• 제목/요약/키워드: Construction Cost Index

검색결과 198건 처리시간 0.023초

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

초급 건설사업관리기술자(CMr)의 요구역량 추출 및 ANP 중요도 분석 (An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer)

  • 양진국;김세범;이상범
    • 한국건설관리학회논문집
    • /
    • 제18권1호
    • /
    • pp.58-64
    • /
    • 2017
  • 건설관리 (CM)는 효율적인 프로젝트 관리 시스템으로서 활용되고 있다. 건설관리 시스템은 과학적 관리 기법을 제공할 뿐만 아니라, 전문 지식을 가진 전문가의 서비스를 제공한다. 따라서 CM 서비스 수요는 건설 프로젝트에서 지속적으로 증가하고 있다. 건설사업관리기술자의 등급은 건설 기술자 역량지수 (ICEC)에 의해 구분된다. 건설사업관리기술자는 다른 분야보다 높은 점수를 필요로 한다. 하지만 초급 건설사업관리기술자는 교육과 자격에 따라 등급을 획득할 수 있다. 본 연구는 현행 건설사업관리기술자 등급 시스템의 문제점을 분석한 후 초급 건설사업관리기술자를 대상으로 인터뷰를 실시하였다. 그 결과 본 연구에서는 23가지의 요구역량 요인들을 추출하였다. 그리고 요구역량은 친화도법을 사용하여 5가지 영역으로 그룹화 하였다. 다음으로, ANP 기법을 이용하여 중요도를 분석하였다. 그 결과 우선 순위가 높은 영역이 프로젝트 관리와 관련된 품질 및 비용 영역으로 분석되었다.

가연성 폐기물 고형연료(SRF) 사업의 경제성 분석 (The Economic Analysis of A Solid Refuse Fuel (SRF) Project in the Urban Area)

  • 장은미;조용성
    • 한국기후변화학회지
    • /
    • 제4권3호
    • /
    • pp.245-254
    • /
    • 2013
  • 정부에서는 지구온난화에 따른 이산화탄소 저감 및 자원순환형(Zero Waste) 사회구축을 위해 가연성 폐기물을 대상으로 한 고형연료화 사업을 추진 중에 있다. 본 연구에서는 가연성 폐기물 고형연료(SRF) 사업에 대하여 추가 편익을 고려한 경제성 평가를 실시하였다. 경세성 분석은 수도권매립지에 반입되는 폐기물을 대상으로 한 SRF 시설을 가정하였으며, 비용은 건설비와 운영비를 고려하고, 편익으로는 열 및 전력 판매비, 환경 편익, 매립대체 편익을 고려하였다. 결론적으로 SRF 사업은 환경편익 등 기타 사업시행에 대한 편익을 고려하면 1.0으로 산출되었으며, 이 결과는 전력가격 및 물가변동에 따른 인건비 등에 큰 영향을 받는 것으로 분석되었다. 따라서 SRF 사업의 지속성을 위해서는 정부의 투자비 지원뿐만 아니라, 전력판매에 따른 적정한 정책지원 방향 설정 등이 필요 하다.

건설산업 ISO 품질경영시스템의 성과측정에 관한 연구 (Performance Measurement of ISO Quality Management System in the Construction Industry)

  • 이우창;김경래;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.414-418
    • /
    • 2004
  • 국내 풀질시스템은 부실공사를 예방하기 위한 하나의 수단으로 출발하여 현재는 공공 건설공사를 수주하기 위해서 필수적으로 갖추어야 할 시스템으로 인식되어 왔다 이에 따라 상당수의 건설업체들이 ISO 품질경영시스템의 인증을 취득하였고 이를 기반으로 건설공사를 관리하고 있다. 그러나 이제는 공공 건설공사 입찰에 참여하는 대부분의 건설업체들이 ISO 인증을 취득하였으므로 ISO 인증은 더 이상 공공 건설공사에서 건설업체들이 수주경쟁의 우위를 점유할 수 있는 도구가 되지 못하고 있는 실정이고 이러한 과정에서 몇몇 건설업체들은 과다한 인증비용과 품질경영시스템의 구축 및 유지관리 비용을 감당하기 어려워 인증을 반납하고 있는 실정이다. 그렇기 때문에 이 시점에서 건설업체들이 생각해보아야 할 문제는 더 이상의 수주 경쟁의 무기가 되지 못하고 투자의 비용만 증가하고 있는 ISO 품질경영시스템의 효과에 대한 평가가 필요하다. 이를 위해 ISO 품질경영시스템에 대한 성과측정과 관련한 연구룰 통해 품질경영시스템의 성과측정을 위한 지표를 제시하고자 한다.

