• Title/Summary/Keyword: Constraints to the Transmission

Search Result 292, Processing Time 0.021 seconds

Development of Pipe configuration of Air Conditioner Compressor for Vibration Isolation (진동절연을 위한 에어컨 압축기의 파이프 배열기술 개발)

  • 장한기;구치욱;윤덕원;최영훈
    • Journal of KSNVE
    • /
    • v.9 no.4
    • /
    • pp.795-805
    • /
    • 1999
  • Rubber mounts so called grommets and pipes are two major paths of vibration transmission from a compressor, an important vibration source in an air conditioner, to the whole unit. A procedure of configuring the suction and discharge pipes of the compressor was developed in this paper so as to reduce the vibration transmission through the pipes as well as the grommets. Through investigating the effects of shapes and connecting disrections of pipe elements on vibration transmission, a guideline to configure the pipe layout, which enables to reduce vibration transmission, was proposed. The initial pipe layout by the guideline was optimized with the objective function, minimization of boty vibration transmission and the cost, and with the constraints to yield the final dimensions of the pipes. The procedure not only minimizes the transmitted force to the circumferential devices but enables to eliminate rubber blocks or dampers, which are generally used to avoid resonances of the pipe system.

  • PDF

A STUDY ON OPTIMAL UPGRADING VOLTAGE OF EHV GRID NETWORK-LYBIAN CASE (초고압 송전선로의 최적 격상전압 선정에 관한 연구-리비아국 사례)

  • Kim, Bong-Hee
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.1041-1043
    • /
    • 1997
  • When a new transmission line is planned to construct, the system voltage and the conductor size of the transmission line should be decided by both economical and technical point of view. This paper presents a methodology to determine the optimal voltage for upgrading the transmission system voltage of existing the extra high voltage grid network by meeting the requirements of the transmission cost minimization as well as technical constraints of thermal limit and stability limit in the transmission line. As a case study, calculated are optimal voltages versus distance and capacity of a practically applicable transmission line with 4 bundles 2 circuits. By this study 400kV was selected as the next higher voltage for the existing 220kV Libyan grid network.

  • PDF

Radio Resource Management of CoMP System in HetNet under Power and Backhaul Constraints

  • Yu, Jia;Wu, Shaohua;Lin, Xiaodong;Zhang, Qinyu
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.8 no.11
    • /
    • pp.3876-3895
    • /
    • 2014
  • Recently, Heterogeneous Network (HetNet) with Coordinated Multi-Point (CoMP) scheme is introduced into Long Term Evolution-Advanced (LTE-A) systems to improve digital services for User Equipments (UEs), especially for cell-edge UEs. However, Radio Resource Management (RRM), including Resource Block (RB) scheduling and Power Allocation (PA), in this scenario becomes challenging, due to the intercell cooperation. In this paper, we investigate the RRM problem for downlink transmission of HetNet system with Joint Processing (JP) CoMP (both joint transmission and dynamic cell selection schemes), aiming at maximizing weighted sum data rate under the constraints of both transmission power and backhaul capacity. First, joint RB scheduling and PA problem is formulated as a constrained Mixed Integer Programming (MIP) which is NP-hard. To simplify the formulation problem, we decompose it into two problems of RB scheduling and PA. For RB scheduling, we propose an algorithm with less computational complexity to achieve a suboptimal solution. Then, according to the obtained scheduling results, we present an iterative Karush-Kuhn-Tucker (KKT) method to solve the PA problem. Extensive simulations are conducted to verify the effectiveness and efficiency of the proposed algorithms. Two kinds of JP CoMP schemes are compared with a non-CoMP greedy scheme (max capacity scheme). Simulation results prove that the CoMP schemes with the proposed RRM algorithms dramatically enhance data rate of cell-edge UEs, thereby improving UEs' fairness of data rate. Also, it is shown that the proposed PA algorithms can decrease power consumption of transmission antennas without loss of transmission performance.

Integrated Optimization of Combined Generation and Transmission Expansion Planning Considering Bus Voltage Limits

  • Kim, Hyoungtae;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1202-1209
    • /
    • 2014
  • A novel integrated optimization method is proposed to combine both generation and transmission line expansion problem considering bus voltage limit. Most of the existing researches on the combined generation and transmission expansion planning cannot consider bus voltages and reactive power flow limits because they are mostly based on the DC power flow model. In this paper the AC power flow model and nonlinear constraints related to reactive power are simplified and modified to improve the computation time and convergence. The proposed method has been successfully applied to Garver's six-bus system which is one of the most frequently used small scale sample systems to verify the transmission expansion method.

