• 제목/요약/키워드: Connection Schedule

검색결과 42건 처리시간 0.023초

UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 - (Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction -)

  • 박정로;김경환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구 (A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction)

  • 김경훈;김경환;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.886-891
    • /
    • 2007
  • 최근 공정관리를 위한 각종 기법들이 개발되고 있으며, 실질적인 시공프로세스를 구체적인 3차원 이미지로 형상화하여 보여줌으로써, 공정계획에 대한 추상적인 개념 모델을 구체적인 것으로 변환하여 발전시킬 수 있다. 하지만 이는 3D-CAD와 공정프로그램을 연계하여 사용하는 방식으로 사람이 정보를 옮겨주거나 입력을 해야 하는 번거로움이 수반된다. 본 연구에서는 3D-CAD 객체 정보 시스템 활용 및 공정자동생성 모듈을 활용하여 통합DB 구축을 통한 실시간 철골공사 공정관리 시스템 프로세스를 구축하였다. 본 연구는 IDEF0 모델을 이용하여 철골공정 관리 프로세스를 제시하였으며, RFID 시스템 설계를 통하여 실시간 진도관리 및 분석 프로세스를 제시하였다. 이를 통해 예상공정정보의 신속한 생성과 실시간으로 실제공정정보와의 비교 ${\cdot}$ 분석 및 시뮬레이션을 실현하고자 한다.

  • PDF

4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성 (Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation)

  • 송성열;양정삼;명태식
    • 산업공학
    • /
    • 제25권2호
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

청소년의 휴대전화 의존, 이용동기 및 결과에 관한 연구 (Mobile Phone Dependency, Motivations and Effects of Mobile Phone Usage Among Korean Adolescents)

  • 성윤숙
    • 아동학회지
    • /
    • 제29권4호
    • /
    • pp.181-197
    • /
    • 2008
  • A mobile phone usage survey was administered to a nationwide sample of 3,617 adolescents. Major motivations of mobile phone usage were mobility/real-time connection, show off, information acquisition, entertainment, dialogue, schedule management, and advice. Maintenance of social relationship with the peer group was most important in mobile phone use. Motivations influenced mobile phone dependency : show off had the strongest influence on anxiety/paranoia followed by dialogue, entertainment, mobility/real-time connection. Without their phones, fashion-oriented adolescents showed mobile phone dependency and anxiety. Stronger dialogue and entertainment motivations were associated with weaker real time connection motivation and stronger paranoia symptoms. Mobile phone dependent adolescents had lower grades, showed lack of attention, had little dialogue with their parents and showed withdrawal from the peer group.

  • PDF

장수명 공동주택용 보-기둥 접합부 시공방법 개발 (Development of Beam-Column Connection for The New Apartment Structural System)

  • 윤태호;홍원기;김선국;박선치;윤대영
    • KIEAE Journal
    • /
    • 제10권6호
    • /
    • pp.145-151
    • /
    • 2010
  • Bearing wall system was used extensively in most multi-residential apartment buildings in Korea. However, bearing wall apartments have the lack of architectural plan flexibility, remodelling-incompatible, causing serious economic losses in terms of construction waste. Recently, many researchers have studied the use of Rahmen structure as a potential alternative. The beam-column connection in the paper for long-life apartment housing forms connection of a Rahmen structure utilizing the advantages of steel and reinforced concrete. In addition, reduction of cast-in place concrete and construction schedule is expected by using precast concrete. Reduction effect of quantity decreased construction costs and $CO_2$ emission of key construction materials. However, verifying the feasibility of new construction method entails numerous challenges. Accordingly, the purpose of this study is to analyze the construction feasibility of sleeve, coupler, and pressure welding connections for long-life apartment building structure. A 3D modeling software was used to perform the analysis, and a real scale model was created to verify the results of construction feasibility. By verifying the construction feasibility of beam-column connections, this study will contribute to the efficient application of these methods on construction sites.

Max-Plus 대수를 이용한 환승 스케줄 시간표 작성 및 분석 (Timetabling and Analysis of Train Connection Schedule Using Max-Plus Algebra)

