Recently, mechanical and electrical construction are getting more important because of technology advances. In particular, construction market has become more competitive and construction requires more complicated and sophisticated works. Despite its importance, relatively little studies on construction management for mechanical construction and electrical construction. Therefore, this study conducted an analysis to identify the relationship between construction planning and project performance. For the analysis a number of mechanical professionals were participated. Ultimately, the study will provide a foundation of effective construction management for mechanical construction.
The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.
성과측정은 체계적인 관리와 개선을 위한 중요한 활동이다. 건설산업에서도 성과측정을 위한 지표 개발 등의 다양한 연구가 꾸준히 진행되어왔다. 하지만 성과측정을 위한 데이터 수집에 큰 노력이 필요하여 실제로 성과측정이 수행되는 경우는 적었다. 특히 제도를 통해 건설 프로젝트 데이터를 수집해 온 우리나라 공공부문과 달리 민간부문에서는 프로젝트의 성과를 파악할 수 있는 데이터가 전무한 실정이다. 한편, 우리나라는 건설공사 감리를 통해 건축현장 시공단계에서의 품질, 안전 등을 총체적으로 확인하는 제도를 갖추고 있다. 감리 과정에서 건축현장의 성과를 파악할 수 있는 중요 데이터가 생성되고 감리보고서는 「건축법」에 따라 제출이 의무화되어 있다. 본 연구는 민간 건축현장의 성과측정을 위해 감리보고서의 데이터를 활용하고자 한다. 선행연구와 감리보고서를 분석하여 예비성과지표를 선별하고 전문가 인터뷰를 통해 건축현장의 6가지 성과영역과 15개 성과지표를 도출하였다. 다음으로 전문가 설문조사를 실시하여 성과지표의 데이터 수집 가능성을 검증하였고, 성과영역 및 성과지표의 중요도를 도출하였다. 감리보고서 데이터를 기반으로 도출된 본 연구의 성과지표는 앞으로 민간 건축부문의 성과측정의 실효성을 높일 것으로 기대된다.
Choi, Kunhee;Lee, Hyun Woo;Bae, Junseo;Ryu, Kyeong Rok
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.150-153
/
2015
The construction industry is an integral part of any nation's economy, whether measured by dollar volume or workforce size. In spite of its strong influence, there has been very little specifically aimed at evaluating the current industry performance. This research investigates the macroeconomic performance of the construction industry by accounting for crucial performance affecting factors such as labor productivity and gross margin. A clustering analysis, followed by a series of statistical analyses, yielded a notable finding that labor productivity is the most important factor that affects industry's profitability. The results of the analysis also revealed that the states with the strongest labor productivity show the highest level of profitability in terms of gross margin. This study should be of value to decision-makers when plotting a roadmap for future growth and rendering a strategic business decision.
The government has performed various countermeasures and policies for the efficiency of Construction Industry. However the analysis of the policy performance is not satisfied. In the study we benchmarked the construction performance evaluation system and indicators which was performed by advanced countries like the United States and the United Kingdom. So we suggested indicators for measuring performance of public construction cost saving strategy performed in 2008 by the Ministry of Land, Transport and Maritime Affairs. This paper will provide the basis for establishing future construction policies or plans.
The 9th International Conference on Construction Engineering and Project Management
/
pp.1043-1050
/
2022
Markov chains and Monte Carlo Simulation were applied to account for the probabilistic nature of pavement deterioration over time using data collected in the field. The primary purpose of this study was to evaluate pavement network performance of Western Australia (WA) by applying the existing pavement management tools relevant to WA road construction networks. Two approaches were used to analyze the pavement networks: evaluating current pavement performance data to assess WA State Road networks and predicting the future states using past and current pavement data. The Markov chains process and Monte Carlo Simulation methods were used to predicting future conditions. The results indicated that Markov chains and Monte Carlo Simulation prediction models perform well compared to pavement performance data from the last four decades. The results also revealed the impact of design, traffic demand, and climate and construction standards on urban pavement performance. This study recommends an appropriate and effective pavement engineering management system for proper pavement design and analysis, preliminary planning, future pavement maintenance and rehabilitation, service life, and sustainable pavement construction functionality.
Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
Journal of Construction Engineering and Project Management
/
제9권2호
/
pp.1-24
/
2019
Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.
Journal of Construction Engineering and Project Management
/
제6권2호
/
pp.16-23
/
2016
The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.
The goal setting and performance measurement is essential tool for performance management. If appropriate goal setting and performance measurement is not done, problems may arise in the management. Therefore, in order to improve the efficiency of building production that management is essential. In addition, the construction project objectives established at the planning phase give considerable influence on the success of the construction project. Therefore, objective of this paper is to suggest the necessity of performance goal setting phase. This paper analyzes problems of goal setting phase and suggests the way to improve about problems.
The 3th International Conference on Construction Engineering and Project Management
/
pp.738-746
/
2009
The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.