Computer-Aided Design of Involute Cylindrical Gears for Power Transmission (컴퓨터를 이용한 동력전달용 인벌류우트 원통치차의 설계)

  • 정태형;김민수
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.14 no.3
    • /
    • pp.594-602
    • /
    • 1990
  • A computer-aided design system of involute cylindrical gears(spur and helical gears) for power transmission is developed, in which the volume of a gear unit is minimized with satisfying various design constraints. As the design constraints, bending strength and pitting resistance of AGMA 218.01, scoring of Dudley's flash temperature, contact ratio, and involute interference of pinion are considered and effective factors for strength calculation(life, reliability, hardness ratio, load distribution, velocity, etc.) are also included. This complicated nonlinear optimization problem is solved by using ALM(Augmented-Lagrange-Multiplier) method with self scaling BFGS(Broydon-Fletcher-Goldfarb-Shanno) method employed for unconstrained optimization programming. This design method can be easily applied to designing power transmission gear unit in the machines of various kinds. It is expected for the proposed method to be a contribution for an automated design of gear unit towards weight minimization, miniaturization and high strength of gear unit.

A Loss-Minimized Power Flow Algorithm Considering Transmission Losses Re-distribution (송전 손실 재분배를 고려한 최소 손실 조류 계산 알고리즘)

  • Chae, Myung-Suk;Lee, Myung-Hwan;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.223-225
    • /
    • 1998
  • This paper presents a new approach for power flow calculation, which minimizes the transmission losses in power systems with the control of voltage magnitudes on P-V nodes. In this approach, the transmission losses are re-distributed to each P-V node, at each iteration, to reduce the effect of slack. The steepest descent method is adopted, in this study, to minimize the transmission losses augmented with penalty functions to account for voltage constraints. IEEE 14 and 30 buses test systems were used for the performance demonstration of the proposed method in this paper. The simulation results showed that the proposed method can reduce transmission losses and improve voltage profiles of power systems.

  • PDF

Grant-Free Random Access in Multicell Massive MIMO Systems with Mixed-Type Devices: Backoff Mechanism Optimizations under Delay Constraints

  • Yingying, Fang;Qi, Zhang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.1
    • /
    • pp.185-201
    • /
    • 2023
  • Grant-free random access (GFRA) can reduce the access delay and signaling cost, and satisfy the short transmission packet and strict delay constraints requirement in internet of things (IoT). IoT is a major trend in the future, which is characterized by the variety of applications and devices. However, most existing studies on GFRA only consider a single type of device and omit the effect of access delay. In this paper, we study GFRA in multicell massive multipleinput multiple-output (MIMO) systems where different types of devices with various configurations and requirements co-exist. By introducing the backoff mechanism, each device is randomly activated according to the backoff parameter, and active devices randomly select an orthogonal pilot sequence from a predefined pilot pool. An analytical approximation of the average spectral efficiency for each type of device is derived. Based on it, we obtain the optimal backoff parameter for each type of devices under their delay constraints. It is found that the optimal backoff parameters are closely related to the device number and delay constraint. In general, devices that have larger quantity should have more backoff time before they are allowed to access. However, as the delay constraint become stricter, the required backoff time reduces gradually, and the device with larger quantity may have less backoff time than that with smaller quantity when its delay constraint is extremely strict. When the pilot length is short, the effect of delay constraints mentioned above works more obviously.

Leader-Follower Model Analysis on Mixed Strategy Nash Equilibrium of Electricity Market with Transmission Congestion (송전선 혼잡시의 복합전략 내쉬균형에 대한 선도-추종자 모형 해석)

  • Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.2
    • /
    • pp.187-193
    • /
    • 2012
  • Nash Equilibrium (NE) is as useful tool for investigating a participant's strategic generation quantity in a competitive electricity market. Cournot model may give a mixed strategy NE instead of a pure strategy when transmission constraints are considered. A mixed strategy is difficult to compute, complicated to understand conceptually, and hard to implement in an electricity market practically. This paper presents that a mixed strategy does not appear in Stackelberg leader-follower model even under a transmission congestion. A solution method is proposed for the leader-follower model under a nondifferentiable space of a strategy variable. Based on the pure strategy NE with a transmission line congested, the merit of leader-follower model is shown from a social welfare point of view.

Electromagnetic Coupling to Nonuniform Transmission Lines, II:Correction to the Cylindrical TEM Mode Solution (비균일 전송선의 전자기적 결합, II:원통형 TEM 모드 해의 수정)

  • 홍성용;김세윤;라정웅
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.30A no.2
    • /
    • pp.10-15
    • /
    • 1993
  • The cylindrical TEM mode solution for electromagnetic coupling to an angled two-wire transmission line is corrected by imposing some physical constraints additionally. The validity of the correction process is assured by showing that the corrected solution approaches the numerical result for the equivalent model of cascaded piecewise uniform sections.

  • PDF

ATC Determination and Analysis Considering Voltage Constraints (전압제약을 고려한 가용송전용량 결정 및 분석)

  • Kim, Kyu-Ho;Park, Jin-Wook;Kim, Jin-O;Shin, Dong-Joon
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.169-171
    • /
    • 2004
  • Available transfer capability(ATC) is an important indicator of the usable amount of transmission capacity accessible by several parties for commercial trading in power transaction activities. This paper deals with an application of optimization technique for available transfer capability(ATC) calculation and analyzes the results of ATC by considering several constraints. Sequential quadratic programming(SQP) is used to calculate the ATC problem with state-steady security constraints. The proposed method is applied to 10 machines 39 buses model systems to show its effectiveness.

  • PDF