A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building (초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구)

  • Hong, Bo-Bae;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

Factor Deduction of the Checklist for Environmental Management in Construction Phase (시공단계 환경관리를 위한 체크리스트 항목 도출)

  • Kim, Chang-Won;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.139-141
    • /
    • 2013
  • Construction industry has been participated in the effort for the reduction of environmental pollution such as introduction of green building certification, enactment of environment related regulation. However these efforts are focused on the design and maintenance phases of entire life cycle, construction phase that can occur intensive environmental impact in a short period is insufficient. Therefore this study aim to derive environmental management factors in construction phase and assess them using reliability analysis and factor analysis. As a results, the 20 factors was classified into 4 superordinate such as 'plan and supervision', 'environmental factor management', 'licensing management', 'surrounding environment management'.Based on result of this study, further study should be developed the checklist for effective environmental management in construction phase.

  • PDF

Effects of Seismic Loads with Different Return Period on Residential Building with RC Shear Wall Structure under Construction (주거용 RC 벽식 건물의 시공 중 재현주기에 따른 지진하중의 영향)

  • Choi, Seong-Hyeon;Kim, Jea-Yo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.2
    • /
    • pp.43-50
    • /
    • 2022
  • Even though the structural safety is confirmed in the design stage, the structural safety is not guaranteed in the construction stage because the structural system is not completed. In addition, since the construction period is shorter than the period of use of the building after completion, it is excessive to apply the same seismic load to the construction stage as in the design stage. ASCE 37-14 presents the concept of seismic load reduction factor during construction, but does not provide a clear application method. Therefore, in this study, the seismic load reduced according to the return period was applied to the example model of a residential middle-rise RC building. The construction stage of the example model was divided into five-story units, and seismic load with the change of the return period was applied to the construction stage models to analyze the change of seismic load during construction and to check the sectional performances of structural members. By comparing the design strength ratio of the shear wall at the design stage and the construction stage, the range of seismic load magnitudes that can assure the safety during construction of a residential middle-rise RC building was analyzed in terms of the return period.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings (SMART 프레임의 공기단축 효과 분석 - 대형 물류창고 사례 -)

  • Kim, Doyeong;Ji, Woomin;Lim, Jeeyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.519-530
    • /
    • 2022
  • As online commerce increases, the construction of large logistics buildings worldwide is exploding. Most of these buildings have the characteristics of long span and heavy loaded and use precast concrete components, a pin joint structure, for rapid construction. However, due to construction safety and structural stability requirements, the pin joint structure has many limitations in terms of the erection of the PC member, which increases the time and cost. A structural frame connected with steel joints between precast concrete components, called a SMART frame, has been developed, which addresses these constraints and risks. However, the effect of the appllication of a SMART frame on the time aspect has not been analysed. The study is a time reduction effect analysis of a SMART frame for long span and heavy loaded logistics buildings. For this study, the authors select a case site erected using existing PC components, and compare the time reduction with the SMART frame erection simulations. Through this analysis, it was found that a time reduciton about 4 months, approximately 48% of the conventional PC installation period could be achieved. If the SMART frame is applied when carrying out future large-scale logistics building projects, it can be expected to have the effect of significantly shortening the construction period compared to the conventional method.

Application of the Robot for Curtain Wall Installation in a High Building (고층 빌딩 커튼월 시공 작업에서의 로봇 활용에 관한 연구)

  • Lee, Soung-Yel;Ko, Bong-Soo;Lee, Kye-Young;Lee, Sang-Heon;Ohk, Young-Mu;Han, Chang-Soo
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.1488-1493
    • /
    • 2003
  • Recently, higher and bigger building is trend of the construction. Accordingly the building material is getting bigger and construction equipments are developed. But operation is still depends on human resource. Therefore there have several problems that are safety, laborious operation, and shortage of worker. In the various construction sites, the automation in construction is introduced to solve these problems. This paper proposed the automation system in construction that installs curtain wall in a high building. The system is expected effects that are reduction of a construction period, retrenchment of the cost and assurance of safety.

  • PDF

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

A Study on the Effect of Initial Strength of Cement Paste Containing Fly Ash or Blast Furnace Slag on CO2 Curing Period (플라이 애쉬 및 고로슬래그 혼입 시멘트 페이스트의 CO2 양생 기간에 따른 초기강도의 영향에 대한 연구)

  • Han, Jae-Do;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.83-84
    • /
    • 2018
  • As the concentration of greenhouse gases in the atmosphere increases, the reduction of CO2 is gaining worldwide attention. In the construction industry, cement replacement materials such as fly ash and blast furnace slag were investigated to reduce CO2 emissions in cement production process. Precast concrete is used in the field after manufacturing in the factory in the form of pipes and bricks because of shortening construction period and cutting construction cost. According to the results of previous research, it is known that early CO2 curing in concrete using OPC or fly ash has an initial strength enhancement effect and can be used for precast concrete production. Therefore, the purpose of this study is to evaluate the strength improvement effect by confirming the initial strength improvement effect when blast furnace slag is mixed.

  • PDF

Effective Safety Education Schemes at Construction Sites for Enhancing Safety Consciousness of Workers and Engineers (건설현장 근로자 및 관리기사의 안전의식과 안전교육 효율화 방안)

  • 김동하;고병인;임현교
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.2
    • /
    • pp.163-169
    • /
    • 1999
  • Safety education should not only prevent workers from industrial accidents but also contribute to improve the productivity of manufacturing plants or construction sites. In practice this do not happen because workers do not realize the importance of safety education. This study aims to suggest a methodology to improve safety education of construction sites by surveying conditions of safety education and the safety consciousness of workers and engineers. The results showed that most education except regular educations were nominally carried out. Lectures and audio-visual education were mainly used as educational methods. After trainees attended the education session they completed a written survey, the most dissatisfied factor about safety education was education circumstances, of which rate was around 36%. The proportion of construction engineers who thought that safety management was contributable to cost reduction was 35%, to construction period 20%, and to quality enhancement 48%. Based on these results, this research pointed out the need to review training manuals, the development of educational programs, improvement of educational facilities to improve safety education of construction sites, and finally to discussed these issues.

  • PDF

A Study of Analysis and Improvement Measures for Productivity in PC Project (PC공사의 생산성 분석 및 향상방안에 관한 연구)

  • Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.96-97
    • /
    • 2013
  • PC(Precast Concrete) technology has been widely used for reduction of construction period and manpower in domestic construction industry since it was introduced from advanced countries in the 1960s. But most of existing researches are shortage of research which proves the efficiency of PC methods quantitatively. Therefore, this study analyzed productivity targeting construction site workers who are working on projects using the PCF(Precast Concrete Frame) system out of PC methods that is used most typically in construction sites, and in order to provide basic data to prove the efficiency of PC project quantitatively.

  • PDF