• Title/Summary/Keyword: Construction Personnel

Search Result 251, Processing Time 0.032 seconds

Equipment and Worker Recognition of Construction Site with Vision Feature Detection

  • Qi, Shaowen;Shan, Jiazeng;Xu, Lei
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.4
    • /
    • pp.335-342
    • /
    • 2020
  • This article comes up with a new method which is based on the visual characteristic of the objects and machine learning technology to achieve semi-automated recognition of the personnel, machine & materials of the construction sites. Balancing the real-time performance and accuracy, using Faster RCNN (Faster Region-based Convolutional Neural Networks) with transfer learning method appears to be a rational choice. After fine-tuning an ImageNet pre-trained Faster RCNN and testing with it, the result shows that the precision ratio (mAP) has so far reached 67.62%, while the recall ratio (AR) has reached 56.23%. In other word, this recognizing method has achieved rational performance. Further inference with the video of the construction of Huoshenshan Hospital also indicates preliminary success.

A Study on the Cost Criteria for Street Tree Pruning through Field Survey (현장실태 조사를 통한 가로수전정 원가기준 마련 연구)

  • Oh, jar-hoon;Ahn, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.210-211
    • /
    • 2022
  • Pruning is the most important work for the growth and aesthetics of street trees. It is also the most actively conducted maintenance work. However, the specifications, application methods, and cost criteria for pruning have not been systematically established. This has recently caused a lot of confusion in the practice of street tree pruning, such as indiscriminate pruning and lack of construction costs. Therefore, this study clarified the contents of work according to the form of pruning. It added 'aesthetic pruning,' which takes into account design. In addition, It revised equipment not in conformity with the law and excluded personnel necessary for on-site traffic control so that they could be reflected separately. As a result, this study is expected to contribute a lot to securing appropriate construction costs for maintaining street trees.

  • PDF

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Structure Evaluation of Korean Health Promotion Programs (우리나라 보건소 건강증진 사업의 구조적측면 평가)

  • Lee Chung Yul;Kim Hee Soonl;Lee Tae Wha;Ham Ok Kyung
    • Journal of Korean Public Health Nursing
    • /
    • v.17 no.2
    • /
    • pp.181-191
    • /
    • 2003
  • Purpose: The purpose of this study was to evaluate demonstration health promotion programs offered by 18 health centers in a structural aspect of the health centers. Methods: The Evaluation Committee was organized with professors from collaboration universities and researchers of this study. Using structure evaluation frame. reports from 18 health centers were reviewed by the committee. Evaluation categories included organizational change, manpower construction, budget, and manpower training and education. Results: Only 5 health centers out of 18 have independent health promotion department. Nurses played a major role for health promotion programs. Other health personnel participated in the health promotion programs included dental hygienists, nutritionists, and exercise specialists. Related to program budgets. local government support rates were varied by the region. Various kind of manpower training was offered to health personnel for the health promotion programs including smoking control. exercise, alcohol, nutrition, and so forth. Conclusion: The study results indicated that establishment of independent health promotion department, maintenance of same manpower construction, provision of diversity manpower training were the factors that foster effective health promotion programs.

  • PDF

Electronic Security Control Center Building Process and Security and Management Measures (시스템경비 관제시설의 구축과 보안 및 경영대책)

  • Ha, Kyung-Su;Cho, Cheol-Kyu;Kim, Pyong-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.5
    • /
    • pp.113-121
    • /
    • 2015
  • This research suggests construction processes and security solutions for security control center as management measures for security management improvement in domestic electronic security companies. Security control center (SCC) is the central nerve of electronic security service, and no matter how well the on-site response system has been built, if SCC ceases to work due to an incident or disaster or security control personnel are harmed, the electronic security system cannot perform its proper functions. It is divided to a spatial structure, the infrastructure, control equipment, control solutions and operating structure in a construction process in the security control center. And a solution can be presented for physical security, information security, and personnel security in the way to security solutions.

Human resource development and needs analysis for nuclear power plant deployment in Nigeria

  • Egieya, Jafaru M.;Ayo-Imoru, Ronke M.;Ewim, Daniel R.E.;Agedah, Ebisomu C.
    • Nuclear Engineering and Technology
    • /
    • v.54 no.2
    • /
    • pp.749-763
    • /
    • 2022
  • The fulcrum of economic development is a sustainable supply of electricity. Nigeria is plagued with blackouts, with one of the lowest per capita electricity consumption in the world (circa. 120 kWh per capita). Hence, policies have been instigated to integrate electricity generation from nuclear power plants (NPP) on or before 2027. However, a critical requirement for NPP generation is the implementation of robust human resource development (HRD) programs. This paper presents the perspective of Nigeria in assessing human resources needs over the entire NPP lifecycle following the milestone approach and employing the IAEA's Nuclear Power Human Resource (NPHR) modeling tool. Three workforce organizations are in focus including the owner/operator, regulators, and construction workers following three decades timeframe (2015-2045). The results indicate that for the study period, a maximum of approximately 9045 personnel (73% construction workers, 24% owner/operator, and 3% regulators) should be directly involved in the NPP program just before the commissioning of the third NPP in 2033. However, this number decreases by about 73% (2465 personnel including 94% operator and 6% regulator) at the end of the study timeframe. The results can potentially provide clarity and guidance in HRD decision-making programs.

