• Title/Summary/Keyword: Construction Automation for High-Rise Building

Search Result 25, Processing Time 0.044 seconds

Automation Technology Application for Efficient Project Management of Steel Framing High-rise Building Construction (고층 철골공사의 사업관리 효율화를 위한 자동화 기술 적용 방안 연구)

  • Kim, Chane-Seop;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.3-4
    • /
    • 2010
  • With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.

  • PDF

Development of a Vertically Moving Scenario of Robotic Exterior Wall Cleaning for High-rised Building (고층 건축을 위한 수직외벽 청소로봇의 작업 시나리오 개발)

  • Kim, Kyoon-Tai;Kim, Chang-Han;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.195-196
    • /
    • 2011
  • Recently, the number of high-rise buildings has been on the rise, which has meant that maintenance cost has increased by two and three times, along with the increase in the construction cost. It is suggested that the use of an auto-cleaning robot could increase the productivity and safety of cleaning work, which is mostly done outside of a building. In particular, the guide rail on a high-rise building could be useful in this capacity, as it has the advantage of not being significantly influenced by factors of the external environment, including wind pressure. For this reason, this research is preliminary research into a cleaning automation for a high-rise building, and aims to draw up a scenario for the vertically moving robot.

  • PDF

Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance (고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석)

  • Kim, Dae-Geon;Kim, Bok-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

Critical Management Factor of Elemental Techniques for Construction Automation System in High-Rise Building (고층건물 적용을 위한 시공자동화시스템 요소기술의 중점 관리사항 도출)

  • Cho, Nam-Seok;Kim, Chang-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.15-16
    • /
    • 2011
  • Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.

  • PDF

Synchronous Motion Control of Multi-Climbing Hydraulic Robots for High-Rise Building Construction Automation (고층건물 시공자동화를 위한 다중 클라이밍 유압로봇의 운동 동기제어)

  • Hong, Yun-Suk;Chang, Hyo-Whan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.9
    • /
    • pp.103-111
    • /
    • 2009
  • Multi-climbing hydraulic robots are used to lift construction factory (CF) synchronously for applications in the automation of a high-rise building construction. In this study, synchronous motion controller is proposed for the hydraulic robots, whose strategy is not only to make each robot follow the reference path basically by sliding-mode control, but also to synchronize motions of two adjacent cent robots consecutively by cross-coupled control technique. Simulations are performed by using SIMULINK for a system similar to a practical application that includes unbalance in CF and wind disturbance. The results show that the proposed controller significantly reduces synchronous errors, compared to the individual controller for each hydraulic robot.

A Study on the Productivity Analysis of a Building Automation System (건물구조체(建物構造體) 자동화(自動化) 시스템의 생산성(生產性) 분석(分析)을 위한 기초적(基礎的) 연구(硏究))

  • Kim, Chang-Kyu;Song, In-Shick;Lee, Hyun-Soo;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.111-115
    • /
    • 2008
  • The productivity is the one of the primary elements to evaluate the new systems performance for building construction along with the economic efficiency, the safety, and the quality improvement. At present the on-site construction automation systems(we will call it as Construction Factory or CF hereafter) is under the development by research group for construction automation of high-rise building. The system includes many sub-systems such as a robotic crane, a construction factory, bolting robots, a building material management system using RFID and so on. In this study we discuss and propose the method to evaluate for these hybrid on-site automation system fundamentally. In future we devise a framework of evaluation modules for the on-site building automation system on the basis of this discuss.

  • PDF

A Study on the Performance Evaluation System for the Construction Factory System Applied to High-Rise Building Construction in Korea (우리나라 초고층용(超高層用) 건설(建設)팩토리 개발(開發)을 위한 성능평가체계(性能評價體系)에 관(關)한 기초적(基礎的) 연구(硏究))

  • Choi, Won-Jun;Kim, Chang-Kyu;Song, In-Shick;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.105-108
    • /
    • 2007
  • This study aims to develop a performance evaluation system for the Construction Factory(CF). The CF is a kind of full automation system for building construction which consists of the lifting system for building materials, the built-up unit for steel structural components, the bolting robots, the control center for the site management, and the site covering system. The CF is developing now as a project of the construction automation and robotics. In this study we firstly reviewed the state-of-the-art of the construction automation and robotics in the foreign and the domestic, and investigated the precedent case of the CF such as the SMART System of Shimizu Co., Japan. We believe that without an objective evaluation of the results there won't be growth in technological R&D. Therefore, this study sees the developing CF as an new technology and method in building construction, and proposes the direction and frame of the appropriate evaluation which can be applied into the CF.

  • PDF

Benefit/Cost Analysis of Robot-based Automated Construction System (로봇 크레인 기반 시공자동화공법의 편익/비용 분석)

  • Kim, Tae-Hoon;Lee, Ung-Kyun;Yoo, Wi-Sung;An, Sung-Hoon;Doh, Nak-ju;Cho, Hun-hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.133-134
    • /
    • 2011
  • While researches related with construction automation have dramatically increased, a Robot-based Automatic Construction system (RCA system) has developed for high-rise buildings in Korea. At the aspect that wide adoption of the RCA system is dependent on economic efficiency comparing with a conventional method, feasibility study on the RCA system should be implemented. However, due to practical limitations, the RCA system has tested to a seven story building. Based on the test results, this study implements a cost/benefits analysis to a simulated forty story building in order to derive more reliable data on the RCA system's practicability.

  • PDF

Development of Gondola-type Building Management Robot Platform and Mechanism for Moving/Tasking on Building Outer-wall (곤돌라형 외벽 유지관리 로봇의 이동/작업 메커니즘 및 플랫폼 개발)

  • Ham, Young-Bog;Park, Soung Jea
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.30 no.4
    • /
    • pp.375-382
    • /
    • 2013
  • Down through the years, human needs and desires have required a robot system to work at hazardous environments instead. Current painting task is costly and laborious, and it exposes workers to significant health and safety risks. Automation system offers potential improvement in this area and is especially well suited to the outer-wall painting tasks in concrete structures. This paper introduces the result of gondola-type building management robot(G-BMR) platform and mechanism for moving/tasking on building outer-wall for the outer-wall painting. Its technical and economic feasibility are conducted, and it is concluded that developing G-BMR is physically and economically feasible in this research. And we discuss about the future of G-BMR and automation in construction field.