• 제목/요약/키워드: Construction Drawings

검색결과 362건 처리시간 0.028초

배관설치도 내 생산정보 증강을 위한 겹침 회피 알고리즘의 적용 (An Application of Overlap Avoidance to Augment the Production Data in Pipe Installation Drawings)

  • 황인혁;유원선;박인하;박정서
    • 대한조선학회논문집
    • /
    • 제53권5호
    • /
    • pp.428-434
    • /
    • 2016
  • A lot of drawings for pipe construction and installation are needed to construct plant process system on the offshore plant structures. Depending on their scale or complexity, the required number of drawings related pipes sometimes amounts to several hundreds of thousands. Most major shipyards, therefore, have their own system which can automatically depict pipes’ geometric, manufacturing, and BOM(Bill of Material) information on the drawings. However, as the complexity and absolute quantity in the isometric region on the drawings is increased, the information extraction from the customized DB and positioning at the typical locations does not get to be enough to avoid the overlap between geometric contours, labels, and symbols. For this reason, the novel methods to arrange additional annotations without overlaps are presented in the paper. This approach is expected to increase the readability and legibility of the drawing and prevent the human error, and finally decrease the time-consuming and tedious jobs which are unnecessarily required to designers.

수치지도 갱신을 위한 건설도면 자료의 GIS 데이터 변환에 관한 연구 (A Study on GIS Data Transform for Update the Digital Map with Construction drawings)

  • 박승용;박우진;유기윤
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2009년도 춘계학술발표회 논문집
    • /
    • pp.11-13
    • /
    • 2009
  • 본 연구는 최신의 수치지도 확보를 위한 갱신방안으로서 건축 및 다양한 SOC 건설공사에서 사용되고 있는 CAD 자료의 준공도면을 활용하여 수치지도를 갱신하기 위해 GIS 데이터로 변환하는 기법을 제시하였다. 변환과정은 레이어 추출, 객체변환, 좌표변환, 포맷변환으로 구성되며 CAD 데이터로부터 각 과정을 거쳐 변환된 GIS 데이터는 수치지도를 갱신할 수 있다.

  • PDF

2D 건축도면기반 BIM 엘리먼트 생성 모델 (Generation Model for BIM Elements based on Architectural Drawings)

  • 배창준;박상헌;조동현;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.68-69
    • /
    • 2018
  • The construction drawing is a collection of knowledge that has accumulated knowledge and experience of designers and is highly valuable for recycling in the future. BIM is a process and technology that acquires and manages the information needed for the whole life cycle of a building. In order to recycle digitalized 2D drawings in BIM Tool, it is required to use 3D information based on the drawing information to save and reuse them, but there is little research on related methods or system development. In this study, 3D elements are created based on 2D drawing information, and libraries are constructed, and BIM Tool is used to improve the recyclability of drawing information.

  • PDF

BIM기반 건설현장 관리모델 개발에 관한 연구 (A Study on the development of Construction Field Management Model based on BIM)

  • 전영웅;이명식
    • 한국디지털건축인테리어학회논문집
    • /
    • 제9권3호
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

Method to Use the Augmented Reality for Construction Planning and Management

  • Nam, Keong-Woo;Kang, Chulung;Jang, Myunghoun
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1067-1074
    • /
    • 2022
  • An architect creates his/her design to meet owner's requirements. Floor plans, perspective drawings, and scale models are used in order for the owner to choose the design. The tools are a little helpful for communication between the architect and the owner in case the owner does not know architecture. The scale models are good, but it is hard to make scale models while design is in progress. 3D CAD is a good tool for communication, but it is time-consuming and requires high-performance computer hardware. Augmented reality is able to show 3D virtual models that are updated by the architect with smart devices such as a smart phone and a tablet PC. The owner frequently reviews the updated design anytime anywhere. This study proposes a method to use augmented reality for architectural design and construction management. The method supports the communication between the owner, the architect and the contractor to review updated designs, and to complete the building project. 3D models expressed in augmented reality are created using SketchUp with 2D drawings for building construction. An Android application implementing augmented reality is developed by Qualcomm Vuforia and Unity on smart devices. Drawings as markers and 3D models are connected in Unity. And functions that temporarily hide unnecessary parts can be implemented in C# programming language. If an owner, an architect, or a contractor looks at a smart phone on a 2D drawing, he/she can identify building elements such as 3D buildings or columns on a screen. This can help communication between them.

  • PDF

수치지도 수정.갱신을 위한 건설공사 준공도면 활용방안 연구 (A Study on the Application of As-Built Drawings for Updating Digital Maps)

  • 신동빈;유선철
    • 한국공간정보시스템학회 논문지
    • /
    • 제10권4호
    • /
    • pp.37-45
    • /
    • 2008
  • 최근들어 공간정보의 최신성에 대한 요구가 늘어나고 있지만 현재 우리나라의 지도수정체계로는 국토정보 변화에 대한 대응이 곤란하여 이를 보완할 수 있는 방안의 모색이 필요하다. 이에 본 연구에서는 제도화된 내용을 토대로 준공도면을 활용하여 1/5,000 수치지도의 수정을 위한 방안을 마련하였다. 이를 위해 기존에 작성된 준공도면과 수치지도를 비교 검토하고, 다양한 국내외 사례와 각종 규정을 검토하였다. 또, 준공도면의 유형별로 대상지역을 선정하고, 준공도면을 활용하여 수치지도를 수정하였다. 다음으로 준공도면과 관련된 각종 제도 및 규정에 대한 검토 후 개선방안과 준공도면 활용방안을 마련하여 그 결과를 제시하였다. 본 연구의 결과와 지속적인 노력을 통해 신속하고, 정확한 지리정보를 제공할 수 있는 기반을 마련할 수 있을 것으로 기대한다.

