• 제목/요약/키워드: Connecting tunnel

검색결과 48건 처리시간 0.025초

어류 차단 스크린 설치에 따른 안동-임하호 연결터널 내 흐름변화에 대한 전산유체동역학 수치모의 (Computational Fluid Dynamics Simulation of Flow Pattern Change in the Andong-Imha Reservoir Connecting Tunnel Due to Fish Exclusion Screens)

  • 안상도
    • 한국물환경학회지
    • /
    • 제30권5호
    • /
    • pp.477-485
    • /
    • 2014
  • Imha Reservoir is connected to Andong Reservoir via a diversion tunnel allowing water to pass between. The diversion tunnel is equipped with screens to exclude exotic largemouth bass due to their predatory impacts on prey assemblages resulting in a degradation of species richness of local fish fauna and extinction of local fish populations in Korea. Flow pattern changes resulting from the fish screens and trash racks were investigated using a computational fluid dynamics (CFD) model. Numerical simulations showed that the decrease in the discharge capacity of the tunnel is approximately 8.6% and the headloss coefficient for fish screen at Andong intake tower was determined to be 1.5. In order not to allow the small fishes enough to pass through the wire openings enter into Imha Reservoir through tunnel, the velocity in the tunnel should be greater than 1.48 m/s which is a critical ascending velocity of the bass. This study suggests that it can keep the velocity higher enough to exclude largemouth bass when a gate opens with the condition of 1.0m difference in water stage between two reservoirs.

연속압출공법(ILM)을 이용한 수저(水底)터널공법에 관한 연구 (The Continuously Underwater Tunnelling Methods by Incremental launching Methods)

  • 정병률;류동훈;김준모
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.28-41
    • /
    • 2009
  • We know the several construction methods for underwater tunnel, but properly submerged concrete box type tunnel was mostly good structure stability and mostly shot length of tunnels. Submerged box type tunnel was buildup the unit segments in dry dock or ship yard by 10 to 20meters. The submerged box was composed with segments was join each together. It was installing the gate and waterproofing the coupling the front hull of a box. The complete submerged box rise up to the surface water, tow in the submerged box by tugboat, going to the destination of tunnel construction site. Beforehand dredge up soil at the bottom of a underwater, sinking the submerged box, connection together complete submerged box in underwater. The research and development ILM tunneling method is receiving careful study. Biggest weakness in submerged concrete box type tunnel was pressure waterproofing, box to box connecting, complete submerged boxes navigation and installation, after operation the submerged tunnel and management concrete box structure. It was positive evidence in submerged concrete box type tunnel. We make a practical application of the principle "the ILM tunneling method in underwater construction methods."

  • PDF

대구경 Shield TBM공법에 의한 수영강 하저터널 시공계획 및 시공중 발생되는 거동의 공학적 분석 (Construction Plan by Large Diameter Shield TBM Method and Analysis of Deformation on Site Under Soo-Young River)

  • 윤현돈;황규호;최기훈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.25-32
    • /
    • 2001
  • Doosan Construction & Engineering Co., Ltd is building a railway tunnel beneath the Soo-Young River connecting MinLak Station and Centum City Station, a section 230, subway line 2, Pusan City, Korea. When completed the tunnel will have a finished inner diameter of 6.5m(21.311) throughout its total length of 840m(420m = 0.52 miles, Two Single Track Tunnel : 420m+420m). The ground profile of the face toward shield machine is composed of multi layers, silty clay, clayey gravel, soft rock etc. This research paper is to predict ground deformation and variation of stresses around tunnel using Hyperbolic model, and to reflect the works on the next shield tunneling project. And this research paper is analyzed data of measuring instrument (such as settlement gauge, inclinometer, Multiple extensometer, etc.) which is installed along tunnel line for safety of tunnel. For calculations, the finite difference Method is applied. Backfill grouting material is supposed to have instantly strength of 10kg/$\textrm{cm}^2$ above, although its strength is available after 24 hours passed.

