Korean Journal of Construction Engineering and Management
/
v.19
no.2
/
pp.61-72
/
2018
Conflicts in public construction projects lead to increase social costs as well as construction costs and schedule delay. Therefore, it is important to evaluate the conflict in construction project and find appropriate solutions based on previous cases. In this research, the conflict factors and criteria for evaluating conflict are derived and 30 cases are evaluated by 11 conflict experts. Using k-means clustering, the cases are clustered by three clusters. The cases were analyzed according to the characteristics of each cluster and labeled as 'NIMBY and harmful facility conflict cluster', 'environmental and pollution conflict cluster', and 'PIMFY and small conflicts'. In the future, when conflict occurs in the public construction projects, the conflict can be evaluated using this clustering and the characteristics of the conflicts can be found. As a result, it will be helpful to mitigate the conflict quickly and effectively by looking for previous cases that are suitable for resolving the conflict through appropriate clusters.
International conference on construction engineering and project management
/
2005.10a
/
pp.1048-1052
/
2005
In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.
The purpose of this study was to analyze the architect's Administrative Tribunal cases related to housing projects. We collected the 271 decisions of Administrative Tribunal cases from 1985 to 2001 through the Ministry of Legislation data base. As a conclusion of research, most of cases are caused during design process and supervision of construction which are major roles of architects. We can find out that the number of cases of Administrative Tribunal about housing is 10% more than other types of building. And this situation is more serious in supervision building phase. It proves that housing project has more possibility of violation of law than other types. Because it belong to an economic problems. In Korea, clients of housing project tend to take more profits by taking an illegal acts; like enlargement of a building, construction border violation. illegal construction balcony and so on. And architect who roles to be a supervisor is liable to these problems but he has not much authority and economical benefits. Through this research we can analyze this situation and make know what is problem.
Proceedings of the Korean Institute of Building Construction Conference
/
2007.04a
/
pp.109-112
/
2007
As buildings become higher, larger, and more complex, safety issues for construction workers working at such environments become more important. We analyzed 140 critical accident cases reported to the KOSHA(Korea Occupational Safety & Health Agency) for construction cranes and lifts by types of cranes and by patterns of accidents and causes. By finding out the accident's types and causes, we expect to develop an efficient measure for preventing similar accidents in the near future. The cases will be studied further and reexamined using the FMEA(Failure Mode and Effect Analysis) as a quantitative analysis method.
International conference on construction engineering and project management
/
2011.02a
/
pp.234-240
/
2011
Preventing incidents occurred in construction process is important for safe implementation of construction projects. Due to the complexity and magnitude of the project and moreover, poor safe planning and management, construction incidents in Korea have been increasing. Reducing construction incidents effectively, appropriate safety management program in consideration of the incident rate of each facility is to be adapted. This study analyzes incident frequency and severity rate of each facility based on the data of construction sites(about 1,560 thousand cases) recorded by Korea Occupational Safety & Health Agency for 3 years from 2007 to 2009, and the incident related data (about 40 thousand cases) of Korea Workers' Compensation & Welfare Service. The results of this study revealed that construction incident rates of 'cold refrigeration storage facilities' are the highest among building types, followed by traditional building religious building, arcade department store and shopping center. In case of other facilities, the incident rate and the rate of intensity of 'pipelining project' are the highest, followed by 'tunneling project'. These results would be used in providing safety programs beneficial for preventing construction incidents.
LEE, Ki Seok;CHOI, Youngjin;LEE, Kyung-cheun;SHIN, Yoonseok;YOO, Wi Sung
International conference on construction engineering and project management
/
2022.06a
/
pp.375-381
/
2022
Safety accidents are of concern during construction projects, even given the recent innovations in digital technologies. These projects remain focused on overcoming specific and limited applications on construction sites. For this reason, the development of an inclusive safety management system has become crucial. This study aims to build a Big Data platform to inform decisions on how to proactively eliminate worker hazards on construction sites. The platform consists of about 100,000 real records and a real-time monitored database featuring various safety indices, such as workers' altitudes, heart rates, and fatigability during construction, which are determined through various wearable devices. The data types are customized and integrated by a research team in accordance with the characteristics of a specific project using hypertext transfer protocol (HTTP). The results can be helpful as efficient tools to ensure successful safety management in complex construction situations. This study is expected to provide three significant contributions to the field, including real-time fatigability analysis and tracking of workers on-site; providing early GPS-based warnings to workers who might be accessing dangerous spaces or places; and monitoring the workers' health indices, based on details from 100,000 cases.
International conference on construction engineering and project management
/
2011.02a
/
pp.629-635
/
2011
Retentions are generally considered to be intended to act as a powerful tool to incentivize contractors/subcontractors to remedy defective work in cases of non-performance. This study attempts to establish the extent to which retentions can be used for this purpose by investigating case law connected with insurance and defective work. One of the significant questions is whether retentions are sufficient to deal with construction defects or value of retentions in the rectification of defects is illusory. The cost to repair a defect may vary depending on a number of components including type, cause, magnitude and the construction stage at which the defect occurs. It is expected that a review of existing cases on defective workmanship will provide an insight on the issues and whether retentions are effective in their intended function. In order to establish their functionality, the study described in this paper investigated 6 construction insurance cases to identify the critical issues and the causes of dispute. It was found that the nature and the cause of defects were different in each case. It was also established that certain defect types not covered by insurance may be covered by retentions - potentially one of the key uses of a retention strategy. It is expected that the findings will assist in forming a view on the quantum of money that may be required paving the way for a first time understanding on a rational basis for setting up retention regime.
Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.130-138
/
2009
Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.
Jeong Eun Cheol;Jeong Hye Gyo;Lee Hui Seok;Kim Seung Jin
Proceedings of the Korean Institute of Building Construction Conference
/
2005.05a
/
pp.219-222
/
2005
Recently, remodeling has been a major field of the building construction that comes up for the alternatives of the reconstruction and the economical construction method. In the almost cases, the engineering capacity for the repair/rehabilitation of the remodeling should satisfy also the owner's various needs (eg, the minimum construction time, etc.) and the safety of the building. Also, the engineering and construction technique for remodeling should be applied to the contrary point of view of the general construction method. But, the many problem actually has arose from the wrongly applied construction method that is caused with the insufficient researches and development. Therefore, this study would suggest the necessities and the directions of developing the elementary engineering technique and the method that satisfy the owner's various needs for the remodeling and repair/rehabilitation of the multi-owned building as multiplex shop, with the successful construction cases.
Proceedings of the Korean Institute of Building Construction Conference
/
2005.05a
/
pp.107-112
/
2005
Renovation of existing sports facilities or construction of temporary ones for international complex games requires a wide variety of hundreds of sub construction projects to be awarded at the same time but there are few precedents required regarding the study of tendering process required in such cases. As award of construction contracts to build sports facilities for various international complex games is a critical determinant of fate of international complex games in the initial phase, it is very critical that adequate construction tendering process bedetermined. This research is aimed to study tendering cases for renovation or construction of critical international sports facilities to enhance efficiency of facility construction and define most reasonable tendering approach to satisfy schedule constraints often associated with international complex games and contribute to improvement of international competitiveness of their host cities and propose a direction for further development. This study also provides inputs to subsequent sports events of comparable scale to minimize trial and error.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.