• 제목/요약/키워드: Construction Labor

검색결과 728건 처리시간 0.029초

철골 공장제작의 간접비율 도출 및 영향요인 분석 (Indirect Cost Rates and Influence Factors of Steel Factory)

  • 태용호;허영기;김경원;안방률
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.180-181
    • /
    • 2013
  • In order to draw indirect cost rates, theories of indirect cost were investigated, and recent field data were collected from steel factories. As a result, it was found that the ratio of indirect labor productivity compared to the direct labor ratio was approximately 17% and the ratio of indirect cost compared to direct cost was approximately 93%. Furthermore, 'The economy of construction industry' and 'size of steel factory' were found to be influence factors of the indirect cost ratio.

  • PDF

일제강점기 건설청부업단체의 담합에 관한 연구 (A Study on Construction Contract Bid-rigging during the Japanese Colonial Rule)

  • 이금도;서치상
    • 건축역사연구
    • /
    • 제15권5호
    • /
    • pp.19-39
    • /
    • 2006
  • This study deals with construction contract bid-rigging by Japanese contractors who monopolized the construction market of the Korean Peninsula during the Japanese colonial rule, and investigates the abuses of the contract bid-rigging. First of all, construction contract bid-rigging in Korea was triggered by Japanese construction contractors and contract brokers, who had savored the benefits of bidrigging in Japan and had repeated the bid-rigging in Korea since 1903. Second, the agency played a significant role to mediate construction contractors, and existed throughout the Japanese colonial rule on the Korean Peninsula with changing their names. Most of them were engaged in major contract bid-rigging scandals. Among them was Construction Association of Korea, which existed for over 13 years. The agencies had took part in governmental services since the mid-1930s when Japan exploited Korean people during wartime, and focused on sweating human resources for the constructions. Third, one of the biggest construction bid-rigging scandals during the Japanese colonial rule was "the 1st and 2nd scandal on Daegu construction contract bid-rigging." Indeed, the second scandal paved the way for the serial scandals: "Kyeongseong construction contract bid-rigging scandal", "Busan construction contract bid-rigging scandal", and other cases throughout the nation. Fourth, along with the contract bid-rigging cases related to the Japanese Government-General of Korea and local authorities, bid-riggings firmly took rooted in local governments' farmland reclamation projects in the 1920s and the poor relief services in the 1930s. The "bid-rigging charges" forced contractors to compensate their losses with exploiting material costs and labor costs, generating serious problems. The construction contract bid-rigging enabled Japan to monopolize the construction industry and to sweat farmers on the Korean Peninsula. Against this backdrop, contract bid-rigging by Japanese construction contractors during the its colonization made Korean contractors ruled out, and helped Japanese monopolize the industry. A large amount of bid-rigging charges drove Japanese contractors to do fraudulent work with cheap materials and to exploit Korean labor force.

  • PDF

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

AUTOMATIC AS-IS BIM EXTRACTION FOR SUSTAINABLE SIMULATION OF BUILT ENVIRONMENTS

  • Chao Wang;Yong K. Cho
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.47-51
    • /
    • 2013
  • Existing buildings now represent the greatest opportunity to improve building energy efficiency. Building performance analysis is becoming increasingly important because decision makers can have a better visualization of their building's performance and quickly make the solution for improving building energy efficiency and reducing environmental impacts. Nowadays, building information models (BIMs) have been widely created during the design phase of new buildings, and it can be easily imported to third party software to conduct various analyses. However, a BIM is not always available for all existing buildings. Even if a BIM is available during the design and construction phases, it is very challenging to keep updating it while a building is aged. A manual process to create or update a BIM is very time consuming and labor intensive. A laser scanning technology has been a popular tool to create as-is BIM. However it still needs labor-intensive manual processes to create a BIM out of point clouds. This paper introduces automatic as-is simplified BIM creation from point clouds for energy simulations. A framework of decision support system that can assist decision makers on retrofits for existing buildings is introduced as well. A case study on a residential house was tested in this study to validate the proposed framework, and the technical feasibility of the developed system was positively demonstrated.

  • PDF

MULTIFACTOR MODELLING IN CONSTRUCTION MANAGEMENT

  • Leszek Janusz;Oleg Kaplinski
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.633-637
    • /
    • 2005
  • The paper presents a multifactor modelling of construction processes. There are three phases of the proposed extended procedure. Tools for these phases from chronometric test to verifying of the assumed model are indicated. Apart from the classic verification activities the method of artificial neural networks has been successfully applied. The paper presents the usage of these tools to model the process of assembly of structural corrugated steel plate structures.