  • PDF

지하환기소 대단면 터널 시공 사례 연구 (A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System)

  • 노승환;최성욱;노상림
    • 터널과지하공간
    • /
    • 제27권4호
    • /
    • pp.195-204
    • /
    • 2017
  • 본 사례연구에서는 신림~봉천터널 지하환기소 대단면 터널의 시공 사례를 소개하였다. 환기갱(폭 7.8 m, 높이 6.6 m)에서 환기소(축류팬실, 폭 20.8 m, 높이 12.3 m)로 터널 단면이 확대되는 구간에 대해 안전성 및 시공성 등을 고려하여 점진적인 확대 굴착 방안 및 Q 시스템을 이용한 확폭 구간의 임시 보강 방안이 검토되었다. 확폭이 완료된 이후 대단면 터널은 현장의 암반조건을 확인하고, 전산해석을 이용한 터널의 안정성 검토 등을 통해 암반등급에 따라 굴진장을 일부 조정하고, 터널 상부 굴착을 분할 없이 전단면 굴착으로 변경하여 시공성을 향상시켰다. 본 사례연구에서 소개한 시공 사례가 향후 유사한 조건의 지하환기소 또는 4차로 도로 등의 대단면 터널의 설계 및 시공에 유용한 참고 자료가 될 수 있기를 기대한다.

Hydrodynamic fish modeling for potential-expansion evaluations of exotic species (largemouth bass) on waterway tunnel of Andong-Imha Reservoir

  • Choi, Ji-Woong;An, Kwang-Guk
    • Journal of Ecology and Environment
    • /
    • 제40권2호
    • /
    • pp.125-135
    • /
    • 2016
  • Background: The objectives of this study were to establish a swimming capability model for largemouth bass using the FishXing (version 3) program, and to determine the swimming speed and feasibility of fish passage through a waterway tunnel. This modeling aimed to replicate the waterway tunnel connecting the Andong and Imha Reservoirs in South Korea, where there is a concern that largemouth bass may be able to pass through this structure. As largemouth bass are considered an invasive species, this spread could have repercussions for the local environment. Results: Flow regime of water through the waterway tunnel was calculated via the simulation of waterway tunnel operation, and the capability of largemouth bass to pass through the waterway tunnel was then estimated. The swimming speed and distance of the largemouth bass had a positive linear function with total length and negative linear function with the flow rate of the waterway tunnel. The passing rate of small-size largemouth bass (10-30 cm) was 0%at a flow of $10m^3/s$ due to rapid exhaustion from prolonged upstream swimming through the long (1.952 km) waterway tunnel. Conclusions: The results of FishXing showed that the potential passing rate of large size largemouth bass (>40 cm) through the waterway tunnel was greater than 10%; however, the passage of largemouth bass was not possible because of the mesh size ($3.4{\times}6.0cm$) of the pre-screening structures at the entrance of the waterway tunnel. Overall, this study suggests that the spread of largemouth bass population in the Imha Reservoir through the waterway tunnel is most likely impossible.

연속터널에서 터널출구 미기압파를 저감 할 수 있는 스노우 쉘터 개발에 대한 연구 (The study about the development of snow shelter connecting serial tunnel for reducing the micro-pressure wave)

  • 김동현;강부병
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집E
    • /
    • pp.335-340
    • /
    • 2001
  • There are many tunnels located apart short distance from each other in mountainous country like Korea. Serial tunnels are connected by snow shelter in many cases. This study presents some countermeasures against micro-pressure wave at the tunnel exit using snow shelter. Through 1/60 scale model laboratory test, we find that snow shelter with 3.6m slit and slit cover show the effect of reducing the micro pressure wave to about 50.6%.

  • PDF

발파시 터널 숏크리트의 최대입자속도와 부착상태평가 분석 (Analysis of the peak particle velocity and the bonding state of shotcrete induced by the tunnel blasting)

  • 홍의준;장석부;송기일;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제12권3호
    • /
    • pp.247-255
    • /
    • 2010
  • 숏크리트의 부착강도는 천정부의 낙반방지와 발파진동에 의한 숏크리트 탈락방지에 중요한 역할을 하는 요소이다. 따라서, 숏크리트의 부착상태평가는 품질관리의 주요 요소가 될 수 있다. 본 연구는 터널 내 발파에 의하여 숏크리트에 미치는 최대 입자속도를 예측하고, 발파 진동에 의한 숏크리트의 부착상태를 평가하기 위하여 수행되었다. 이를 위하여 현재 시공중인 터널현장에서 피난연락갱의 발파시 본선부 및 서비스 터널의 발파진동을 측정하였으며 충격반향시험을 수행하여 숏크리트-암반의 부착상태를 평가하였다. 충격반향시험 신호분석을 위하여 시간-주파수 영역 해석 기법을 도입하였으며 평가결과, 국내에서 일반적으로 시행되는 발파조건에서는 숏크리트와 암반의 부착력 손실(들뜸 현상)은 거의 발견되지 않았으며, 숏크리트 부착력 손상 가능성은 낮은 것으로 판단되었다.