The Influence Factors on the Activation of Environmental Innovations in Manufacturing Firms (제조기업의 환경혁신에 대한 원인요인과 촉진요인)

  • Choe, Jong-min
    • Korean Management Science Review
    • /
    • v.32 no.3
    • /
    • pp.71-89
    • /
    • 2015
  • This research empirically investigated the influence factors on the activation of environmental innovations (EI) in Korean manufacturing firms. In this study, external factors (compulsory demand, government regulation, normative pressure and imitative pressure) and internal factors (environmental resources, top management support, integration of environmental tasks, capabilities of environmental personnel, and environmental strategy/environmental management systems) were totally considered. The results of a multiple regression analysis showed that influence factors such as top management support, environmental resources and integration of environmental tasks have a significant and positive impact on levels of EI. However, the effects of external factors were not statistically significant. We also examined whether capabilities of environmental personnel as well as environmental resources, which are directly related with degrees of EI, have a moderating impact on relationships between other internal factors and levels of EI. With a subgroup analysis, the moderating role of abilities of environmental personnel were empirically confirmed. Through a multiple regression analysis, the direct effects of external factors on the adoption or construction of internal factors were demonstrated. The effects of government regulation, normative pressure and imitative pressure on internal factors were significant and positive. It was also found that external factors have indirect effects on EI through internal factors. Finally, the results of multiple regression analyses indicated that EI positively influences the achievement of environmental competitive benefits, and environmental competitive advantages can improve the organizational performance of a firm.

A Study on the fluctuation Factors Influenced on the Computation of interior Cost (인테리어 공사비 산정에 영향을 주는 변동요인에 관한 연구)

  • 정재은;권영성
    • Korean Institute of Interior Design Journal
    • /
    • no.16
    • /
    • pp.75-81
    • /
    • 1998
  • With the rise of the economic level and the improvement of the standard of living the size of the interior work is becoming large and specialized, With the recent opening of the domestic interior decoration market the order of the large-scale interior decoration work is actively received and its efficient construction is vigorously made. Accordingly reliability is required in keeping with all the accuracy of computing interior construction expenses systematically is importantly emerging. The estimation sheet written in a kind of process mode and in an area made as the construction expense breakdown mode were statistically treated and analyzed as well as quantity computation breakdown data. In determing the major factors that expert an influence on the factors of changes in construction expenses as well as the compositional ratio of construction work that becomes basic material for developing the cost model of interior decoration work the following conclusion could be made: Improvement should be made to suit the present situation by synthesizing and arranging the data practically used in current interior construction expenses. Required construction expenses for the kind of work common to each construction field are showing a given proportion and the required construction expenses of rather small scale interior construction work tend to be irregular. It is necessary to compute optimal construction expenses by calculating the optimal period of work and working personnel in consideration of the influential factor in each work.

  • PDF

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

A Study on Safety Management Indicators for Landscape Construction Field (조경시공현장 안전관리 항목에 관한 연구)

  • Park, Jae-Young
    • Journal of Environmental Science International
    • /
    • v.31 no.7
    • /
    • pp.653-663
    • /
    • 2022
  • Research activities and discussions on specialized areas reflecting the specificity of landscape construction are necessary. Therefore, this study was conducted with the purpose of presenting basic data for efficient field management by deriving items necessary for safety management in landscape construction fields through experts' opinions. A survey was conducted using Delphi analysis to derive "management items" and "safety management items according to landscape type" for landscape construction field safety for a total of 15 landscape construction specialists. The survey results showed that four top items were derived from the "management items" for the safety of landscape construction fields; they include: "safety and health management organization and education," "industrial safety and health management expenses," "payment of personal protection," and "establishment of safety measures." In addition, two to five items for each higher item appeared and resulted in a total of 13 lower items. Personnel, organization, budget, etc. for safety management are always required in the field, and the monitoring part of whether these elements are working was also taken up as a management item. In the "Management items according to each landscape construction" a total of eight landscape type were distinguished, they include: 'Reinforced concrete work', 'Masonry work', 'Plaster's work', 'Waterproof work', 'Stone masonry work', 'Pavement work', 'Facilities work', and 'Planting work'. Furthermore, two to seven sub-items for each construction type were derived, and a total of 35 management items were presented.