  • 박범환
    • 한국철도학회논문집
    • /
    • 제12권2호
    • /
    • pp.267-275
    • /
    • 2009
  • Max-Plus 대수란, 선형 대수(linear algebra)에서의 더하기(addition) 연산과 곱하기(multiplication)연산을 최대값(maximization), 더하기(addition)로 각각 대체한 비선형 시스템을 말한다. Max-Plus 대수는 전통적인 의미의 선형 대수에서 다뤄지는 고유값(eigenvalue), 고유벡터(eigenvector), 안전성(stability) 등의 개념이 Max-Plus 대수에서도 그대로 적용되고, 그것의 의미 또한 실제 시스템의 다양한 해석을 가능케 하고 있어, 최대값 연산과 더하기 연산으로 이루어진 이산 사건 시스템(discrete event system)을 분석할 수 있는 유용한 도구가 된다. 이러한 이산 사건 시스템의 대표적인 예가 바로 환승을 고려한 열차 스케줄이다. 현재 수도권에는 1호선${\sim}$8호선, 인천 1호선, 분당선, 중앙선 등 11개 노선의 도시 철도가 운영되고 있다. 각 노선들은 서울 Metro, 서울도시철도공사, KORAIL 등 서로 다른 운영사에 의해 운영되고 있어서 각 노선의 스케줄 또한 노선간의 환승을 고려하지 않은 채 독립적으로 작성되고 있는 실정이다. 이러한 독립적인 열차 스케줄은 승객들의 긴 환승시간으로 이어진다. 본 연구에서는 Max-flus대수 방법론에 대한 자세한 설명을 기초로 1호선과 2호선, 4호선의 주요 환승역인 사당역과 신도림역, 시청역, 동대문역을 중심으로 Max-Plus 대수 방법론의 적용 가능성을 검토해 보았다.

4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구 (A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation)

  • 박상미;이재희;윤형석;황재영;강효정;강인석
    • 대한토목학회논문집
    • /
    • 제42권6호
    • /
    • pp.861-868
    • /
    • 2022
  • 건설공사의 시공과정에 BIM을 적용하는 목적은 시공 간섭의 파악과 함께 공사일정의 경과에 따른 시공현황의 시각화가 주요 이유이다. 4D시뮬레이션은 이러한 목적의 수행 기능이며, 이를 위해서는 공정별 시작 및 종료일자와 해당 공정의 3D모델이 갖추어져야 하고, 실무적 편리성을 확보하기 위해서는 이러한 기본정보의 활용이 간편한 기능 구성이 필요하다. 본 연구에서는 4D 모델 구성을 간소화하기 위해 설계단계에서 제작된 BIM 모델의 최소한의 속성정보를 활용하여 시공단계에 활용 가능한 공정 정보를 군집알고리즘을 이용해 생성하며 실제 공정관리 정보로서의 활용성을 분석한다.

천장 브래킷을 이용한 완전강접합 모듈러 시스템의 구조성능 (Structural Performance of the Modular System with Fully Restrained Moment Connections using Ceiling Bracket)

  • 이승재;곽의신;박재성;강창훈;손수덕
    • 대한건축학회논문집:구조계
    • /
    • 제33권12호
    • /
    • pp.37-44
    • /
    • 2017
  • Due to structural characteristics, construction costs and duration of a modular system would be saved by minimizing the schedule on the job site. As such, it is crucial to develop a connection that can guarantee stiffness while allowing for simple assembling. Particularly, the mid- to high-rise construction of the modular system necessitates the securing of the structural stability and seismic performance of multi-unit frames and connections, and thus, the stiffness of unit-assembled structures needs to be re-evaluated and designed. However, evaluating a frame consisting of slender members and reinforcing materials is a complicated process. Therefore, the present study aims to examine the structural characteristics of a modular unit connection based a method for reinforcing connection brackets and hinges while minimizing the loss of the cross section. Toward this end, the study modeled the beam-to-column connection of a modular system with the proposed connection, and produced a specimen which was used to perform a cycling loading test. The study compared the initial stiffness, the attributes of the hysteretic behavior, and the maximum flexural moment, and observed whether the model acquired the seismic performance, compared to the flexural strength of the steel moment frame connection that is required by the Korean Building Code. The test results showed that the proposed connection produced a similar initial stiffness value to that of the theoretical equation, and its maximum strength exceeded the theoretical strength. Furthermore, the model with a larger ceiling bracket showed higher seismic performance, which was further increased by the reinforcement of the plate.

정보화된 EVMS 구축을 위한 속성코드 연계모형 구성 연구 (A Study on the Connection Model for Attribute Code of Earned Value Management System)

  • 이우식;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.362-365
    • /
    • 2004
  • 본 연구에서는 EVM체계의 정보화 활용성 확보를 위해, 각 성과 정보들에 대한 그래픽 정보의 제공과 공정 및 공사비 정보의 효율적 통합을 위하여 필요로 하는 EVM 속성코드의 연계모형구성을 제안하고 있다. EVM 속성코드는 EVM관련 각종 정보들을 유형화하여 EVM정보관리의 활용성을 높일 수 있도록 제안하는 것이며, EVM정보를 구성하는 일반적 데이터들을 속성코드로 구성하였다. 본 속성코드 연계모형을 통해 EVM시스템 구축 시, EVM 관련 상세정보들의 추출, 정렬 및 그룹화가 가능하며 이로써 공사관리자로 하여금 보다 효율적인 실적정보관리가 가능할 것으로 기대된다.

  • PDF