• Title/Summary/Keyword: Construction Cost Index

Search Result 199, Processing Time 0.026 seconds

RELIABILITY-BASED COMPONENT DETERIORATION MODEL FOR BRIDGE LIFE-CYCLE COST ANALYSIS

  • Rong-yau Huang;Wen-zheng Hsu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.386-397
    • /
    • 2007
  • One major development in bridge life cycle cost analysis (LCCA) in recent years is to develop deterioration model for bridge components so that the times of repair/replacement throughout a component's life span can be properly determined. Taiwan also developed her own bridge LCCA model in 2003, integrating with the bridge inspection database in the local bridge management system (T-BMS). Under the framework of the local LCCA model, this study employs the reliability method in developing a deterioration model of bridge components. A component deteriorates through time in its reliability, which represents the probability of a component's condition index exceeds a user specified threshold. Model assumptions and rationale are described in the paper. The steps for applying the developed model are explained in detail. Results and findings are reported.

  • PDF

A study on development of measuring index about railway electrification effectiveness (철도전철화 효과 계량지표 개발에 관한 연구)

  • Kim, Jae-Hee;Park, Yong-Gul;Yang, Keun-Yul;Jung, Ho-Sung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1575-1580
    • /
    • 2006
  • High speed and large transfer capability of railroad has been an important issue in Korean since KTX opening at 2004. Improvement projects for railway electrification are progressed in the conventional line as well as high speed line because various operation plan is performed such as interaction between high speed line and conventional line and operation of tilting train etc. Especially, railway electrification has many advantages which are cost effective and eco-friendly. But it also has some problems such as construction costs and accidents due to electrification. Therefore this paper developed measuring index of electrification railway benefit. By comparing between diesel and electrical locomotive, the operations of before and after the electrification and measurements quantitative index such as energy efficiency, enlargement of transfer capability, environmental pollution and maintenance and efficiency of operation is presented. In the future, Overall benefit and cost of railway electrification will be analyzed.

  • PDF

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.

A Reliability Analysis on the To-Box Reinforcement Method of PSC Beam Bridges (PSC보의 박스화 보강방법의 신뢰성해석)

  • Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.3 s.75
    • /
    • pp.94-100
    • /
    • 2006
  • The goal of this study is to show the way to increase the safety of deteriorated PSC beam bridges by the to-box reinforcing method. This method is to change the open girder section into the closed box section by connecting bottom flanges of neighboring PSC girders with the precast panels embedding PS tendons at the anchor block. The box section is composed of three concrete members with different casting ages, RC slab, PSC beam, precast panel. This different aging requires a time-dependent analysis considering construction sequences. Reliability index and failure probability are produced by the AFOSM reliability analysis. Transversely five schemes and longitudinally two schemes are considered. The full reinforcing scheme, transversely and longitudinally, shows the highest reliability index, but it requires more cost for retrofit. The partial reinforcing scheme 4, 4-1 are recommended in this study as the economically best scheme.

Estimation of Soil Volume Conversion Factors using Nondestructive Testing Methods (비파괴시험기법을 이용한 토량환산계수 산정 방법 제시)

  • Son, Thai An;Ryu, Hee-Hwan;Cho, Gye-Chun;Hong, Eun-Soo;Jin, Gyu-Nam
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.717-721
    • /
    • 2010
  • Soil volume conversion factors are used for estimation of an excavated the soil volume which will be removed or added in levelling the ground surface of a construction site. An accurate evaluation method will help us reduce a construction cost and time consuming. In this study, we performed the laboratory tests, including grain size measurement, water content, specific gravity, porosity, density and XRD tests, to suggest reliable soil volume conversion factors and weathering indices in field using nondestructive methods. The weathering index and soil volume conversion factor L are obtained for different types of soils. At results, the CIW index is the best method measuring the weathering index and the factor L is relative to natural porosity, void ratio, density and dry density.

  • PDF

An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects (프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 -)

  • Kang, Sang-Hun;Kim, Dae Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.60-67
    • /
    • 2019
  • The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.

Analysis on Performance Assessment Framework of Construction Phase for Road Construction Projects (도로건설사업 시공단계 성과평가 프레임워크 연구)

  • Mun, Junbu;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.801-809
    • /
    • 2023
  • Road construction projects have a long duration so cost overruns and schedule delays are occurred. However, performance assessment system that can manage and prepare for this in advance is insufficient. In addition, road construction are affected by many factors during under construction. Therefore it is necessary to conduct performance assessment considering the characteristics of roads and prepare for similar projects in the future. The purpose of this study is to provide a framework to evaluate construction phase performance and present a performance management plan using road construction information. Also, This study conducted time adjustment between the start and the finish of the project and developed performance metrics based on absolute and relative indicator. This study analyzed the cost, schedule, and changes of the road project construction process, showing the possibility of advancement of performance assessment and how to use it when planning new road construction projects.

Reliability Analysis on the Decision Method of Lateral Flow of Foundation Piles for Abutment (교대 기초말뚝의 측방유동 판정식에 관한 신뢰성 해석)

  • Ahn, Jong-Pil;Kim, Gyu-Deok;Kim, Il-Goo;Choi, Jin-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1090-1097
    • /
    • 2008
  • This study conducted the decision method of lateral flow in abutment structures founded on the soft soils and the reliability analysis on the foundation pile for abutment. On the basis of the results, this study proposed the reliability design model. Reliability analysis was conducted by applying second moment method, point estimation method, and expected total cost minimization to lateral movement index, lateral movement decision index, modified lateral movement decision index, and circular failure safety factor for the decision criteria of lateral flow. The reliability index by analysis method had a similar tendency each other. Point estimation method was found as a practical method in the aspect of convenience because it could conduct the analysis only by mean and standard deviation as well as the partial derivative on random variables was not necessary. Optimum reliability index and optimum safety according to increasing in failure factors and load ratio were analyzed and loads and resistance factors of the design criteria of optimum reliability were estimated. It presented rational design model which can consider construction level and stability and economical efficiency overall.

  • PDF

Reliability Index Optimization for Pier Type Quay Walls Using Life Cycle Cost (생애주기비용을 이용한 잔교식 안벽의 신뢰도지수 최적화)

  • Kim, Dong-Hyawn;Yoon, Gil-Lim
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.6
    • /
    • pp.422-428
    • /
    • 2011
  • Optimal reliability indices were found by optimizing life cycle cost(LCC) of pier type quay walls. Failure probability of pier and shore bridge were calculated by response surface method. Then, they were used to obtain recovery cost after damage. Costs for initial construction and maintenance were also considered in finding optimal reliability indices. Target reliability indices which may be used in reliability based design were suggested by numerical examples under seismic load and ship load.