Construction Project Cashflow with Changing Sales Point (분양시기 변동에 따른 공동주택 건설공사 현금흐름 예측)

  • Bae Jun-Ho;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.234-237
    • /
    • 2003
  • The Korean housing supply have been provided by the Pre-construction sales system. The Pre-construction sales system contributed to large housing supply. But it followed by the market anomaly. Along the housing market is changing to tile market for consumers, it requires new policy and regulations. This market changes and needs to modify the policy make a discussion about introducing the Post-construction sales system. it concerns to change the time to sale. This paper analyzes the present feasibility study and makes a tool to predict construction cashflow considering changed sales point. The sales timing leads to decide the amount of financial costs in the construction project and that cost affects to the feasibility. The accurate cashflow prediction is required for a successful apartment construction delivery.

  • PDF