The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management (공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발)

  • Hyun, Ji-Hun;Yang, Byong-Soo;Moon, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2012
  • The construction data should be controlled from the life-cycle perspective. The current PMIS (Project Management Information System) usually focuses on the construction operation stage. The PMIS does consider the utilization of the construction in the maintenance of constructed facilities. This paper tries to interface the construction data with the maintenance data for effective use of construction data in the life-cycle perspective. To achieve the research objective, a maintenance breakdown structure is established and connected to the work breakdown structures. The connection of the two breakdown structures provide a structured utilization of construction data for efficient maintenance work activities. A prototype suggests that the interface of maintenance and work breakdown structures can help provide a construction and maintenance data in a more efficient way for maintenance activities.

Management of Technology(MOT)-based Optimization Technology Sector Planning and the Construction of an Integrated Management System for Building Research (기술경영(MOT) 기반의 건설기술부문 최적화 기획 및 통합관리 시스템 구축에 대한 연구)

  • Kim, Dae-Gun;Jung, Sin-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.190-191
    • /
    • 2014
  • Recent construction sector integration and fusion technologies in various areas of research and planning systemis being maintained by the system. Past experience of conservative management in this emerging technology-driven business management through the convergence of various technologies and to find synergies to secure the future of construction technology because it is a need. The purpose of this study is builton the basis of technical and Technology Management Contact optimized system for integrated management of the area you want to build.

  • PDF

A Study on the Set up of Safety Management Model and Safety Management Information System in the Construction Management (건설사업관리(CM)에서의 안전관리모델과 안전관리정보시스템 구축에 관한 연구)

  • 김영수;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.45-61
    • /
    • 2003
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private institutes according to different systems can be eliminated for the securing of systematic and efficient safety management. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

A SYSTEMIZED APPLICATION METHOD OF RFID TECHNOLOGY FOR LOGISTICS IN BUILDING CONSTRUCTION PROJECTS

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sangyoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.79-87
    • /
    • 2007
  • An effective logistics management is necessary for successful construction projects. So, prompt and precise logistics information collecting and management is needed, but there has been no systematic and effective method for this, Therefore, in this research, a standardized plan for RFID application in logistics management that could comprehend processes in building construction projects, was developed. With the 7 generalized process types that comprehend processes in construction projects, critical factors that should be considered for RFID applications were derived, and systematic and efficient application method for building projects were developed.

  • PDF

Basic Study on Safety Accident Prevention System Development Using Wearable Device (웨어러블 장치를 이용한 건설사고 예방 시스템 개발 기초 연구)

  • Ryu, Han-Guk;Kang, Jin-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.55-56
    • /
    • 2018
  • In order to reduce the risk of accidents, we proposed a construction safety management system combined with wearable device and LoRa (Low-Range Wireless Network) communication method to apply the usefulness of Internet (IoT) technology which means "everything connected". to construction safety management Management system. The proposed wearable safety device is a device that relays information exchange between wearable safety device and safety management server by LoRa wireless communication method. The safety management server can store workers bio-data and perform big data analysis. If a risk factor is determined from the analysis result, a warning is sent to the wearable safety device and the manager's application. The goal of this system is to prevent construction workers from entering the dangerous area that is not suitable for work, and to prevent safety accidents caused by human cause by detecting abnormal condition during work.

  • PDF

Introducing TPMS on applying Lean Construction (린(Lean) 건설 개념을 도입한 TPMS 시스템에 대한 소개)

  • Park, Chan-Jung;Jung, Hee-Won;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.150-153
    • /
    • 2006
  • GS E&C had developed the construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on material, labor, equipment focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

Preliminary Investigation for Apply of e-Government Framework at the Construction CALS System (건설CALS시스템에 전자정부 표준프레임워크 적용을 위한 사전 고찰)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.433-440
    • /
    • 2013
  • The Ministry of Land, Infrastructure and Transport was developed the Construction CALS system for improvement of the construction economy. Construction CALS system is consist by Construction Portal System, Construction Management System, Construction Authorization and Permission System, Compensation Management System, Facility Maintenance Management System and has utilized at construction site of more than 900. Ministry of Land, Infrastructure and Transport and related researcher was proposed method of various function improvements for usability of the system. However, the proposed method was expanded the problems like increase of system management cost and development cost with decrease of data process rate. The problem was increases because has added of only service function without modify of software structure to the system on each different platform base. One of the methods for solving problems is to apply the e-Government framework and then integrated the different platform. The purpose of this paper is analyse of the applicability and efficiency of e-Government framework to the construction CALS system. For that was analyzed the e-Government standard framework and the developments case. And then was verified about the adaption possibility and efficiency by use the Function Point tool.

On the Risk Management System in Construction Industries (건설 분야 리스크 경영 시스템 구축)

  • 김종걸;박용수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.277-281
    • /
    • 2004
  • The establishment and application of risk management system is one of the current issues in world-wide leading companies. Poor risk management might bring large-scale accident in construction industry by its features(large scale, diversity). Standardization system and standard for risk should be managed timely. In this paper, we do comparative analysis of standardization systems and standards concerned on risk, so thus present basic data for safety reinforcement and risk zero in the construction life cycle process.

  • PDF