  • PDF

Appraising the Performance of Construction Projects during Implementation in Kenya, 1963-2018: A Literature Review Perspective

  • Ong'ondo, Cyrus Babu;Gwaya, Abednego Oswald;Masu, Sylvester
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권2호
    • /
    • pp.1-24
    • /
    • 2019
  • Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the 'health' of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.

핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구 (Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors)

  • 박희대;한승헌;김성수
    • 대한토목학회논문집
    • /
    • 제29권3D호
    • /
    • pp.399-408
    • /
    • 2009
  • 우리나라 건설사업은 점차 대형화되고 복잡화되는 가운데 예산 및 원가절감에 대한 압박도 점차 높아지고 있다. 이러한 가운데 정부와 공공발주기관들은 경제성 및 품질 향상에 부응하기 위한 발주자 주도의 원가관리기법인 '설계VE(Value Engineering)'을 도입하기 위해 노력해왔다. 국토해양부는 2000년 3월 건설기술관리법시행령을 통해 총공사비 500억원 이상의 1종 시설물 공사에 대하여 설계VE를 의무화하였고 2006년 1월부터는 총공사비 100억원 이상 공사로 그 대상을 확대하였다. 또한 정부는 '경영혁신기본법'과 '공공기관운영에관한법률' 제정을 통해 공공발주기관의 경영혁신 필요성을 제고하고 있어 설계VE의 도입 필요성은 더욱 증가하고 있다. 이에 본 연구는 공공발주기관의 설계VE 성공과 매우 밀접한 7개 부문 총 19개의 핵심성공요인(Critical Success Factors, CSFs)을 도출하고, 10개의 주요기능을 도출한 후 프로세스 모델링기법을 활용하여 공공발주기관의 개선된 설계VE 프로세스를 제시하였다. 연구에서 제시된 프로세스는 공공발주기관인 G사의 사례 연구를 통해 그 효과를 확인하였다. 본 연구결과는 설계VE를 이미 시행하고 있거나 새로 도입하고자 하는 정부, 지방자치단체 및 기타 공기업들이 보다 효과적인 설계VE 프로세스를 도입하는데 활용될 수 있을 것으로 기대된다.

건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립 (Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility)

  • 김명진;김준수;김병수
    • 대한토목학회논문집
    • /
    • 제36권5호
    • /
    • pp.903-913
    • /
    • 2016
  • 기후변화에 관한 파리협정(Paris Agreement)은 우리나라의 친환경정책에 많은 영향을 미칠 것으로 보인다. 그동안 건설공사의 설계단계에서 탄소발생량을 줄이기 위한 친환경설계가 적용되어 왔다. 그러나 친환경건축물 인증에 해당하는 프로젝트 외에는 소극적 적용에 그치고 있다. 설계에 친환경요소를 반영하기 위해서는 현재 100억 이상 모든 건설공사의 기본설계 및 실시설계단계에 적용되고 있는 설계VE(Value Engineering) 제도를 활용할 필요가 있다. 하지만 현재 적용되고 있는 VE Job Plan은 친환경 요소를 일부 반영하는데 그치고 있으므로 그 효과는 미미할 수 밖에 없다. 따라서 기존 VE 기법에 친환경요소를 반영한 새로운 형태의 친환경VE 기법의 개발이 필요하다. 연구의 결과 환경비용의 개념은 회계학적으로 정의되고 그 비용의 산정은 이산화탄소 배출량을 기반으로 하는 탄소세, $CO_2$배출권 거래가격, 지불의사금액, 탄소생산성 개념을 이용하는 방법이 많이 사용되고 있었다. 그러나 설계단계에서 친환경VE에 활용하기 위해서는 탄소생산성 개념을 포함한 새로운 개념의 모델이 필요하다. 새로운 개념의 친환경VE모델은 $CO_2$배출량과 잠재적환경오염지수를 사용하는 모델이다. 본 연구에서는 친환경VE의 한 축을 담당할 환경비용에 대한 개념과 친환경가치모델을 정립하고자 하였다.