  • PDF

특성화 고등학교의 건설교육 및 훈련체계 개선방안 (Improvement Measures for Construction Education System in Specialized High School)

  • 유성곤;손창백
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.97-104
    • /
    • 2019
  • 건설업은 옥외이동생산, 주문제작 생산이라는 특징을 지니고 있어 기계화나 자동화가 어렵기 때문에 인력에 대한 의존도가 높은 산업이다. 따라서 양질의 기능인력 확보와 양성이 중요하지만 과거부터 수요에 비해 공급이 지속적으로 부족한 실정이다. 특히 청년층 인력은 높은 노동강도, 임시직 일용직 고용구조, 불투명한 미래비전 등으로 인해 건설업 취업을 더더욱 기피하고 있다. 현재 국내에는 청년층 기능인력을 양성하기 위한 기관으로 특성화 고등학교 건설 관련학과가 편성되어 있으나, 졸업 후 건설업으로 취업하는 비율이 낮으며, 기능역량도 낮은 실정이다. 본 연구에서는 이러한 문제점을 개선하기 위해 특성화 고등학교의 교육 훈련실태를 분석하여 문제점을 도출하고, 교육체계의 중점개선사항을 도출하였다. 또한 분석 결과에 대한 개선방안으로 교육 훈련경력 인정방안의 마련, 기업체와의 산학협력 확대, 외부 교육기관과의 연계 확대를 제시하였다.

조선시대 화성성역의 공정관리 사례분석 (A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty)

  • 김균태
    • 한국건축시공학회지
    • /
    • 제8권6호
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

중.소규모 건설현장 안전점검 모질 연구 (A Study on Safety Inspection Model for Small Scale Construction Field)

  • 안병수;양광모;강경식
    • 대한안전경영과학회지
    • /
    • 제3권3호
    • /
    • pp.11-21
    • /
    • 2001
  • Domestic construction industry has considerable level of construction performance and technology thanks to the economic development and as the result of performing diverse oversea construction project. However, construction disasters have been steadily increasing, and do severe disasters at faster pace. Most of such disasters happen at small and small medium-sized construction fields, which contract size is less than 10 billion won. small and medium-sized construction fields are not obliged to designate a safety manager, and have limitations in engaging self-regulating disaster prevention activities due to reduced budget for safety facilities. For the small and medium-sized construction sites with less than 10 billion won, the Ministry of Labor has been carrying out mobile inspections of construction safety. However, the effect so far is insignificant and an improvement plan is required. Therefore, in the present thesis, we derive problems appearing in the current construction safety mobile inspection system, investigate and study systems in foreign countries, and suggest an efficient and effective plan to operate safety technology inspections. First of all, we establish a standard to select sites to be inspected that are high in construction risk and disaster occurrence probability In addition, we suggest a plan to take administrative and judiciary measures based on the total score for disaster factors considering the disaster occurrence probability and the illegal practices. Furthermore, a scheme to maximize the effect of disaster prevention is sought by building an organic cooperative system between the Ministry of Labor, Korea Occupational Safety & Health Agency and other organizations specialized in instruction of construction disaster prevention. Finally, we induce a research conclusion that leads to self-regulating safety management through checking and instructing systematic management on mobile inspections.

  • PDF

화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석 (A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye)

  • 김균태
    • 한국건축시공학회지
    • /
    • 제21권6호
    • /
    • pp.641-652
    • /
    • 2021
  • 화성성역의궤에는 화성성역에 대한 상세정보가 기록되어 있으나, 현대적 건설관리 관점에서 분석과 평가는 제한적으로 진행되었다. 이에 본 연구에서는 팔달문을 대상으로 하여 시간, 비용, 인력 등 건설관리 관련 정보를 분석하였다. 팔달문 건설에 주요공종은 기초공사와 석공사였고, 전체 공기는 6개월로 전체적으로 매우 빠르게 공사가 진행되었다. 팔달문 건설의 소요비용의 총합은 약 52,423냥인데, 자재비에 약 15,9332냥이 소요되고, 인건비에는 약 36,4901냥이 소요되었다. 이를 현재가치로 환산하면, 자재비 약 11억원, 인건비 약 25억원으로 합은 약 36억원 수준이다. 향후에 공종별 작업 기간과 연계된 상세 투입인력 도출 등 추가적인 연구를 진행할 예정이다.