Identification of Factors Affecting Time and Cost Performance in Vietnam Construction Projects

  • Long, Le-Hoai;Lee, Young-Dai;Lee, Jun-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.728-731
    • /
    • 2007
  • In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.

  • PDF

A Computerized Construction Cost Estimating Method based on the Actual Cost Data (실적 공사비에 의한 예정공사비 산정 전산화 방안)

  • Chun Jae-Youl;Cho Jae-ho;Park Sang-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.90-97
    • /
    • 2001
  • The paper considers non-deterministic methods of analysing the risk exposure in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The Monte Carlo method is popular method for incorporating uncertainty relative to parameter values in risk assessment modelling. Non-deterministic methods, they are here presented as possibly effective foundation on which to risk management in cost estimating. The objectives of this research is to develop a computerized algorithms to forecast the probabilistic total construction cost and the elemental work cost at the planning stage.

  • PDF

Improvement of Construction Cost Index against the Change of National Basic Statistic (국가 기초 통계자료 환경변화에 따른 건설공사비지수 개선)

  • Kang, Taikyung;Baek, Seung-Ho;Kim, Chang-Won;Cho, Hunhee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.21-29
    • /
    • 2015
  • Construction cost index (CCI) has been published for last 10 years, it's contributed to update the historical cost data, analysis cost fluctuation and evaluate the market price for construction works with direct or indirect manner. CCI is a secondary or processed statistics using the basic statistics of input output table (IO table) and producer price index (PPI) from the Bank of Korea (BOK). So once the basic statistics change, it is required to modify the calculating model of CCI. Recently the BOK changed some fundamental principles and the base year (from 2005 to 2010), that can be used in IO table and PPI. This research analyzed the recent revision of basic statistics and their impacts on CCI, and improved the previous CCI model in response to it. Also the validity of new CCI was verified by analyzing the items and weights utilized in CCI and comparing the related index.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

A Study on the Current Situations about the Use of Big Data for Cost Estimating Tasks in CM Companies (CM사 견적업무의 빅데이터 활용 현황에 관한 연구)

  • Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.24-33
    • /
    • 2021
  • Cost management is a major function of CM (construction management) companies for clients and cost estimating is a critical task in that it provides a baseline for cost management and a foundation for decision making in construction projects. For this purpose, CM companies need to obtain and use good quality data, which leads to more accurate and efficient cost estimating. As the use of big data becomes increasingly important in the construction industry, researches related to the theme have become the active areas of studies. However, literature review shows that the current situations in relation to the use of big for cost estimating of CM companies are under-researched. The objective of the study is to identify key characteristics and implications in the use of big data for cost estimating of CM companies, which can contribute to develop strategies for such purposes.

건설현장 관리기사의 안전관리 효과에 대한 인식도

  • 고병인;임현교
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.265-270
    • /
    • 1998
  • As the goal of enterprises is to pursuit benefits, the goal of safety management is not only preventing accidents but also promoting benefits and productivity. However, enterprises have failed to realize the necessity of safety management, partly because they didn't grasp any appropriate evidences advocating effectiveness of safety management. This study aimed to survey construction-site engineers' consciousness on safety management contributing to cost reduction, construction period and quality enhancement. The result of this study showed that constriction-site engineers recognized the ratio of direct cost to Indirect cost as 1:2. The proportion of repliers who thought that safety management is contributable to cost reduction was 35%, to construction period was 20%, and to quality enhancement was 48%. The construction sites with excellent safety accomplisments also had good work and selling amounts.

  • PDF

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF