Experimental Study of In-situ Production of Precast Concrete Members

  • Lim, Jeeyoung;Son, Seunghyun;Kim, Jeong Tai;Kim, Sunkuk
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.263-270
    • /
    • 2017
  • The precast concrete (PC) structure has been preferred for reasons of shortening the construction time and securing the quality and, in particular, it has a cost saving effect in case of long span and heavy loaded structure with high floor height. Most engineers take it for granted to install the plant produced PC members. Researchers in several papers have argued that slander PC members such as columns and girders can be cost-effective if in-situ production is possible, while ensuring quality equal to or better than in-plant production. However, this argument is not officially accepted because objective verification has not been done. Therefore, the purpose of this study is to experimentally conduct in-situ production of PC members to verify the above claim. For this study, a storage building with long span and heavy loaded structure with high floor height was selected as a case study site. For the site, most of the PC members were supplied from the plant, and some of the columns were produced in the site for this study. As a result, it has been confirmed that it has a cost saving effect of 20% while having superior quality to plant-produced PC columns.

  • PDF

공동주택의 실별 제어환기 도입 타당성 분석 (Feasibility Study on Installation of Individual Room Control Ventilation in Apartment House)

  • 김정엽;신현준;권용일;윤영우;조춘식
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.502-507
    • /
    • 2009
  • Trend of mechanical ventilation system applied to apartment house is introduced and feasibility study on installation of the individual room control ventilation as energy-saving method is carried out through field experiment. While initial cost of installation for the individual room control ventilation increases, the running cost is lower than the individual household control ventilation due to automatic flow rate control and reduction of fan power, and the management cost also decreases due to extension of use life of components. As the results of field experiment on $115m^2$-type apartment house, the individual room control ventilation could save the amount of 1,459.5Wh/day when compared with the individual room control ventilation

  • PDF

건축물에너지절약계획서의 사업계획승인, 건축허가에 따른 적용시점의 타당성 연구 (A Study on the Feasibility of the Timing for the Implementation of Energy-Saving Plan of Buildings Based on the Approval of Business Plan and Construction Permit)

  • 김대원;김영일;정광섭
    • 에너지공학
    • /
    • 제21권3호
    • /
    • pp.265-270
    • /
    • 2012
  • 에너지절약에 대한 규제가 심하고 국민 다수가 에너지절감에 대한 관심이 높은 상태에서 사업계획승인을 받은 건축물이 건축허가가 지연되어 주변 신규 사업건과 함께 입주된 지역에서 관리비가 20~30% 차이가 발생한다면 심각한 민원이 될 것이다. 따라서 사업계획승인 시점에 에너지절약계획서를 작성하되 주택법 시행령 제18조로 인한 공사착수가 연장이 되어 2년이 경과 되거나 지연 될 때에는 건축허가 시점에서 현 기준에 의한 에너지절약계획서를 적용하는 것이 국가 에너지계획이나 민원에 대한 미연에 방지책이 될 것이라 생각한다. 에너지절약계획서의 목적과 요소의 기술들이 그 기능을 다하지 못하고 단순히 인, 허가 수순에 지나지 않는다면 많은 인력을 투입하여 검토하고 자문하는 것이 무의미한 시간 손실일 것이다. 정부나 건축주가 에너지 save측면을 공감하고 건물에너지효율을 개선하여야 할 것이다.

사무소건물 조명기기와 열원기기의 고효율기기로의 교체에 관한 경제성 검토 (Feasibility Study on Retrofitting Lighting and Heat Source Equipments in Office Buildings)

  • 이철구;김종대;임태순
    • 한국지열·수열에너지학회논문집
    • /
    • 제12권2호
    • /
    • pp.13-18
    • /
    • 2016
  • Energy saving has been main concern, thus government supporting policies which are based on Fundamentals of Low-carbon Green Growth Act', 'Green Building Support Act, have been prepared in Korea. The objective of this study is to estimate energy conservation effectiveness and economic advantage assuming that lighting equipments and heat source equipments would be retrofitted. Office building, which has total floor area of $30,000m^2$, was a subject of this study. From the estimations, electric rate will be decreased by 62,886,000 won per year due to lighting equipments retrofit, and gas rate will be decreased 11,141,000 won or 17,332,000 won per year due to heat source equipments retrofit (in case of COP 1.2 or 1.5). Payback period of each case that are calculated by energy saving cost and retrofit cost are estimated 27.9 year, 38.6 year and 29.2 year, thus economic supporting policies is necessary for effective energy saving in buildings. Meanwhile payback period of heat source equipment for new building is estimated 6.1 year and 8.3 year.

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

시공단계와 유지관리단계 비용분류체계의 경계조건 분석 (Analysis of Boundary Conditions for Cost Breakdown Structure in the Construction and Maintenance phase)

  • 정재혁;신한우;김태희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.21-23
    • /
    • 2012
  • The process of building project for planning, designing, construction, maintenance, and waste disposal are related with each other. However, we have a difficulty for estimating building's LCC due not to be flexible each other. Therefore, we analyzed the boundary condition between the process of construction and maintenance, and analyzed the factor of segment. We also suggested the Link System for flexible relation.

  • PDF

BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 - (BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -)

  • 이해찬;김진만;최철호;송상훈
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구 (A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market)

  • 김민기;신성훈;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.265-270
    • /
    • 2002
  • 국내 건설사업은 잘못된 관행, 졸속한 사업추진, 사전조사의 미흡 등으로 인하여 불필요한 사업을 추진하거나 잦은 설계변경을 함으로써 예산 낭비를 초래해 왔다. 1999년 건교부에서 '원가절감을 위한 공공건설효율화종합대책'을 발표한 이후 많은 정책적인 노력이 있었음에도 결구하고 사업비에 크게 영향을 미치는 시공 전 단계의 사업비관리 부문은 여전히 취약하다는 지적이다. 발주자 측면에서 적정공사비를 반영한 사업비가 산정되지 않고 건설사업이 단계별로 추진되는 과정에서 이를 고수하기 위한 관리도 수행되지 못하고 있다. 따라서, 본 연구에서는 선진 사업비관리 체계에 대해 조사하여 시사점을 도출하고, 국내의 실제 프로젝트 및 관련 제도에 있어 시공 전 단계 사업비관리의 문제점 및 현황을 사업비관리(Cost Management)의 관점에서 분석하여, 국내 사업비관리의 개선방안에 대해 제안하고자 한다.

  • PDF

쿤-터커 조건을 이용한 건물의 에너지성능과 비용 최적화방법 (Optimization Method of Building Energy Performance and Construction Cost Using Kuhn-Tucker Conditions)

  • 원종서;구재오
    • KIEAE Journal
    • /
    • 제3권2호
    • /
    • pp.51-58
    • /
    • 2003
  • The purpose of this study is to present rational methods of multi-criteria optimization of the shape of energy saving buildings. The object is to determine the optimum dimension of the shape of a building, based on the following criteria: minimum building costs (including the cost of materials and construction) and yearly heating costs. Mathematical model described heat losses and gains in a building during the heating season. It takes into consideration heat losses through wall, roof, floor and windows. Particular attention was paid to have a more detailed description of heat gains due to solar radiation. On the assumption that shape of building is rectangle in order to solve the problem, the proportions of wall length and building height are determined by using non-linear programing methods(Kuhn-Tucker Conditions). The results constitute information for designers on the optimum proportions of wall lengths, height, and the ratios of window to wall areas for energy saving buildings.