단일 휘트스톤 브리지 플렉셔를 이용한 풍동시험에서의 힌지모멘트 측정 연구 (The Study of Hinge Moment Measurement in Wind Tunnel Test Using Single Wheatstone Bridge Flexure)

  • 조철영;박종호
    • 한국군사과학기술학회지
    • /
    • 제19권4호
    • /
    • pp.476-482
    • /
    • 2016
  • In this study, a method using single Wheatstone bridge flexure has been presented to measure hinge moment acting on control surfaces of wind tunnel models. The structural simplicity of the flexure reduces difficulty regarding gauging and wire-routing, and also makes it feasible to install flexures even inside thin wings. Some flexures were designed and fabricated under typical aerodynamic loads in wind tunnel test, and the strains on the flexure according to applied loads were compared with the result of the analysis by finite element method. The relation between applied loads and output signals showed good linearity, and the standard deviation on the residual errors from linear equation obtained by least square method was within 1.0 % of the maximum design moments. In addition, the FEM analysis on the thickness of load-connecting part of the flexure showed that the sensitivity was improved as the thickness became thin as much as desired to avoid buckling.

세그먼트 라이닝 이음부의 모멘트-회전 관계와 지압강도 계산 (An approach for moment-rotation relationship and bearing strength of segment lining's joint)

  • 이영준;정지승
    • 한국터널지하공간학회 논문집
    • /
    • 제23권2호
    • /
    • pp.93-106
    • /
    • 2021
  • 일반적으로 세그먼트 라이닝 터널은 프리캐스트 콘크리트 세그먼트를 연결하여 하나의 링을 구성하고 터널의 진행방향으로 링을 서로 결합하여 형성한 터널을 말한다. 세그먼트 라이닝의 구조적 특성은 세그먼트 이음부의 거동에 따라 크게 달라지므로 이음부를 적절하게 모델링해야 한다. 지반 하중을 받을 때 세그먼트 이음부는 회전에 저항하는 힌지로 작동하며, 모멘트-회전 관계는 비선형 거동을 보인다. 세그먼트 이음부가 라이닝 거동에 미치는 영향을 파악하기 위해 실제 설계에 통용되는 일본 기준 및 Janssen 모델을 적용하여 세그먼트 이음부의 모멘트-회전 관계를 설정하였다. 또한 이 논문은 지압강도를 기초로 세그먼트 이음부의 회전강성을 결정하는 방법을 제시하였다. 가상의 설계조건에서 기존 모델 및 제시된 방법을 적용해 세그먼트 이음부의 회전을 추정하고 세그먼트 라이닝과 이음부에서 발생하는 단면력을 계산하였다. 세그먼트 이음부의 회전이 증가할수록 이음부의 접촉 면적이 감소하므로 세그먼트 이음부의 지압강도를 확인해야 한다. 이 논문은 세그먼트 이음부의 지압강도를 검토하기 위해 세그먼트 이음부의 회전강성을 결정하고 지압강도를 계산하는 일관된 방법을 제시하였다.

유도성 커플러를 이용한 지하공동구의 상태감시시스템 (Implementation of condition monitoring system in underground utility tunnels using inductive coupler)

  • 주우진;김현식
    • 한국정보통신학회논문지
    • /
    • 제21권8호
    • /
    • pp.1597-1603
    • /
    • 2017
  • 지하공동구의 화재 발생 빈도는 다른 화재에 비하여 낮은 편이나 화재로 인한 피해는 경제적 손실 뿐만 아니라 사회운영 마비로 사회적 손실을 초래할 수 있다. 이에 본 논문은 지하공동구 내 설치된 누설 동축케이블을 이용하여 지하공동구의 상태감시시스템 구축에 대한 실증 시험 결과를 제시한다. 이를 위해 지하공동구에 설치된 누설 동축케이블에 삽입손실 특성이 $-6{\pm}2dB$인 유도성 커플러와 200 Mbps급 전력선 통신 모뎀을 연결하여 실증 시험한 결과, 500 m까지 IP 카메라의 송/수신을 확인하였다. 따라서 데이터 전송을 위한 통신선로의 추가 설치 없이도 지하공동구 내 설치된 누설 동축케이블을 이용하여 지하공동구에 상태감시시스템 구축이 가능할 것으로 판단된다.