• Title/Summary/Keyword: Construction Performance Assessment

Search Result 469, Processing Time 0.025 seconds

Sub-System Requirements of a Pressure-fed Hot-firing Test Facility for the Performance Assessment of a LRE Thrust Chamber (액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건)

  • Lee, Kwang-Jin;Lim, Byoung-Jik;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.15 no.4
    • /
    • pp.94-102
    • /
    • 2011
  • Sub-system requirements of a pressure-fed hot-firing test facility for performance assessment of a Liquid Rocket Engine(LRE) thrust chamber using Liquid oxygen and kerosene were described. These requirements were based on the experience of construction and operation of the ground hot-firing test facility which was used for the development of the KSR-III and a 30 tonf-class LRE thrust chamber. So it is expected that this paper is used as a basic material and an itemized previous review statement for the design and construction of a large hot-firing test facility.

Sub-System Requirements of a Pressure-fed Hot-firing Test Facility for the Performance Assessment of a LRE Thrust Chamber (액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건)

  • Lee, Kwang-Jin;Lim, Byoung-Jik;Seo, Seong-Hyeon;Han, Yeoung-Min;Choi, Hwan-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.63-71
    • /
    • 2010
  • Sub-system requirements of a pressure-fed hot-firing test facility for performance assessment of a Liquid Rocket Engine(LRE) thrust chamber using Liquid oxygen and kerosene were described. These requirements were based on the experience of construction and operation of the ground hot-firing test facility which was used for the development of the KSR-III and a 30 $ton_f$-class LRE thrust chamber. So it is expected that this paper is used as a basic material and an itemized previous review statement for the design and construction of a large hot-firing test facility.

  • PDF

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

An Improved Facility Management System for Public Facility Management Corporations (공공 시설관리기관의 시설관리시스템 개선에 관한 연구)

  • Kim, ChangDuk;Lee, HyunChul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.32-42
    • /
    • 2018
  • The importance of facility maintenance management cannot be overemphasized in that not only the value but also the performance of the facility is determined by the level of maintenance. The maintenance cost of the facility ranges from 3 to 10 times the initial construction cost depending the type and use of the facility over the life span. This maintenance importance is increased for the group of facilities and even more critical when the facilities compete for the limited budget with the limited resources such as manpower and equipment. This study analyzed sixteen public facility management corporations primarily for three items: 1) facility management system, 2) long-term rehabilitation plan, 3) the rehabilitation selection system. This paper provides and recommends the key elements of the facility maintenance management system based on the analysis of the sixteen corporations.

Factors Influencing Implementation of OHSAS 18001 in Indian Construction Organizations: Interpretive Structural Modeling Approach

  • Rajaprasad, Sunku Venkata Siva;Chalapathi, Pasupulati Venkata
    • Safety and Health at Work
    • /
    • v.6 no.3
    • /
    • pp.200-205
    • /
    • 2015
  • Background: Construction activity has made considerable breakthroughs in the past two decades on the back of increases in development activities, government policies, and public demand. At the same time, occupational health and safety issues have become a major concern to construction organizations. The unsatisfactory safety performance of the construction industry has always been highlighted since the safety management system is neglected area and not implemented systematically in Indian construction organizations. Due to a lack of enforcement of the applicable legislation, most of the construction organizations are forced to opt for the implementation of Occupational Health Safety Assessment Series (OHSAS) 18001 to improve safety performance. Methods: In order to better understand factors influencing the implementation of OHSAS 18001, an interpretive structural modeling approach has been applied and the factors have been classified using matrice d'impacts croises-multiplication $appliqu{\acute{e}}$ a un classement (MICMAC) analysis. The study proposes the underlying theoretical framework to identify factors and to help management of Indian construction organizations to understand the interaction among factors influencing in implementation of OHSAS 18001. Results: Safety culture, continual improvement, morale of employees, and safety training have been identified as dependent variables. Safety performance, sustainable construction, and conducive working environment have been identified as linkage variables. Management commitment and safety policy have been identified as the driver variables. Conclusion: Management commitment has the maximum driving power and the most influential factor is safety policy, which states clearly the commitment of top management towards occupational safety and health.

Risk Critical Point (RCP): A Quantifying Safety-Based Method Developed to Screen Construction Safety Risks

  • Soltanmohammadi, Mehdi;Saberi, Morteza;Yoon, Jin Hee;Soltanmohammadi, Khatereh;Pazhoheshfar, Peiman
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.3
    • /
    • pp.221-235
    • /
    • 2015
  • Risk assessment is an important phase of risk management. It is the stage in which risk is measured thoroughly to achieve effective management. Some factors such as probability and impact of risk have been used in the literature related to construction projects. Because in high-rise projects safety issues are paramount, this study has tried to develop a quantifying technique that takes into account three factors: probability, impact and Safety Performance Index (SPI) where the SPI is defined as the capability of an appropriate response to reduce or limit the effect of an event after its occurrence with regard to safety pertaining to a project. Regarding risk-related literatures which cover an uncertain subject, the proposed method developed in this research is based on a fuzzy logic approach. This approach entails a questionnaire in which the subjectivity and vagueness of responses is dealt with by using triangular fuzzy numbers instead of linguistic terms. This method returns a Risk Critical Point (RCP) on a zoning chart that places risks under categories: critical, critical-probability, critical-impact, and non-critical. The high-rise project in the execution phase has been taken as a case study to confirm the applicability of the proposed method. The monitoring results showed that the RCP method has the inherent ability to be extended to subsequent applications in the phases of risk response and control.

