• Title/Summary/Keyword: Connection method

Search Result 2,930, Processing Time 0.037 seconds

Dynamic increase factor for progressive collapse of semi-rigid steel frames with extended endplate connection

  • Huang, Ying;Wu, Yan;Chen, Changhong;Huang, Zhaohui;Yao, Yao
    • Steel and Composite Structures
    • /
    • v.31 no.6
    • /
    • pp.617-628
    • /
    • 2019
  • As an extremely destructive accident, progressive collapse is defined as the spread of an initial local failure from element to element, resulting eventually in the collapse of an entire structure or disproportionately large of it. To prevent the occurrence of it and evaluate the ability of structure resisting progressive collapse, the nonlinear static procedure is usually adopted in the whole structure design process, which considered dynamic effect by utilizing Dynamic Increase Factor (DIF). In current researches, the determining of DIF is performed in full-rigid frame, however, the performance of beam-column connection in the majority of existing frame structures is not full-rigid. In this study, based on the component method proposed by EC3 guideline, the expression of extended endplate connection performance is further derived, and the connection performance is taken into consideration when evaluated the performance of structure resisting progressive collapse by applying the revised plastic P-M hinge. The DIF for structures with extended endplate beam-column connection have been determined and compared with the DIF permitted in current GSA guideline, the necessity of considering connection stiffness in determining the DIF have been proved.

An Experimental Study on Connection System of FRP Modular Box Member (FRP 모듈형 박스 부재의 연결 시스템에 관한 실험적 연구)

  • Kwak, Kae-Hwan;Jang, Hwa-Sup;Yang, Dong-Woon;Kim, Ho-Sun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.4
    • /
    • pp.29-36
    • /
    • 2009
  • This is a basic experimental study to apply FRP modular box member to a variety of construction structures exposed to flexural strength, such as a slab and a girder. Applying FRP modular box member to a real structure requires a large section. FRP box member was made into modular systems. Tests were conducted under various conditions in order to analyze jointing performance of the developed FRP modular box member as a large section. For the methods of jointing FRP modular box member, synthetic resins connection, mechanical connection, and a combination of both were used to test both length and breadth connection. As a result of the test, using urethane + two bolts + sheets was the most efficient method of connecting FRP modular box member. It is expected that the proposed joint system in this study will contribute to the increase of failure load and synthesis behavior of FRP modular box member.

Segmentation of region strings using connection-characteristic function (연결특성함수를 이용한 문서화상에서의 영역 분리와 문자열 추출)

  • 김석태;이대원;박찬용;남궁재찬
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.11
    • /
    • pp.2531-2542
    • /
    • 1997
  • This paper describes a method for region segmentation and string extractionin documents which are mixed with text, graphic and picture images by the use of the structural characteristic of connceted components. In segmentation of non-text regionas, with connection-characteristic functions which are made by structural characteristic of connected components, segmentation process is progressed. In the string extraction, first we organize basic-unit-region of which vertical and horizontal length are 1/4 of average length of connection components. Second, by merging the basic-unit-regions one other that have smaller values than a given connection intensity threshold. Third, by linking the word blocks with similar block anagles, initial strings are cresed. Finally the whold strings are generated by merging remaining word blocks whose angles are not decided, if their height and prosition are similar to the initial strings. This method can extract strings that are neither horizontal nor of various character sizes. Through computer exteriments with different style documents, we have shown that the feasibility of our method successes.

  • PDF

Precast Concrete Guideway of Automated Guideway Transit with Rubber Tire. (경량전철 고무차륜용 PC슬레브 궤도)

  • 조능호;정원기;이규정;윤태양;이안호
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.295-302
    • /
    • 2000
  • Slab guideway, surface treatment, heat line installation, and joint connection for Automated Guideway Transit with rubber tire are researched. While the AGT with rubber tire is constructed in city, the precast slab guideway must be considered a reduction of the construction period and the noise under construction. which related with environment. To do that, a basic design and the structural analysis for the precast slab guideway with rubber tire are studied. The surface treatment and the heat line installation of that are also compared with currently used methods. Tining method is applied to the surface treatment adopted from the concrete pavement application currently in use. The connection method between the slab of bridge and precast guideway are suggested with a bolt type and a bond type. To minimize noise and vibration of the connection while the AGT is in driving, the slop connection method can be enhanced the serviceability.

  • PDF

Analysis of Deterioration Characteristics for Connection Factor used in Grounding System (접지시스템에 사용되는 접속요소의 열화특성 분석)

  • Gil, Hyoung-Jun;Shong, Kil-Mok;Kim, Young-Seok;Kim, Chong-Min
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.2
    • /
    • pp.9-13
    • /
    • 2015
  • This paper describes the analysis of deterioration characteristics for connection factor used in grounding system. The connection method of grounding system is specified in IEC standard. In order to analyze the deterioration characteristics for connection factor, deterioration test was carried out when the connection factor was buried in salt water and underground. The test connection factors were C-type sleeve, clamp, and exothermic welding. As a consequence, most of the connection factor was corroded, and the electrical resistance decreased after deterioration. The analytical results can be used to establish the safety of grounding system.

