• Title/Summary/Keyword: Construction Defects

Search Result 441, Processing Time 0.028 seconds

Research on Participation Plans of Professional Consultants by Staege to Prevent Defects in Stone Constructions (석재공사의 하자예방을 위한 전문 컨설턴트의 단계별 참여방안에 관한 연구)

  • Kim, Jong-Phil;Kim, Geun-Hwan;Jang, Kil-San
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.258-259
    • /
    • 2017
  • As the use of advanced quality materials in constructions has been increasing since 1980 with the improvements in the quality of life and economic scale, there has been drastic increase in constructions using stones for the internal and external construction materials. However, the reality is where many problems rise due to improper construction and management of uncertified stones which shorten the expiry date of the stones and act as the factor causing defects in buildings. Such defects not only bring economic losses but also influence consumer choice and act as risk factors to demand expansion of stone market. Therefore, the object of this study lies on proposing plans to prevent personal and economical losses due to repetitive defects by deriving the types of defects generated by process in stone constructions and identify the causes. Also, proposing construction process management plans as the measure for defect prevention, analyzing problems of stone constructions followed by the whole proves of design, construction and maintenance of stones, and solving such problems through appropriate participation of professional consultants depending on situations.

  • PDF

The Effect of Aggressive Order Intake on Defect of Construction Companies - Empirical Analysis Using Financial Approach - (공격적인 수주행위가 건설기업의 하자발생에 미치는 영향 - 재무적 접근을 이용한 실증분석 -)

  • Park, Hong-Jo;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.149-156
    • /
    • 2021
  • This study empirically verified whether aggressive order intake affect occurrence of defects of Korean construction companies. In order to compensate for the shortage of construction costs due to aggressive low-cost orders of contractors, self-response measures such as design changes are followed, and construction defects may be induced in this process. It aims to verify relevance between aggressive order intake and defect in construction empirically using financial accounting data. As a result, it was confirmed that an abnormal increase in order volume and a deterioration in profitability such as operating margin due to aggressive order taking behavior leads to a decrease in construction quality and occurrence of defects. In addition, it was also confirmed that low construction ability and intentional changes in construction design or contract conditions after construction commences were a direct causes of defects. The results of this study can serve as an opportunity to come up with measures to prevent defects by confirming the relationship between defects in construction and deterioration of profitability due to aggressive low-cost order takings.

Major Issues and Improvement Measures for Disputes between Construction Companies and Residents Related to Defects in Multi-Family Housing Complexes (건설사와 입주민의 공동주택 하자분쟁 쟁점 및 개선 방안)

  • Bang, Hong-Soon;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.1
    • /
    • pp.103-114
    • /
    • 2022
  • In the area of construction defects, residents have a tendency to focus on visually identifiable defects, while construction companies focus on defects that affect the structural and functional integrity of apartment housing. Accordingly, construction companies and residents have conflicting views on defects in apartment housing. To address this issue, this study aimed to accurately identify the main disputes surrounding defects in multi-family housing complexes or multi-dwelling unit apartment housing caused by such sharply different perspectives and suggest improvement measures. First, standards to determine different defects and remuneration standards between the Ministry of Land, Infrastructure and Transport and the court were analyzed. Then, problems were derived through an analysis of defects in past court cases, and the differences in perspectives between construction companies and residents were identified based on defect data from various construction companies. To tackle these issues, a classification measure for establishing a defect database for multi-family homes was also proposed.

A Study on the Direction of the Warranty Contract in Constructions (건설공사 성능계약제도 도입방향에 관한 연구)

  • Kim, Hyun;Park, Sung-Yong;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.153-157
    • /
    • 2008
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. However, the interior of a country encounter another problem result from defects liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

A study on the Application Scheme of the Warranty contract in constructions (건설공사의 성능계약 도입방안에 관한 연구)

  • Kim, Dae-Gil;Jeong, Ho-Geun;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.89-92
    • /
    • 2007
  • Since 1960s, advanced constructions have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction. However, the interior of a country encounter another problem result from Defects Liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Improving Construction Site Supervision with Vision Processing AI Technology (비전 프로세싱 인공지능 기술을 활용한 건설현장 감리)

  • Lee, Seung-Been;Park, Kyung Kyu;Seo, Min Jo;Choi, Won Jun;Kim, Si Uk;Kim, Chee Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.235-236
    • /
    • 2023
  • The process of construction site supervision plays a crucial role in ensuring safety and quality assurance in construction projects. However, traditional methods of supervision largely depend on human vision and individual experience, posing limitations in quickly detecting and preventing all defects. In particular, the thorough supervision of expansive sites is time-consuming and makes it challenging to identify all defects. This study proposes a new construction supervision system that utilizes vision processing technology and Artificial Intelligence(AI) to automatically detect and analyze defects as a solution to these issues. The system we developed is provided in the form of an application that operates on portable devices, designed to a lower technical barrier so that even non-experts can easily aid construction site supervision. The developed system swiftly and accurately identifies various potential defects at the construction site. As such, the introduction of this system is expected to significantly enhance the speed and accuracy of the construction supervision process.

  • PDF

The analysis of defects types and patterns in high-rise residential buildings (초고층 주상복합 건물의 하자 발생 유형 및 분석 연구)

  • Seo, Jang-Woo;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.

A Method for the Quality Improvement by the Punch List Analysis of Apartment Construction (아파트 공사의 펀치리스트 분석에 의한 품질개선방법)

  • Lee, Jae-Yong;Ji, Dae-Jun;Lee, Soo-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.2 s.80
    • /
    • pp.53-58
    • /
    • 2007
  • This study is to find out primary factors through the punch list in the large scale apartment housing complex, to prevent repeatedly occurring defects of construction and to gain quality management. The following are the findings of the research. (1) The positive strengthening of supervision for the workers can contribute to prevent defects of apartment construction and make better quality of the construction. (2) A solution should be made for the poor of surface join and the damage of work element showing a lot in the apart construction, which prevent defects and improve construction quality. (3) Indirect factors such as negligence and carelessness of the management should be improved to advance construction quality, and the caution and control strengthening of the management should be followed. It is revealed that hitch, omission, and heedlessness come from the defects, and the shortage of skill and checking appear as indirect factors. Therefore, to get quality improvement, the enhancement of the management factors, employment of excellent workers, and enhancement of working attitude and construction management are needed.

A Study on the Defects of Exposed Concrete Finishing Work Using AHP (AHP기법을 활용한 노출콘크리트 마감공법 하자 도출)

  • Choi, Seongmi;Song, Yeongwoong;Lee, Kiseok;Yoo, Seonghoon;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.46-55
    • /
    • 2019
  • The exposed concrete has been widely used in building construction. Therefore, many researches are presented to secure a proper construction quality of exposed concrete. Low quality and management absence, however, still remained in construction fields. Thus, many studies have been conducted to improve the quality, but defects still occur in the exposed concrete finishing work. In this study, the causes of defects were analyzed by process in order to prevent the generation of defects and to enhance the need for integrated management to secure quality. In addition, a case study and AHP analysis have derived the importance of defects occurring in the exposed concrete finishing work. The study concluded that the occurrence of the exposed concrete finishing work needs to be managed throughout the process, not the management limited by one process, according to the causes of the existing defects, and integrated management is required to prevent defects and improve quality of exposed concrete finishing work.