• Title/Summary/Keyword: Construction Errors

Search Result 587, Processing Time 0.025 seconds

CONSTRUCTION ERROR TYPES - THE EXECUTION STAGE OF DUBAI PROJECTS

  • Hamad Aljassmi;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.459-467
    • /
    • 2011
  • Construction errors can have significant effects on project performance. Yet, any attempt to tackle error should be driven by the ability to understand its archetypal nature. This study aims to analyze a variety of construction errors at the execution stage, in order to develop a comprehensive set of categories that shall provide insights about the effect of different error types on the industry. We investigate a database provided by an authoritative source, which includes a number of 256 construction errors that occurred in the year 2009 in Dubai construction industry. Results from this study reveal that the most common error arose from 'poor workmanship' which accounted for 21% of the total encountered faults. The next most common types arose from the 'usage of impaired materials', followed by the 'deviation from an intended dimension'. These observations infer that the majority of construction errors are driven by workers' lack of skill or competence. Moreover, it suggests that execution-oriented errors are the major cause of faults and accidents rather than design errors.

  • PDF

A Study on the Review Methods of Design Errors in Construction Phase of BIM Project (BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구)

  • Lee, Se-Ip;Sim, Un-Jun;Ahn, Young-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

Investigation on Uncertainty in Construction Bid Documents

  • Shrestha, Rabin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.67-73
    • /
    • 2022
  • Construction bid documents contain various errors or discrepancies giving rise to uncertainties. The errors/discrepancies/ambiguities in the bid document, if not identified and clarified before the bid, may cause dispute and conflict between the contracting parties. Given the fact that bid document is a major resource in estimating construction costs, inaccurate information in bid document can result in over/under estimating. Thus, any questions from bidders related to the errors in the bid document should be clarified by employers before bid submission. This study aims to examine the pre-bid queries, i.e., pre-bid request for information (RFI), from state DoTs of the United States to investigate error types most frequently encountered in bid documents. For the study, around 200 pre-bids RFI were collected from state DoTs and were classified into several error types (e.g., coordination error, errors in drawings). The analysis of the data showed that errors in bill of quantities is the most frequent error in the bid documents followed by errors in drawing. The study findings addressed uncertainty types in construction bid documents that should be checked during a bid process, and, in a broader sense, it will contribute to advancing the construction management body of knowledge by clarifying and classifying bid risk factors at an early stage of construction projects.

  • PDF

Influence of Safety Awareness Levels in Construction Sites on Human Errors by Construction Workers (건설 현장의 안전의식 수준이 건설근로자 휴먼에러에 미치는 영향)

  • An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.477-484
    • /
    • 2023
  • Human error, a leading cause of construction accidents, emphasizes the need for minimization to reduce such incidents. However, due to the nature of the construction industry, workers operate within the collective environment of a construction site. Therefore, this study investigates the influence of safety awareness levels within construction sites on the human errors committed by construction workers, from an organizational perspective. The analysis revealed that human errors directly impact construction accidents and that safety awareness levels within construction sites influence the human errors committed by construction workers. Specifically, a strong correlation was observed between slip errors(unintentional actions or oversights) and safety awareness levels in nearly all domains of construction site safety. This study highlights that by elevating safety awareness levels within construction sites, the likelihood of construction worker slips - and by extension, construction accidents - can be significantly reduced.

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

Field Survey on the Construction Errors for the Members of Reinforced Concrete Structures (현장조사를 통한 철근콘크리트 구조 부재의 시공오차에 관한 연구)

  • Yoon, Sang-Chun;Jee, Nam-Yong;Choi, Ki-Bong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.201-208
    • /
    • 2010
  • Information on the distribution characteristics of construction errors is very important to determine the member factors, which are to be introduced in a new Korean design code for reinforced concrete structures. The new design code, which is under development for reinforced concrete structures, is based on the performance design concept. The construction errors of reinforced concrete members are mainly caused by the firmness and dimensional accuracy of forms, the arranging condition of reinforcing bars, the pouring and compaction methods of concrete, the skills of field workers, and the experience of supervisors. To find out the construction errors of reinforced concrete structures already built in Korea, a field survey for cover thickness, effective depth of reinforcement, the thickness of slabs and walls, and the dimension of beams and columns has been performed. Based on the survey, which is the first time in Korea, the analysis results are presented. The measuring methods for the construction errors, which have been established through the laboratory tests, are also presented. In addition, the measured construction errors from the survey are compared with the allowable tolerances in the current domestic and foreign specifications.

The growth rates and tune shifts due to construction errors of RF cavity

  • Nam, Soon-Kwon;Kim, T.Y.;Lee, B.K.
    • Journal of Korean Vacuum Science & Technology
    • /
    • v.2 no.2
    • /
    • pp.57-62
    • /
    • 1998
  • The resonance frequencies, shunt impedances and Q-values for the higher-order modes in our designed cavity are calculated by the computer codes URMEL and MAFIA. A new computer code is developed to calculate the complex tune shifts for the randomness of the higher-order mode frequencies due to the construction errors of a cavity. The results with the construction errors are compared to those fo without error cases for the dipole mode and quadrupole mode.

  • PDF

An Analysis of Relationship between Unsafe Acts and Human Errors of Workers for Construction Accident Prevention (건설사고 예방을 위한 근로자의 불안전한 행동과 휴먼에러와의 관계 분석)

  • Min, Kwangho;Cha, Yongwoon;Han, Sangwon;Hyun, Changtaek
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.5
    • /
    • pp.161-168
    • /
    • 2019
  • Construction industry is becoming more advanced, but safety accidents are not decreasing and unsafe act (UA) and human errors (HE) are the main causes of safety accidents. Therefore, this study aims to analyze the relationships between unsafe acts and human errors for construction accident prevents. Specifically, the Correlation Analysis is used to quantify 24 combinations of the relationship between the UA and HE. Then, the Kano Model, and Timko Satisfied Coefficient was utilized to find 6 combinations for construction accident prevention plans. As the result of Timko Satisfied Coefficient, an interview was conducted with three safety managers and 6 safety prevention plan is proposed. Through these results, it is expected that the combination of 24 accidents will be basic data of safety management. Especially, the proposed safety prevention plans considering the characteristics of 6 combinations with high correlation can contribute to prevention of safety accidents at the construction site.

Measures for Improving the Quality of Temporary Container Classrooms (컨테이너 임시교사의 품질개선방안)

  • Yu, Byong-Jae;Bang, Hong-Soon;Lee, Jong-Sung;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.38-39
    • /
    • 2021
  • The use of temporary container classrooms has increased in recent years due to the development of the construction industry and renovation or rehabilitation of schools. Therefore, various problems, such as errors during assembling, design and insulation issues, and noise problems, have surfaced during the construction of temporary container classrooms. This study analyzes the causes of assembly errors during the manufacturing and installation processes to improve the quality of temporary container classrooms. Assembly errors are caused by non-level planes and inaccurate cutting during the manufacturing process. In the installation process, poor leveling is a major factor that causes errors during the assembly of temporary container classrooms. These causes result in uneven horizontal or vertical planes and uneven height. To solve these problems, quality improvement measures, such as pin connection, jig, joint coupling, and surface plates are proposed in this study.

  • PDF

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF