• Title/Summary/Keyword: Construction Estimate

Search Result 1,600, Processing Time 0.027 seconds

Development of Home Indoor Air Quality evaluation program considering planning and construction stage (주거 건물의 설계 및 시공단계를 고려한 실내공기질 평가 프로그램 개발에 관한 연구)

  • Choi, Dong-Hee;Kang, Dong-Hwa;Kim, Sun-Sook;Yeo, Myoung-Seok;Kim, Kwang-Woo
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.51-56
    • /
    • 2005
  • The objective of this study is to develop Home Indoor Air Quality evaluation prorgram considering planning and construction stage for architects, engineers and occupants to estimate and improve the IAQ of a home. In this study, the IAQ modeling technique was discussed to determine the appropriate modeling of housing unit in Korea. The program algorithm was developed based on the selected model reflecting planning and construction stage. This program can be applied to estimate the IAQ of a home and encourage appropriate action in advance.

  • PDF

A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information (형상정보가 없는 공종의 속성정보모델링 기법 개발에 관한 연구)

  • Lee, Min-Cheol;Lee, Sang-Jin;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.114-125
    • /
    • 2011
  • Construction industries worldwide have moved to Building Information Modeling environment in conjunction with IT technology progress. Korean domestic construction market is in the midst of enthusiastically adopting BIM technique and the public sectors try to apply the method to their projects. Difficulties have been introduced, however, in doing so mainly due to the complexity in reflecting the distinctions of the public cost estimate requirements to BIM modeling. The main objective of this study is to propose four kinds of BIM property information modeling methodologies which would be used in the quantity surveys of the public construction projects. To evaluate the applicability of the suggested modeling methods, the research performed a case study.

Attachment Rate Analysis of Airborne Chlorides by Construction Finish Material to Measure the Amount of Chlorides on the Surface (표면염화물량 산정을 위한 건축마감재별 비래염분 부착율 분석)

  • Cho, Gyu-Hwan;Ji, Dong-Hun;Jung, Jae-Min;Park, Dong-Cheon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.57-58
    • /
    • 2014
  • For durability design to protect against chloride-induced corrosion, it is important to estimate the amount of chlorides on the surface. However, it is difficult to estimate the airborne chlorides, a boundary condition, due to the difference between the amount of chlorides attached to a surface of an actual structure and that in the air. Therefore, in this study the attachment rate analysis of airborne chlorides was evaluated for 13 types of finish materials. As a result, despite differences in the amount of airborne chlorides according to the finishing type, it was found that 60 percent of airborne chlorides were attached to mortar, 30 percent were attached to steel, and 25 percent were attached to tiles compared with the amount of chlorides in the air.

  • PDF

A Basic Study on Estimation Method of Concrete Compressive Strength Based on Deep Learning Algorithm Considering Mixture Factor (배합 인자를 고려한 Deep Learning Algorithm을 이용한 콘크리트 압축강도 추정 기법에 관한 기초적 연구)

  • Lee, Seung-Jun;Kim, In-Soo;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.83-84
    • /
    • 2017
  • In the construction site, it is necessary to estimate the compressive strength of concrete in order to adjust the demolding time of the form, and establish and adjust the construction schedule. The compressive strength of concrete is determined by various influencing factors. However, the conventional method for estimating the compressive strength of concrete has been suggested by considering only 1 to 3 specific influential factors as variables. In this study, seven influential factors (W/B ratio, Water, Cement, Fly ash, Blast furnace slag, Curing temperature, and humidity) of papers opened for 10 years were collected at three conferences in order to know the various correlations among data and the tendency of data. The purpose of this paper is to estimate compressive strength more accurately by applying it to algorithm of the Deep learning.

  • PDF

EVALUATION OF NONDESTRUCTIVE TESTS ANALYSIS TO ESTIMATE INPLACE STRENGTH OF CONCRETE

  • Parviz Ghoddousi;Mohsen Tadayon;Pedram H. Mojarad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.672-680
    • /
    • 2005
  • There are a lot of reasons to use In-place tests. Construction schedules often require that operations such as form removal, post-tensioning, termination of curing, and removal of reshores be carried out as early as possible. To enable these operations to proceed safely as soon as possible requires the use of reliable in-place tests to estimate the in-place strength. In-place test results are not reliable for engineering judgment. These results should be interpreted and correlated to standard compressive strength, based on the test method. In this paper some of these test procedures and their limitations are discussed. In this study we will go on for Rebound number, Pullout, Ultrasonic pulse velocity, and Cast-in-place cylinder methods which are most useful methods in the Asia.

  • PDF

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

Analysis of Applicability of Visual SLAM for Indoor Positioning in the Building Construction Site (Visual SLAM의 건설현장 실내 측위 활용성 분석)

  • Kim, Taejin;Park, Jiwon;Lee, Byoungmin;Bae, Kangmin;Yoon, Sebeen;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.47-48
    • /
    • 2022
  • The positioning technology that measures the position of a person or object is a key technology to deal with the location of the real coordinate system or converge the real and virtual worlds, such as digital twins, augmented reality, virtual reality, and autonomous driving. In estimating the location of a person or object at an indoor construction site, there are restrictions that it is impossible to receive location information from the outside, the communication infrastructure is insufficient, and it is difficult to install additional devices. Therefore, this study tested the direct sparse odometry algorithm, one of the visual Simultaneous Localization and Mapping (vSLAM) that estimate the current location and surrounding map using only image information, at an indoor construction site and analyzed its applicability as an indoor positioning technology. As a result, it was found that it is possible to properly estimate the surrounding map and the current location even in the indoor construction site, which has relatively few feature points. The results of this study can be used as reference data for researchers related to indoor positioning technology for construction sites in the future.

  • PDF

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects (건축 프로젝트 개산견적 신뢰도 관리 프로세스에 관한 연구)

  • An, Sung-Hoon;Kim, Dae-Won;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.133-138
    • /
    • 2010
  • Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.

Development of Approximate Cost Estimate Model for Aqueduct Bridges Restoration - Focusing on Comparison between Regression Analysis and Case-Based Reasoning - (수로교 개보수를 위한 개략공사비 산정 모델 개발 - 회귀분석과 사례기반추론의 비교를 중심으로 -)

  • Jeon, Geon Yeong;Cho, Jae Yong;Huh, Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1693-1705
    • /
    • 2013
  • To restore old aqueduct in Korea which is a irrigation bridge to supply water in paddy field area, it is needed to estimate approximate costs of restoration because the basic design for estimation of construction costs is often ruled out in current system. In this paper, estimating models of construction costs were developed on the basis of performance data for restoration of RC aqueduct bridges since 2003. The regression analysis (RA) model and case-based reasoning (CBR) model for the estimation of construction costs were developed respectively. Error rate of simple RA model was lower than that of multiple RA model. CBR model using genetic algorithm (GA) has been applied in the estimation of construction costs. In the model three factors like attribute weight, attribute deviation and rank of case similarity were optimized. Especially, error rate of estimated construction costs decreased since limit ranges of the attribute weights were applied. The results showed that error rates between RA model and CBR models were inconsiderable statistically. It is expected that the proposed estimating method of approximate costs of aqueduct restoration will be utilized to support quick decision making in phased rehabilitation project.