Simple Joint Method for the Connection of the Excavation Support System (흙막이 지보공을 연결하기 위한 심플 조인트 공법)

  • Oh, Sung-Nam;Hong, Seong-Young;Bu, Sang-Hyeok;Yoo, Ki-Cheong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.336-343
    • /
    • 2005
  • In the braced excavations, careful consideration must be given to the risks of progressive collapse of the entire support system due to failure of a single member. The existing connection methods of the excavation support system results in many problems during construction. To overcome these, simple joint method is proposed in this study. The full scale test and the numerical analysis using finite element method were performed to verify the safety of them. As results, simple joint method was good effective to increase strength. And it was good effective to decrease in numbers of bolt. Also, new method is cheaper than existing connection methods and a good construction as well.

  • PDF

Connection Behavior of FRP Box Member of Connection Method (연결방법에 따른 FRP 박스 부재의 연결거동 특성)

  • Jang, Hwa-Sup;Kim, Ho-Sun;Kwak, Kae-Hwan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.5
    • /
    • pp.455-463
    • /
    • 2010
  • This is a basic experimental study to apply FRP modular box member to a variety of construction structures exposed to flexural strength, such as a slab and a girder. Tests were conducted under various conditions in order to analyze jointing performance features of the developed FRP modular box member as a large section. For the methods of jointing FRP modular box member, chemical connection, mechanical connection, and a combination of both were used to test both vertical and horizontal jointing. As a result of the test, using urethane+two bolts+sheets was the most efficient method of connecting FRP modular box member, and confirmed the efficient behavior by a finite element analysis.

Phase Advance Control to Reduce Torque Ripple of Brush-less DC Motor According to Winding Connection, Wye and Delta

  • Lee, Tae-Yong;Song, Jun-Young;Kim, Jaehong;Kim, Yong-Jae;Jung, Sang-Yong;Je, Jung-Moon
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.2201-2208
    • /
    • 2014
  • In this research, the characteristics of Brush-less DC (BLDC) motor in accordance with winding connection method, both Y-connection and D -connection, has been identified with design methodology simply. BLDC motor has been designed for both winding connections, and their torque analysis has been performed considering ideal current source analysis and voltage source analysis with 6-step control. In addition, to reduce torque ripple of BLDC motor, caused by coil inductance, on voltage source analysis with 6-step control, we have proposed suitable control method which is Phase Advance Control. It is verified that the torque ripple has been decreased by virtue of phase advance control, advancing and widening conduction angle of switching, via performance analysis by Finite Element Analysis.

Investigation of performance of steel plate shear walls with partial plate-column connection (SPSW-PC)

  • Azandariani, Mojtaba Gorji;Gholhaki, Majid;Kafi, Mohammad Ali;Zirakian, Tadeh;Khan, Afrasyab;Abdolmaleki, Hamid;Shojaeifar, Hamid
    • Steel and Composite Structures
    • /
    • v.39 no.1
    • /
    • pp.109-123
    • /
    • 2021
  • This research endeavor intends to use the implicit finite element method to investigate the structural response of steel shear walls with partial plate-column connection. To this end, comprehensive verification studies are initially performed by comparing the numerical predictions with several reported experimental results in order to demonstrate the reliability and accuracy of the implicit analysis method. Comparison is made between the hysteresis curves, failure modes, and base shear capacities predicted numerically using ABAQUS software and obtained/observed experimentally. Following the validation of the finite element analysis approach, the effects of partial plate-column connection on the strength and stiffness performances of steel shear wall systems with different web-plate slenderness and aspect ratios under monotonic loading are investigated through a parametric study. While removal of the connection between the web-plate and columns can be beneficial by decreasing the overall system demand on the vertical boundary members, based on the results and findings of this study such detachment can lower the stiffness and strength capacities of steel shear walls by about 25%, on average.

A basic study of steel-joint connection method of composite precast concrete members (합성 PC부재의 Steel-joint Connection Method 개발 기초연구)

  • Kim, Geun-Ho;Lee, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.10-11
    • /
    • 2013
  • Green Frame is a column-beam system formed by composite precast concrete column and beam connected with steel buried in both members. During the installation of Green columns, the columns of Green Frame, covering 3 floors per each piece and beams, the eccentricity can be observed due to the construction error and the weight of beam itself. Such eccentricity may have a little influence on a single frame, yet, it can develop critical issues to the installation of subsequent beams or beams on the upper floors in the context of a building as a whole that has multiple frames. These issues lead to delay in frame installation, decrease of productivity and increase of cost, etc. Therefore, this study presents a steel-joint connection method in order to solve the issues. The steel-joint connection method exists on slope plane and reinforcing plate in steel frame buried in composite PC members. Through this method, the issues can be resolved without requiring additional equipment or manpower.

  • PDF