  • PDF

A Study on the Loss Reduction Method of Reinforcing Bar through Case Study

  • Park, U-Yeol;Jung, Hyeon-Ok;Kang, Tai-Kyung;Cho, Hun-Hee
    • 한국건축시공학회지
    • /
    • 제10권4호
    • /
    • pp.123-132
    • /
    • 2010
  • Rebar work accounts for approximately 30% of the total construction costs for rebars and concrete. Recently, the high rising prices of rebars have become one of the principle factors of rising construction costs. Therefore, construction companies are putting much effort into loss reduction of rebars. Consequently, in this study, we wished to present loss reduction methods of rebars before the preparation of the placing drawings. To devise such methods, we collected previous case studies and analyzed methods that were applied for loss reduction. As a result of the analysis, we were able to find the following methods for loss reduction of rebars: method of reducing the number of splices at the mat foundation, method of reducing splice length at the internal columns or walls of the underground parking lot, method of reducing cap-ties of internal beams of basement floors excluding perimeter beams, and method of reducing anchorage length at the internal column or wall of the underground parking lot. Based on those analysis results, we presented our own loss reduction methods of rebars. Applying our methods resulted in considerable loss reduction.

개방형BIM기반 2D도면 자동 생성 프로그램 개발에 관한 연구 (Development of an Application to Generate 2D Drawings in Automation using Open BIM Technologies)

  • 김인한;이민재;최중식;김구택
    • 한국CDE학회논문집
    • /
    • 제21권4호
    • /
    • pp.417-425
    • /
    • 2016
  • Especially for resolving BIM data compatibility issue, as one of recently raised BIM technology issues, has also been improved by using open BIM, representatively using IFC (Industry Foundation Classes) format. As shown in many case studies, usefulness of BIM technology is increasing day by day, and the IFC-based open BIM technology is essential in recent AEC projects where the productive collaboration is of importance. One of current problems in actual projects is that there is a conflict between conventional ways and newly developed BIM ways. Using both conventional and new technologies leads construction workers to having more work loads, consequently the efficiency and productivity of on-site workers have been decreased. Thus, it is strongly necessary to facilitate 3D BIM models to extract and generate 2D precision drawings in automation, especially using open BIM technologies. Some native BIM authoring tools have limitations in there automatic generation of 2D drawings, and there is no standardized mechanism to generate 2D drawings from heterogeneous applications. For this reason, this paper aims to develop an automated stand-alone program to generate 2D drawings in automation using IFC file, totally independent from various BIM authoring tools. By using the application described in this paper, any type of general drawings such as plan, section and elevation can be extracted without additional efforts. The development approach described in this paper, based on the open BIM technologies, has a strong impact to the current process especially in the perspective of enhancing productivity when we need to find out a trade-off in-between conventional and new approaches.

서울 은평 뉴타운 1지구 조경설계 (A Landscape Design Proposal for Eunpyeong New Town, Seoul)

  • 김순분;진양교
    • 한국조경학회지
    • /
    • 제33권2호
    • /
    • pp.111-121
    • /
    • 2005
  • The Seoul Housing Corporation pronounced an alternative design competition and a bidding for Eunpyeong New Town in December of 2004. At first many construction companies were interested in the first New Town Project. But at last a few companies had proposed the alternative design and construction cost. This project needed a conjunction of design ideas and technology know-hows. And the client wanted the brand power of construction company. Ultimately the Corporation hoped that the first New Town Project will end up with high quality successfully. This competition had started with the original construction drawings. Then it needed some alternative ideas and the lowest cost. There were two drawings of non changeable part and changeable part. Non changeable parts are structure like housing unit plan, underground parking lots. Changeable parts are outdoor layout, interior design and building facade. So we tried all ideas of landscape technology and design principles within limited guidelines. The author applied new technology like tilted rooftop greening and sustained container greening on high-rise apartment house. This green technology will be the first trial in Seoul and in the world as well. Daewoo Corporation have accumulated greening technology through the researches by national funding since 2002. Through this New Town Project the green technology will go forward step by step.

도면증강 객체기반의 건설공사 사전 시공검증시스템 개발 연구 (Development of Pre-construction Verification System using AR-based Drawings Object)

  • 김현승;강인석
    • 토지주택연구
    • /
    • 제11권3호
    • /
    • pp.93-101
    • /
    • 2020
  • Recently, as a BIM-based construction simulation system, 4D CAD tools using virtual reality (VR) objects are being applied in construction project. In such a system, since the expression of the object is based on VR image, it has a sense of separation from the real environment, thus limiting the use of field engineers. For this reason, there are increasing cases of applying augmented reality (AR) technology to reduce the sense of separation from the field and express realistic VR objects. This study attempts to develop a methodology and BIM module for the pre-construction verification system using AR technology to increase the practical utility of VR-based BIM objects. To this end, authors develop an AR-based drawing verification function and drawing object-based 4D model augmentation function that can increase the practical utility of 2D drawings, and verify the applicability of the system by performing case analysis. Since VR object-based image has a problem of low realism to field engineers, the linking technology between AR object and 4D model is expected to contribute to the expansion of the use of 4D CADsystem in the construction project.