Crafting a Quality Performance Evaluation Model Leveraging Unstructured Data (비정형데이터를 활용한 건축현장 품질성과 평가 모델 개발)

  • Lee, Kiseok;Song, Taegeun;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.157-168
    • /
    • 2024
  • The frequent occurrence of structural failures at building construction sites in Korea has underscored the critical role of rigorous oversight in the inspection and management of construction projects. As mandated by prevailing regulations and standards, onsite supervision by designated supervisors encompasses thorough documentation of construction quality, material standards, and the history of any reconstructions, among other factors. These reports, predominantly consisting of unstructured data, constitute approximately 80% of the data amassed at construction sites and serve as a comprehensive repository of quality-related information. This research introduces the SL-QPA model, which employs text mining techniques to preprocess supervision reports and establish a sentiment dictionary, thereby enabling the quantification of quality performance. The study's findings, demonstrating a statistically significant Pearson correlation between the quality performance scores derived from the SL-QPA model and various legally defined indicators, were substantiated through a one-way analysis of variance of the correlation coefficients. The SL-QPA model, as developed in this study, offers a supplementary approach to evaluating the quality performance of building construction projects. It holds the promise of enhancing quality inspection and management practices by harnessing the wealth of unstructured data generated throughout the lifecycle of construction projects.

Construction of Earthquake Disaster Management System Based on Seismic Performance Evaluation of Architectural Structure (건축물 내진성능평가에 의한 지진재해관리정보체계 구축)

  • Kim, Seong-Sam;Cho, Eun-Rae;Yoon, Jeong-Bae;Yoo, Hwan-Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.3
    • /
    • pp.59-67
    • /
    • 2007
  • This paper proposes potentialities of constructing the information system for earthquake hazard management which can manage and analyse earthquake risk and hazard systematically. The experimental results as well as architectural structure investment data for seismicity assessment are built in database and connected with GIS for assessing earthquake safety of building in urban area. For earthquake-resistant performance assessment, we collected and classified building structural data according to assessment criteria using building register, architectural map, digital map, and then complemented database with field survey data. We also suggest GIS-based information system can cope with and manage earthquake hazard effectively, as evaluating earthquake risk by performing detailed earthquake-resistant assessment and determining final assessment scores. The assessment should be processed quickly and accurately by integrating the earthquake hazard information management system with modularization of assessment procedure and method in the future.

  • PDF

A study on Risk-based Bridge Performance Evaluation Method for Asset Management (위험도 개념을 적용한 교량 자산관리의 성능평가방법 연구)

  • Choi, Hyun-Ho;Sun, Jong-Wan;Park, Kyung-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.22-32
    • /
    • 2013
  • Generally, asset management procedure consists of exact information collection, decision of service level, analysis of aspiration level, analysis of financial condition and available budget, preparation of asset management plan, and value of modified asset. In this study, for the risk-based asset management, condition assessment and performance measuring, assessment of failure modes and risks, evaluation/selection of treatment options, and implementation of optimum solution are additionally included. For this, bridge inventory and performance measure considering risks are classified and method of quantitative/qualitative performance measure is suggested. Also, evaluation method of risk analysis for bridge asset management is suggested and basic research is carried out for applicable method of risk-based asset management. Using suggested risk procedure and method of risk-based bridge service level evaluation, it is possible to perform resonable asset management. Moreover, it is concluded that the proposed applicable method of risk-based asset management will provide a solution to contribute the development of systematical asset management for optimal decision making and prototype asset management system.

Energy Performance and Cost Assessment for Implementing GroundSource Heat Pump System in Military Building (군사시설 내 지열 히트펌프 시스템 적용에 따른 에너지 성능과 비용 절감 효과 평가)

  • Byonghu Sohn;Kyung Joo Cho;Dong Woo Cho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.18 no.4
    • /
    • pp.45-57
    • /
    • 2022
  • The Ministry of National Defense of the Republic of Korea is showing a lot of interest in net zero-energy buildings (NZEBs) to reduce energy consumption of military facilities and to promote green growth policy in military sector. The application of building passive technologies and renewable energies is essential to achieving NZEBs. This paper analyzed energy performance and energy cost on the conventional heating and cooling system (baseline scenario) and three different alternative scenarios (ALT 1, ALT 2 and ALT 3) applied in a hypothetical military building. A building modeling and simulation software (DesignBuilder V6.1) with EnergyPlus calculation engine was used to calculate the energy consumption for each scenario. Overall, when the GSHPs are applied to both space airconditioning and domestic hot water (DHW) production, Alt-2 and Alt-3, the amount of energy consumption for target building can be greatly reduced. In addition, when the building envelope performance is increased like Alt-3, the energy consumption can be further reduced. The annual energy cost analysis showed that the baseline was approximately 161 million KRW, while Alt-3 was approximately 33 million KRW. Therefore, it was analyzed that the initial construction cost increase could be recovered within about 6.7 years for ALT 3. The results of this study can help decision-makers to determine the optimal strategy for implementing GSHP systems in military buildings through energy performance and initial construction cost assessment.