• 제목/요약/키워드: Construction Labor

검색결과 728건 처리시간 0.025초

건설노무제공자제도의 도입에 따른 영향 및 개선방안 (Impact of Introduction of Construction Labor Providers System and Improvement Plan)

  • 안혜균;서희창;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.149-152
    • /
    • 2010
  • Construction labor provider system is requested system by professional construction companys of profitless caused by directly hire of construction labor and labor management of difficulty after construction participants system abolition. Complemental laws which occured problems of Payment of wages, illegal subcontracting In construction participants system is prepared and no complemental point included in revised bill. but Construction labor groups oppose introduction of Construction labor provider system because groups concern to occurr before problem in construction participants system. The purpose of this study is drawn satisfactory system to Specialty contractor and construction worker.

  • PDF

호주 어워드 시스템과 국내 건설공사 시중노임단가 체계 비교연구 (Comparative Study on Awards System of Australia and Wage Rate in Construction of Korea)

  • 임채연;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2018
  • The labor cost on construction project of Korea is calculated based on the Wage Rate in Construction of Korea which is published by Construction Association of Korea. The Wage Rate in Construction of Korea does not have any variation on the wage following skill level of labor although it has 123 work categories. In addition, the classification on skill level and career of construction labor in Korea does not defined. Therefore, to establish the concept of the classification on skill level and career of construction labor, this study aim to compare the difference between Wage Rate in Construction of Korea with Award system which present grade on skilled labor.

  • PDF

AHP기법을 이용한 건설노동생산성 저하요인 분석에 관한 연구 (The Study on the Analysis of Factors Decreasing Construction Labor-Productivity Using AHP Method)

  • 표영민;배수용;유형한;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.141-147
    • /
    • 2005
  • Usually, processing whole project or a part of frame work delays due to acceleration, changing orders, management, characters of project. overtime, worker crowding, early occupation in the field of construction. Through a whole project, these factors cause decreasing construction labor-productivity which is the most dependent in business of construction. These kind of decreasing of construction labor-productivity cause many negative effects, just as extension of time, increasing cost in project of construction. Regardless of characters of construction or decreasing labor-productivity, extension of time is a incident which needs acceleration, also it cause a high possibility of claim and dispute. The productivity has just a broad meaning in business of construction. That's why it's difficult to apply in the field of construction. Especially, factors increasing or decreasing labor-productivity is defined by analysis of working as qualitative and outlined evaluation. However, study of the each factor decreasing construction labor-productivity analysis has not researched, because of difficulty of systematic measurement and management. The existed studies about management of productivity are just focused on estimation of productivity, not on evaluation of productivity. It was true that I couldn't examine clearly about the analysis of how much important per each the factor which have influence on labor-productivity because of the characteristic as qualitative that the labor productivity have On this study, i tried to get the factors decreasing of labor- productivity with gathering opinions of panels of expert's studies about the factors decreasing of labor-productivity on project of construction through Delphi method and i evaluated the result factors as quantitatively and subjectively about importance of factors decreasing construction labor-productivity Analysis, using AHP Method by Saaty. Also, using Delphi and AHP method, 1 suggest substantiated method qualitative factors are measured by quantitative criteria.

  • PDF

시스템 사고를 활용한 건설 산업의 노동생산성 모델 (Labor Productivity Model on Construction Industry Using System Thinking)

  • 장호면;김경훈;김재준
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.79-85
    • /
    • 2009
  • Labor productivity issues within the construction industry are receiving increasing attention. With the improvement in the standard of living, domestic laborers are avoiding 3D(Difficult, Dirty, and Dangerous) jobs by degrees. Because of this situation, the problem of insufficient labor is exacerbating in several basic industries. In particular, insufficient labor is a serious problem in the construction sector, where the workers are ageing and labor costs are increasing. In this study, we adopt a systematic approach to identify factors that influence labor productivity and analyze the causality between the factors and their ripple effects with the aim that the results of the study will help improve labor productivity and ensure its effective management. The established labor productivity model using systems thinking will get a footing in the greatest strategy in the construction industry.

건설업 노동생산성의 국제비교에 관한 기초 연구 (A Fundamental Study on International Comparison of Labor Productivity in Construction Industry)

  • 박환표
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.310-311
    • /
    • 2018
  • This study compared the labor productivity of the construction industry to the manufacturing and service industries. In addition, It analyzed the construction labor productivity gap of the G7 countries based on data from the Korean Productivity Center. A comparative analysis of construction labor productivity between manufacturing and service industries, based on statistics from the National Statistical Office, revealed a relatively low level and trend of continued decline. In addition, a comparative analysis of the productivity of construction workers in the major G7 countries found that the difference in productivity is very large, with an average of 65.3 %. Therefore, domestic construction companies and the government should prepare Improvement measures to improve productivity by investing in technology development to increase labor productivity and improving the production system of the construction industry.

  • PDF

의료시설 철근콘크리트공사에서 생산성과 실투입 노무량의 추이에 관한 분석 (Analysis of Trends in the Labor Productivity and Actual Amount of Labor Input in the Reinforced Concrete Construction of Health Facilities)

  • 정재웅;전상훈;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.103-104
    • /
    • 2015
  • Process management of reinforced concrete construction that many labor quantity and cost is put at a construction site is very important and gives a lot of influence on the subsequent process. Thus, there will be only used as a useful tool for process control by medical facilities and trend analysis of the flow of the process by the amount of labor input and productivity in reinforced concrete construction. productivity by type and quantity, and comparative analysis. In addition, it is necessary to calculate the standard of estimate and real commitment to labor productivity by type and quantity, and comparative analysis.

  • PDF

Fuzzy DEMATEL 방법을 활용한 건설산업 노동생산성 영향요인 구조분석 (Structural Analysis of Labor Productivity Influence Factors in Construction Industry Using Fuzzy DEMATEL Method)

  • 이찬우;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.353-354
    • /
    • 2023
  • Improving productivity in industries is a very critical issue, and improving labor productivity is especially important in construction industry, which is a labor-intensive industry. However, researches on labor productivity in construction industry are insufficient, and most of previous studies have limitations in terms of specificity and logic. In this study, fuzzy DEMATEL method was used to structural analyze of influence factors for labor productivity in construction industry based on previous researches and expert survey. The result of this study contributes to deriving priorities for improving labor productivity.

  • PDF

AN ANALYSIS ON THE LABOR/CAPITAL PRODUCTIVITY OF THE CONSTRUCTION INDUSTRY

  • Minsoo Choi;Jinu Kim;Moohan Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.968-973
    • /
    • 2005
  • The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the 1st period(1971-1988) to 0.4465 in the 2nd period(1989-1997), and to 0.1664 in the 3rd period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.

  • PDF

Labor Productivity Model for Reinforced Concrete Construction Projects

  • Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.983-989
    • /
    • 2009
  • This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.

  • PDF

시중노임단가 조사방법의 개선을 위한 기초연구 (A Basic Study for Improving of Labor Cost Survey in the Construction Market)

  • 이주현;백승호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.228-229
    • /
    • 2019
  • This study performs analyzing a status of labor cost policy of public construction project and labor management information system in Korea for improving of labor cost survey in the construction market. The outcome of this study will be helpful to build a labor cost information system included the information of man-hour, regular pay and benefit, total wage. And if these result is integrated with the information of worker's career, qualification, skill level, it is confidently expected that the survey of labor cost is reliable.

  • PDF