• Title/Summary/Keyword: Construction Breakdown Structure

Search Result 153, Processing Time 0.024 seconds

The Geomorphic Characteristics of Bulguksa-region and the Earthquake Resistant Structure of the Bulguksa Temple (불국사 지역의 지형특성과 불국사의 내진 구조)

  • Hwang, Sang-Ill
    • Journal of the Korean Geographical Society
    • /
    • v.42 no.3 s.120
    • /
    • pp.315-331
    • /
    • 2007
  • Some reverse fault lines are passing through the alluvial fans and west hill slope of Bulguksa mountains including Mt. Toham in the directions of N-S and NW-SE. The study area is known as relatively unstable, because of active faults. Assuming on the record of Samguksagi about earthquakes, the architects in the construction of the Bulguksa Temple should have recognized the possibility of breakdown from the earthquakes and the need for an unique structure against at that time. Against earthquakes, Grengee technique, a stonework construction technique following wooden one and use of Chuduseok(Dongtleseok or Chumchaseok) were applied for the construction of the Bulguksa Temple. By designing the foundation stone with hole, a structure is prevented from modification that pillars secede from a foundation stone in spite of horizontal load of earthquake while wood construction is strong frame at earthquake. The Bulguksa Temple is usually evaluated to be a beautiful architecture from the appearances like the weight balanced structure with unique decoration. Impressive architectures are beautiful in balance and harmony coming from the important and specific rolls in its own way by each part of whole structure. This beauty comes from the science.

A Study on Traceability Management Using SWBS for a Naval Ship Acquisition

  • Jeong, Yeonhwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.31-37
    • /
    • 2011
  • Korean Naval Ship acquisition processes are very complicate. There are 4 phases, Feasibility Study, Concept Design, Basic Design, Detail Design and Construction. A number of organizations and support groups exist to acquire naval war ships. Thus, It is very important how to establish traceability about requirements. This work has investigated how to improve traceability about requirements using Shipboard Work Breakdown Structure.

Design of Interface between 3D Object Model and Structure Analysis Program (3D 객체 모델과 구조해석 프로그램의 인터페이스 설계)

  • Park, Jae-Geun;Kim, Min-Hee;Lee, Kwang-Myong;Choi, Jung-Ho;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.3
    • /
    • pp.247-252
    • /
    • 2008
  • Recently, the virtual construction system in which project participants efficiently share and control the information throughout the life-cycle of construction project using 3D object models is being developed all over the world. In this paper, a design of interface between 3D object model of structures and structural analysis system that is essential for the analysis and design of civil structures in the virtual space is treated. The relation parametric modeling technique that is needed to make the 3D object models and the construction method of product breakdown structure(PBS) that considers the several parameters for the structural analysis are presented. PBS is built so that it is possible to extract needed attribute information from 3D object model and to apply it to the structural analysis. Design methodology for interface program is proposed that several numerical values determined by the cooperative work same as structural analysis are delivered to 3D object models without additional work. An interface program between 3D object models and structural analysis system developed based on the proposed method would be effectively used to develop virtual construction system.

Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library (BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링)

  • Jo, Jae-Hun;Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.3 no.4
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

Management Research in Plant Construction;Introduction of research center (플랜트 프로젝트 관리체계 표준화 기술 개발;연구단 소개)

  • Lee, Young-Nam;Kim, Chan-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.213-220
    • /
    • 2006
  • Plant construction industry is a high value-adding industry because it is complex industry comprising engineering, procurements of equipments and construction. So, Revenue increase in overseas plant projects would boost up not only domestic construction industry but also growth of national economy. Recently, overseas plant-construction market is expanding dramatically. For instant, Middle-east countries are constantly increasing their orders for the construction of petro-chemical plants stimulated by sky-rocketing oil prices. The purpose of this research is to develop management techniques for plant projects such as work break-down structure, knowledge management system, logistics & procurement system, and risk assessment tools. We believe our research would contribute to the competion of Korean engineeing companies and contractors in overseas plant-construction market.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

An Aplication Model to Ensure Practical Usage in Construction Management (공사관리의 실용성 확보 전략과 적용 모델의 개발)

  • Chang Young-Bae;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-404
    • /
    • 2002
  • To manage a construction project efficiently, it is essential to ensure the practical usage in construction management. The purpose of this study is to develop a practical model, which will increase the efficiency of management. The followings are the method of this study: (1) Establishing a breakdown structure based on integration of CBS and WBS which is well acquainted (2) Developing and systemizing managerial standards and processes on such activities as calculating and marking progress rates & schedule, summarizing cost by activities level, making out project analysis reports. This study shall contribute to raising the efficiency in construction management after being verified in a pilot project and being developed into construction management system.

  • PDF

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Development of Disaster Management IETM for Effective Disaster Information Management of Construction Facilities (시설물의 효율적 재해정보관리를 위한 재해관리전자매뉴얼 구축 연구)

  • Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.255-265
    • /
    • 2009
  • Because the current disaster management task is being processed by using a separated operation system and an insufficient information system by each division, construction facilities suffer great damage by disaster. This research has classified the disaster management business phase and information by each phase through analyzing the existing disaster management information and business process. Then, it has built a disaster management information breakdown structure for integrating of individual disaster information, and also established a standard XML (eXtensible Markup Language) schema of disaster management electronic documents for a real-time utilization. The suggested methods in this research are verified by developing a manual system of electronic type. The disaster management IETM developed in this study provides the consistency for processing the disaster management tasks and the prevention of information omission. And it can be used as a electronic decision making tool for providing of integrated disaster management information.