• Title/Summary/Keyword: Construction Planning

Search Result 2,711, Processing Time 0.03 seconds

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Case Study of Opinion Coordination between Residents and Coordinators on the Planning Process of Community Housing in Sungmisan Village (성미산마을 공동체주거 계획과정의 거주자와 코디네이터의 의견조정 사례연구)

  • Park, Kyoung-Ok;Ryu, Hyun-Soo
    • Journal of the Korean housing association
    • /
    • v.23 no.3
    • /
    • pp.1-11
    • /
    • 2012
  • The purpose of this study was to make clear considerations in the planning of community housing and the roles of coordinators. Seongmisan village, a representative urban community village in Seoul, was selected for this study on problem solving between residents and opinion coordination between residents and coordinators. For this qualitative research, 2 residents and 2 coordinators answered 'open questionnaires' on prior basic planning, land purchase, financing, architectural planning, construction and inspection, and actual living conditions thereafter. They were each interviewed for 2 hours at a time that was 14-16 months after the residents started living in the new houses, and the records were transcribed. The following was the result. 1) The residents, who ruled the steps of prior basic planning and land purchase, did not have sufficient information or knowledge of the construction of community housing, so that they faced difficulties especially in the legal and financial aspects. 2) The coordinators participated in the project at the steps of architectural planning and construction. The residents accepted the coordinators' opinions on the choice of floor and position, and the coordinators listened to the residents' opinions on individual plans and finishing materials. In the construction step, however, there was conflict between them, and dissatisfaction occurred on the completion time and construction cost. For the successful construction of community housing, a professional coordination company needs to join the project to establish a system of opinion coordinating from the step of prior basic planning to the step of afterconstruction management.

A Study on Analytic Hierarchy Proces for Construction Planning -Research on Examples of Railway Route Selection- (건설계획 수립시 계층분석적 의사결정법 적용방안에 관한 연구 -철도노선 선정시 활용사례 연구-)

  • Sohn, Jin-Hyeon;Cha, Cheol
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.249-254
    • /
    • 2007
  • Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.

  • PDF

Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model (이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구)

  • Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.