해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 - (Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase -)

  • 장우식;홍화욱;한승헌
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.146-154
    • /
    • 2011
  • 국내 건설기업은 1960년대 처음으로 해외건설시장에 진출한 이래 지속적으로 성장해왔으며 2010년에는 해외건설시장에서 716억 달러를 수주하는 등 국가 경제에 많은 기여를 해왔다. 특히 플랜트산업의 경우 2010년에 사상 최대인 574억 달러를 수주하여 전제 해외건설 수주금액의 80% 이상을 차지하였다. 그럼에도 불구하고 국내 건설기업은 해외 선전기업에 비해 설계단계의 기술경쟁력 부족 및 사업관리 능력의 부족으로 해외 플랜트 사업을 수행하는데 있어 어려움이 크다. 본 연구는 최근 국제 유가의 상승, 에너지 수요의 증가, 친환경 건설에 대한 관심의 증가로 시장규모가 확대되고 있는 해외 LNG 플랜트사업의 수익률 안정을 위해 설계단계의 리스크를 규명하고, 이를 보다 합리적으로 평가하기 위한 방법을 제시하였다. 본 연구의 결과로서 첫째, 기존문헌의 분석, 기업 설계보고서, 전문가 인터뷰를 통해 해외 플랜트 설계단계에서 총 57개 리스크 요인을 도출하였다. 둘째 기존의 우선순위 평가방법(이축, PI)에 플랜트의 특성을 반영 할 수 있는 조정지수(Coordination Index, CI)를 추가하여 해외 LNG 플랜트 설계단계에 보다 적합한 삼축(PIC)우선순위 평가방법을 제시하였다. 마지막으로 전문가 설문조사 및 인터뷰를 통해 삼축 평가방법의 적절성 및 실무 적용성을 확인하였다. 따라서 국내 건설기업이 자신의 경험을 바탕으로 본 연구에서 제시된 리스크 요인과 평가방법을 해외 LNG 플랜트 설계단계에 적용한다면, 보다 합리적이고 객관적인 리스크 관리가 가능할 것으로 기대된다.

서해안 저소성 준설매립 지반의 역학적 특성 (Mechanical Characteristics of Dredged and Reclaimed Ground with Low Plasticity from Western Coastal Site)

  • 정상국
    • 한국지반신소재학회논문집
    • /
    • 제14권4호
    • /
    • pp.97-104
    • /
    • 2015
  • 실제 현장에서 준설매립공사를 수행하기 전의 설계 단계에서, 연약지반 개량설계를 수행할 때, 압축지수와 비배수 전단강도와 같은 설계정수를 합리적으로 평가하는 것은 최적공사비 산정측면에서 매우 중요한 사항이라고 할 수 있다. 본 연구에서는 유사 준설매립 현장에서 실시된 원위치 전단강도시험 및 불교란 시료 채취를 통해서 압밀 및 강도정수를 평가하였다. 이때, 배사관을 이용한 준설매립방법으로 투기된 준설매립층의 함수비 및 압축지수는 원지반 조건보다 오히려 감소하는 경향을 나타냈다. 압밀시험에 의해 준설매립지반의 압축지수와 함수비의 관계, 원위치 베인전단 시험으로 비배수 전단강도와 함수비의 관계를 각각 평가하였으며, 저소성 실트지반에 대한 Schmertmann의 압축지수 보정방법의 적용성을 판단하기 위해서 실제 침하량과 설계 예측침하량의 비교 분석을 실시하였다.

단지내 도로포장별 생애주기 비용 분석(LCCA) 사례 연구 (A Case Study of Life Cycle Cost Analysis on Pavements in Apartment Complex)

  • 정종석;박용부;손정락
    • 토지주택연구
    • /
    • 제5권4호
    • /
    • pp.297-303
    • /
    • 2014
  • 최근, 공동주택 단지내 투수성 포장 및 블록포장 등과 같은 포장이 많이 시공되고 있으나 품질관리와 공용성 평가에 관한 기준이 미비하여 하자 교체 및 교체주기 시기 결정 등에 어려움이 많은 실정이다. 따라서, 본 연구에서는 공동주택에 많이 적용되고 있는 투수성포장 및 블록 포장의 합리적 선정기준을 제안하기 위해 교체주기, 초기 공사비, 유지교체비용 등을 고려한 포장공법별 생애주기 비용 분석(LCCA)을 실시하였다. 생애주기비용 분석결과는 교체주기 20년이상인 인터록킹 콘크리트 블록포장이 최적의 대안이지만, 보도 포장의 교체기준 10년을 기준으로 하였을 경우 최적의 대안은 일반적인 아스팔트 콘크리트 포장임을 알 수가 있다. 따라서, 교체주기가 대안의 선정 및 생애주기비용 분석에 많은 영향을 미치므로 향후, 교체주기의 객관적인 정량화에 필수적인 공용성 지수 개발이 필요하다.